Board of County Commissioners: julio de 2026
Columbia County
p. 19
Board of County Commissioners listed this item on its agenda for 2026-07-16 in Columbia County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-16
- Type:
- Agenda_item
p. 19 4
Board of County Commissioners listed this item on its agenda for 2026-07-16 in Columbia County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-16
- Type:
- Agenda_item
p. 2
This notice concerns a driveway permit application, number 76507, for a property on a private road. The process for this application was affected by a manual entry of an existing driveway inspection. This led to an automated inspection being scheduled and an invoice being generated, which the applicant paid. The county intends to refund the paid fee and close out the application. The current status is that the county staff will refund the money and close the application. This situation involves correcting an administrative process related to driveway permits and inspections. No new construction or development is described, but the situation highlights the administrative processes for driveway permits. Businesses involved in administrative support or permit processing might find this information relevant.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-16
- Type:
- Agenda_item
p. 2
The North Florida Water Utilities Authority is presenting its proposed budget for the 2026-2027 fiscal year to the Board of County Commissioners. This budget outlines projected revenues and expenditures for water and wastewater services, including inter-governmental funding and grants. The proposed budget is currently under review. This financial planning indicates potential future needs for operations, maintenance, and emergency repairs across various water and sewer systems. Businesses involved in utility services, construction, and supply chains may find opportunities as the authority plans its fiscal year. Early engagement with the authority could provide insight into upcoming projects and procurement needs.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-16
- Type:
- Agenda_item
- Applicant:
- North Florida Water Utilities Authority
p. 20
This agenda item is a review of electronic funds transfer (EFT) payments made by Columbia County. The payments are for various vendors including Florida Pest Control, Fueled Outdoors, Fussell Tire and Service, G.W. Hunter, Inc., Grainger, Green Maintenance & Cleaning Inc., Hill Manufacturing Co., Inc., and ICS Cremation and Funeral Home. The item is currently under review by the Board of County Commissioners. This review involves processing past payments and does not represent a new project or development. Therefore, there is no new construction work, site preparation, or material supply opportunity currently indicated by this agenda item. Local contractors, trades, suppliers, and service providers should monitor future agenda items for new project announcements.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-16
- Type:
- Agenda_item
p. 20 5
The Board of County Commissioners is reviewing proposed rates for the Columbia County Water System for Fiscal Year 2027. This review includes proposed customer service charges, readiness charges based on meter size, and volumetric rates for residential and commercial customers. The proposed rates are currently under review. This item does not describe a construction project, but rather a review of utility rates. Therefore, there is no direct construction work or related trades associated with this agenda item. Businesses involved in utility services or financial consulting related to public utilities might find this review relevant for understanding future operational costs and potential impacts.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-16
- Type:
- Agenda_item
p. 21
Board of County Commissioners listed this item on its agenda for 2026-07-16 in Columbia County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-16
- Type:
- Agenda_item
p. 21 6
The Board of County Commissioners for Columbia County is reviewing proposed fiscal year 2027 consolidated rates for the wastewater system. This review includes proposed changes to commercial and residential readiness charges, volumetric rates, and customer service charges. The proposed rates are currently under review by the Board. This review process will set the rates for wastewater services, impacting all users connected to the system. The scope of work involves the administrative and financial planning for the wastewater utility. Businesses that provide services related to utility rate analysis, financial consulting, or administrative support for public utilities may find opportunities. Engaging early in this review process allows interested parties to understand the proposed changes and potentially offer input before final decisions are made.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-16
- Type:
- Agenda_item
p. 22
This agenda item concerns payments processed by Columbia County for various vendors. The payments are part of an EFT (Electronic Funds Transfer) register and include retainage discounts. The listed vendors provide a range of services and supplies, such as media services, office supplies, tape, legal services, and mowing. The payments are scheduled for July 2, 2026. This item is currently in the payment processing stage, indicating that related projects or services have likely been completed or are nearing completion. The scope of work would have involved the services provided by these vendors, which could include media production, office supply delivery, legal counsel, and grounds maintenance. Businesses that supply goods or services to government entities, particularly those involved in administrative, legal, or maintenance functions, may find opportunities. Engaging with county departments early in their planning phases, before specific needs are finalized and procurements are issued, can provide a competitive advantage.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-16
- Type:
- Agenda_item
p. 23
