Skip to main content

Sé el Primero, Construye Relaciones Duraderas

6. Any other accessory use deemed compatible by the Board of Zoning Appeals or the Hearing

Hearing Examiner Meeting · 2026-06-11 · agenda_item

The Magnolia Pond PUDA project is currently under review. This project proposes development standards for single-family, two-family, multi-family, assisted living, and clubhouse uses. The standards cover minimum lot area, lot width, floor area, setbacks, yard dimensions, distance between structures, and maximum building heights. Specific details include minimum lot areas ranging from 7,500 sq. ft. for single-family to 10,000 sq. ft. for multi-family and assisted living facilities. Minimum lot widths vary from 45 feet for two-family to 100 feet for multi-family. Setbacks and yard requirements are also detailed for principal and accessory structures. This project is in the planning stages, offering an early opportunity for contractors, suppliers, and service providers. Work could involve site preparation, grading, utility installation, foundation and framing, roofing, electrical, plumbing, HVAC, and finishing trades, followed by landscaping. Businesses that can provide services related to residential and commercial construction, site development, and material supply should consider engaging early to understand project needs before bids and permits are finalized.

minimum lot area single family
7,500 sq. ft.
minimum lot width single family
50 '
minimum floor area single family
1,200 sq. ft.
minimum lot area two family
3,000 sq. ft. / unit
minimum lot area multi family
10,000 sq. ft.
minimum lot width two family
45 '
minimum lot width multi family
100 '
minimum floor area two family
1,100 sq. ft. / unit
minimum floor area multi family
650 sq. ft. / unit
minimum lot area assisted living facility
10,000 sq. ft.
minimum lot area clubhouse
7,500 sq. ft.
minimum lot width assisted living facility
75 '
minimum lot width clubhouse
50 '
minimum floor area assisted living facility
NA
minimum floor area clubhouse
NA
maximum building height zoned single family
35 '
maximum building height actual single family
42 '
maximum building height zoned two family
35 '
maximum building height actual two family
57 '
maximum building height zoned multi family
35 '
maximum building height actual multi family
65 '
maximum building height zoned assisted living facility
35 '
maximum building height actual assisted living facility
42 '
maximum building height zoned clubhouse
35 '
maximum building height actual clubhouse
42 '

Industries that could win this work

  • General Contractor
  • Site Prep, Grading & Hardscape
  • Concrete & Masonry
  • Carpentry & Cabinetry
  • Roofing
  • Electrical
  • Plumbing
  • HVAC & Climate Control
  • Painting & Flooring
  • Building & Industrial Supply
  • Real Estate Development
  • Engineering & Architecture
  • Landscaping & Lawn Service

Follow this across meetings

Applicants and firms

Mira los negocios reales detrás de estos números

Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.

Crea tu cuenta