1. Whether there are special conditions not involving water depth, related to the
Hearing Examiner Meeting · 2026-05-28 · agenda_item
A dock facility is under review for a property located at 140 Wilderness Cay. The applicant is proposing a floating dock that needs to extend at least 5 feet from the mean high water line to clear existing rip rap. The proposed dock would be 6 feet wide, with an additional 9 feet of protrusion allowed, totaling 20 feet. This is to accommodate vessels up to 33 feet and 50 feet in length, and potentially a boatlift. This item is currently under review by the Hearing Examiner. The project involves site preparation to accommodate the dock, including potential work around the shoreline reinforcement, and the installation of the dock structure itself. Contractors specializing in marine construction, site prep, and potentially concrete and utility work related to any necessary power or water hookups could be involved. Reaching out early could provide an advantage as plans and permits are still being finalized.
Industries that could win this work
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Construction (Other)
- Engineering & Architecture
Follow this across meetings
Locations
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.
Crea tu cuenta