Board of County Commissioners listed this item on its agenda for 2026-07-16 in Columbia County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-16
- Type:
- Agenda_item
p. 23 8
This item concerns proposed adjustments to utility rates based on the Consumer Price Index (CPI). The Board of County Commissioners, Columbia County, is reviewing this matter. The proposal suggests that annual rate adjustments tied to CPI over the past 5-10 years would have resulted in a lesser impact on customers compared to infrequent, larger increases. The average CPI increase since 2010 has been 2.2% per year. This review is currently under consideration. The work involved would be administrative and analytical, focusing on financial modeling and rate setting for utility services. This early stage presents an opportunity for financial consultants and utility management specialists to offer expertise in rate analysis and regulatory compliance. Engaging now, before final decisions are made, allows for input into the process.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-16
- Type:
- Agenda_item
p. 24
Columbia County is processing payments for various vendors through its EFT Register. This includes payments to Performance NAPA LLC, Powerhouse Pest Control Inc., Precision Chemicals, Premier Paper & Janitorial, Primo Brands, Property Appraiser, Public Defender, Public Defender I.T., and Ring Power Corp. These payments are part of ongoing county operations and are scheduled for July 2, 2026. The listed payments cover a range of services and supplies, such as automotive parts, pest control, janitorial supplies, and IT services. This process indicates that the county is actively managing its vendor relationships and operational expenses. Businesses that provide similar goods and services to government entities may find opportunities by engaging with county procurement offices early. Understanding the county's payment cycles and vendor needs can help businesses position themselves for future contracts and supply agreements.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-16
- Type:
- Agenda_item
p. 24 9
This item concerns a comparison of residential combined water and wastewater bills based on monthly usage. The data presented shows a survey average bill of $84.88, with individual rates ranging from $59.30 to $126.14. This information is currently under review by the Board of County Commissioners, Columbia County. While no specific construction project is detailed, this review could lead to future discussions or decisions regarding utility rates and infrastructure needs. Businesses involved in water and wastewater services, as well as those supplying related materials or consulting on utility management, may find it beneficial to monitor this agenda item. Early engagement with county officials or departments involved in utility services could provide insights into potential future needs or projects.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-16
- Type:
- Agenda_item
p. 25
This agenda item involves a review of electronic funds transfer payments for various vendors, including SiteOne Landscape Supply, LLC. The payments are part of the Columbia County Program GM336U2. This item is currently under review by the Board of County Commissioners. The scope of work indicated by the vendor payments includes landscape supply and potentially other services related to county programs. Future phases may involve ongoing supply needs and related services. Local contractors, suppliers, and service providers are encouraged to monitor upcoming county agendas and engage with county staff to understand future needs and potential opportunities as projects progress. Early engagement can provide valuable insight into upcoming bid processes and project requirements.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-16
- Type:
- Agenda_item
p. 26
Board of County Commissioners listed this item on its agenda for 2026-07-16 in Columbia County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-16
- Type:
- Agenda_item
p. 26 11
Board of County Commissioners listed this item on its agenda for 2026-07-16 in Columbia County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-16
- Type:
- Agenda_item
p. 27
The Columbia County Board of County Commissioners is reviewing a proposal for a new development. This project is currently under review by the Board. The scope of work would likely involve site clearing and grading, followed by underground utility installation and road construction. Subsequent phases could include building construction, mechanical and finish trades, and final landscaping. Local contractors, suppliers, and service providers are encouraged to engage early in this process. Understanding the project details before final site plans, bids, and permits are issued can provide a competitive advantage for securing future work.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-16
- Type:
- Agenda_item
- Address:
- 372 West Duval Street, Lake City, Florida 32055
p. 28
A proposal is currently under review by the Board of County Commissioners for Columbia County. The specific details of this proposal, including its location, size, and intended use, are not provided in the posted record. As the item is under review, the early stages of planning and design may be underway. This could eventually lead to work involving site preparation, utility installation, and construction. Local contractors, trades, suppliers, and service providers are encouraged to monitor this item's progress. Engaging early, before formal plans and permits are finalized, offers an advantage in understanding potential future needs.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-16
- Type:
- Agenda_item
p. 29
Board of County Commissioners listed this item on its agenda for 2026-07-16 in Columbia County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-16
- Type:
- Agenda_item
p. 3
Board of County Commissioners listed this item on its agenda for 2026-07-16 in Columbia County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-16
- Type:
- Agenda_item
p. 3
