7. The boathouse or covered structure must be so located as to minimize the impact on the view of the adjacent
Hearing Examiner Meeting · 2026-05-28 · agenda_item
A petition is under review to construct a fixed and floating-style dock facility at 140 Wilderness Cay. The proposed dock would include one in-water slip for a 50-foot catamaran, one slip for a 33-foot vessel on a boat lift, and a platform lift for non-motorized craft. The total overwater area for the facility is planned to be 972 square feet. This project is currently under review by the Collier County Hearing Examiner. The work would involve site preparation, dock construction, and installation of boat lifts and related structures. Contractors specializing in marine construction, dock building, concrete, and marine engineering could find opportunities. Reaching out to the applicant or project manager early in the review process may provide an advantage before bids and permits are finalized.
- lot depth
- 127 to 132 feet
- lot width
- 120 feet
- dock protrusion
- 68 feet
- vessel length
- 33 LOA
- vessel length
- 50 LOA
- overwater square footage
- 972 square feet
- waterway width
- 384 feet
- dock protrusion percentage
- 18 %
- fixed portion walkway width
- 5 feet
- floating dock width
- 6 feet
- floating dock length
- 50 feet
- drainage easement width
- 20 feet
- petition fee
- 1500 $
- pre-application meeting fee
- 500 $
- legal advertising fee
- 1125 $
Industries that could win this work
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
Follow this across meetings
Applicants and firms
Locations
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.
Crea tu cuenta