This item is a proclamation recognizing the value of 4-H Summer Day Camps in Columbia County. The Board of County Commissioners is acknowledging the life skills, leadership, and personal growth that youth gain through these programs. In the summer of 2026, eight educational day camps are planned, serving 119 youth. These camps include a "School of Life Skills for Magical Beings" and specialty camps focused on science, agriculture, outdoor education, sewing, and animal science. This proclamation is currently under review by the Board of County Commissioners. While this item does not involve direct construction, it highlights the importance of youth programs that could lead to future community development and workforce preparation. Businesses that support youth education, agriculture, or community services may find opportunities to partner or provide services for similar initiatives in the future. Early engagement with community organizations and local government can identify potential needs for educational supplies, event services, or program support.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-16
- Type:
- Agenda_item
p. 3
The North Florida Water Utilities Authority is presenting its proposed budget for the 2026/2027 fiscal year to the Board of County Commissioners. This budget includes significant increases in contractual services, legal advertising, office supplies, and new leases for IT equipment and office space. The proposed budget also accounts for staff raises and new personnel. This item is currently under review as part of the budget process. The budget proposal indicates potential needs for legal services, IT security and software licensing, office equipment and supplies, and general insurance. Businesses that provide these services may find opportunities as the budget is finalized and implemented. Early engagement could be beneficial as the authority plans its expenditures for the upcoming fiscal year.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-16
- Type:
- Agenda_item
p. 30
Board of County Commissioners listed this item on its agenda for 2026-07-16 in Columbia County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-16
- Type:
- Agenda_item
p. 32
This item concerns a planned public works project for Columbia County. The project involves the development of a new public facility. The specific details of the facility, including its exact location, size, and proposed use, are not yet defined in this initial request. The project is currently under review by the Board of County Commissioners. This early stage means that site planning, design, and permitting processes are yet to be completed. The project is expected to involve significant site preparation, including clearing and grading, followed by utility installation, construction of the main structure, and final landscaping. Local contractors, trades, suppliers, and service providers are encouraged to monitor this project's progress. Engaging early, before detailed plans and bids are finalized, offers the best opportunity to compete for upcoming work.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-16
- Type:
- Agenda_item
- Address:
- 372 West Duval Street, Lake City, Florida 32055
p. 33
Comcast, through its authorized agent Jose Valdovinos, is requesting permission from Columbia County to install buried fiber and coax cable. This proposed installation will occur along several streets including SW Riverside Ave, SW Santa Fe Dr, Washington Ave, SW Dingo Way, SW Nebraska Ter, SW Bumble St, Boston Ter, Central Blvd, SW Montana St, SW Newark Dr, SW Richmond Way, and SW Roberts Ave. The project is currently under review by the Columbia County Board of County Commissioners. This project will involve site preparation for trenching, installation of underground conduit and cables, and restoration of the affected street surfaces. Contractors specializing in underground utility installation, site preparation, and paving could find opportunities as this project moves through the permitting process. Early engagement before final plans and permits are issued may provide a competitive advantage.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-16
- Type:
- Agenda_item
- Address:
- 633 NW 250th St. Newberry, FL 32669
p. 34
Board of County Commissioners listed this item on its agenda for 2026-07-16 in Columbia County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-16
- Type:
- Agenda_item
p. 35
Board of County Commissioners listed this item on its agenda for 2026-07-16 in Columbia County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-16
- Type:
- Agenda_item
p. 36
Columbia County is reviewing plans for a project involving the installation of outside plant construction for coax and fiber optic cable. This work may use existing buried and underground conduit, joint poles, and related items. The project is currently under review by the Board of County Commissioners. The scope of work includes underground cable construction. Local contractors, suppliers, and service providers are encouraged to engage early to understand the project details as plans, bids, and permits are developed. This early engagement can provide an advantage in competing for future work related to this infrastructure development.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-16
- Type:
- Agenda_item
p. 37
Columbia County is reviewing plans for utility improvements that will require significant contractor involvement. The project involves relocating existing utilities that conflict with proposed improvements and ensuring all work meets or exceeds local, state, and federal standards. This project will likely involve site clearing, grading, excavation, underground utility work, and potentially road or driveway modifications. Contractors will be responsible for obtaining all necessary permits and coordinating with the county and utility companies. Safety, including excavation, trenching, shoring, and traffic control, will be a key contractor responsibility. Local contractors, suppliers, and service providers are encouraged to engage early, as this project is currently under review and details regarding site plans, bids, and permits are still being settled. Early involvement can provide a competitive advantage.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-16
- Type:
- Agenda_item
p. 39
Columbia County's Board of County Commissioners is reviewing a proposal that involves underground utility construction. The project details include typical bore pit details and utility crossing details, indicating work related to underground cable construction. This item is currently under review by the Board. The scope of work would likely involve site preparation, excavation, trenching, and the installation of underground utilities and cables. Phases could include initial site clearing, utility trenching, conduit installation, cable pulling, and final site restoration. Local contractors, suppliers, and service providers in site preparation, grading, concrete, utility installation, and electrical trades could find opportunities. Early engagement before final plans and permits are issued may offer a competitive advantage.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-16
- Type:
- Agenda_item
p. 4
This notice concerns a planned Right-of-Way Access/Driveway application for a property located in Columbia County, south of County Road 242. The owner is OOSTERHOUDT F SAMUEL F Ill & GERRI M JOINT LIVING TRUST. This item is currently under review by the Board of County Commissioners. The project involves obtaining a permit for driveway access, which will likely require site preparation, grading, and potentially utility connections. Contractors specializing in site preparation, grading, concrete work, and utility installation may find opportunities. Suppliers of construction materials and equipment could also be involved. Reaching out to the applicant or the Building and Zoning Department early in the process, before final plans and permits are issued, could provide a competitive advantage.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-16
- Type:
- Agenda_item
- Address:
- County Road 242
- Applicant:
- OOSTERHOUDT F SAMUEL F II
p. 4
The Columbia County Board of County Commissioners is reviewing plans for the UF/IFAS Extension Columbia County 4-H Summer Day Camps program for 2026. This program aims to provide a variety of "School of Life Skills" camps, including "Discovering Your Adventure Camp," "Sew Much Fun Camp," "Little Poultry Pals Camp," and "Magic of Leadership" sessions. The initiative is currently under review by the Board of County Commissioners. The project involves planning and executing educational day camps, which may require services for event coordination, supplies, and potentially facility use. Local contractors, trades, suppliers, and service providers are encouraged to monitor the progress of this agenda item. Early engagement before final plans and permits are established could offer a competitive advantage for securing potential work related to the camp programming and operations.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-16
- Type:
- Agenda_item
- Address:
- 437 NW Hall of Fame Dr., Lake City, FL 32055
- Applicant:
- UF /IFAS Extension Columbia County 4-H
p. 4
The North Florida Water Utilities Authority is proposing its budget for Fiscal Year 2026/2027. This budget includes planned expenses for operations and maintenance across several water service areas, including Ellisville, Fort White, Mason City, Catalyst Industrial Park, and CR-137. The proposed budget outlines spending for salaries, insurance, professional and contractual services, utilities, repairs, supplies, and equipment. Specific new line items for Fiscal Year 2026/2027 include professional services for staff engineering, contractual services for compliance, new full-time operator and technician trainee positions, location services, mowing and landscaping, FDEP fees, and equipment leases. This budget proposal is currently under review by the Board of County Commissioners, Columbia County. The planned expenditures suggest opportunities for contractors and suppliers in areas such as professional engineering services, compliance services, landscaping, equipment leasing, and general repairs and maintenance. Engaging early in the review process could provide an advantage before final budget allocations and procurement decisions are made.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-16
- Type:
- Agenda_item
- Applicant:
- North Florida Water Utilities Authority
p. 41
Columbia County is reviewing a proposal for new underground fiber optic cable and innerduct installation. The project involves directional boring to place 315 feet of fiber cable and two 2-inch innerducts. This work will be done with a minimum depth of 36 inches, and will run parallel to the road and cross driveways. The project is currently under review by the Board of County Commissioners. This project will require site preparation, including potential excavation and boring, followed by the installation of underground utilities. The final phase will involve restoration of the site. Local contractors, suppliers, and service providers in site prep, underground utilities, and related trades should consider reaching out to the county or applicant early, as this project is in the early stages of review and before specific bid processes and permits are finalized.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-16
- Type:
- Agenda_item
- Address:
- 1276 RISE R POLE 29.937998,-82.794503
- Applicant:
- COMCAST
p. 42
Columbia County is reviewing a proposal to install underground fiber optic cable. The project involves directional boring to place a 2-inch innerduct for fiber cable. The minimum depth for boring will be 36 inches, with a minimum depth of 42 inches when boring under driveways. This project is currently under review by the Board of County Commissioners. The work will likely involve site preparation, directional boring, and underground utility installation. Contractors specializing in underground utilities, directional boring, and fiber optic cable installation may find opportunities. Reaching out to the county early in the review process could provide an advantage before final plans and permits are issued.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-16
- Type:
- Agenda_item
- Address:
- Columbia County
- Applicant:
- Comcast
p. 44
This project proposes the installation of underground fiber cable and innerduct using directional boring methods. The work involves boring parallel to road right-of-way, with a minimum depth of 36 inches. Specific proposed installations include 310 feet of fiber cable and innerduct, and 325 feet of fiber cable and innerduct. The project is currently under review. This work will involve site preparation for boring, the boring process itself, and the installation of the cable and innerduct. Contractors specializing in underground utility installation, directional boring, and fiber optic cable placement may find opportunities. Engaging early in the review process allows businesses to understand the project scope before final plans and permits are issued.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-16
- Type:
- Agenda_item
- Address:
- SW Santa Fe
- Applicant:
- Comcast
p. 45
Columbia County is planning a new underground fiber optic cable installation project. The project involves directional boring to install approximately 375 feet of fiber cable and two 2-inch HDPE innerducts, with a minimum depth of 36 inches. This project is currently under review by the Board of County Commissioners. The work will likely involve site preparation, directional boring for conduit installation, and fiber optic cable pulling and activation. This early stage presents an opportunity for local contractors, suppliers, and service providers to engage with the county. Reaching out now, before final plans and permits are issued, can provide a competitive advantage for businesses specializing in underground utility construction, directional boring, and fiber optic installation.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-16
- Type:
- Agenda_item
- Address:
- Columbia County
p. 47
Columbia County is reviewing plans for underground fiber cable construction. This project involves directional boring to install approximately 340 feet of fiber cable within a 2-inch HDPE innerduct, and another 80 feet of fiber cable within a 2-inch HDPE innerduct. The work includes directional boring for driveways with a minimum depth of 36 inches and for other areas with a minimum depth of 48 inches. This item is currently under review by the Board of County Commissioners. The project scope includes site preparation for boring pits, the directional boring itself, and the installation of underground conduit and fiber optic cable. Following this, there will be restoration of the site. Local contractors, suppliers, and service providers in site prep, grading, underground utility installation, and fiber optic cable deployment could find opportunities. Early engagement before final plans and permits are issued may offer a competitive advantage.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-16
- Type:
- Agenda_item
- Address:
- Columbia County
- Applicant:
- Comcast
p. 48
Comcast is proposing to install new underground fiber optic cable and two 2-inch HDPE innerducts. This project involves a directional bore, with a minimum depth of 36 inches and a reamer size of 4 inches. The proposed installation will be 400 feet long in one section and 65 feet long in another. This item is currently under review by the Board of County Commissioners, Columbia County. The work will likely involve site preparation, directional boring, and underground utility installation. Contractors specializing in directional boring, underground utilities, and fiber optic cable installation may find opportunities. Reaching out early could provide an advantage before final plans and permits are issued.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-16
- Type:
- Agenda_item
- Applicant:
- Comcast
p. 5
This item concerns a planned development project in Columbia County. The Columbia County Board of County Commissioners will consider a request related to a project at an unspecified location. The project is currently under review by the Board. If approved, this project would likely involve site preparation, including clearing and grading, followed by underground utility work and potentially road construction. Subsequent phases could include building construction and final landscaping. Local contractors, tradespeople, and suppliers should monitor this item as it progresses through the review process. Early engagement before final plans and permits are issued could provide a competitive advantage for securing work.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-16
- Type:
- Agenda_item
- Address:
- 372 West Duval Street, Lake City, Florida 32055
p. 50
Columbia County is reviewing a proposal for underground cable construction. This project involves a directional bore to install approximately 465 feet of fiber cable and two 2-inch innerducts. The bore will be a minimum of 36 inches deep. This project is currently under review by the Board of County Commissioners. The work will likely involve site preparation for the bore path, the directional boring operation itself, and potentially restoration of the surface. Contractors specializing in underground utility installation, directional boring, and related site work may find opportunities. Reaching out to the county early in the review process could provide an advantage before final plans and permits are issued.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-16
- Type:
- Agenda_item
p. 51
Columbia County is reviewing a proposal for underground fiber optic cable installation. This project involves directional boring to install (2) 2-inch HDPE innerducts for a proposed 190-foot fiber optic cable run. The work will require a minimum depth of 36 inches. The project is currently under review by the Board of County Commissioners. This initiative will likely involve site preparation, including clearing and grading within the right-of-way, followed by the directional boring and conduit installation. Final phases would include pulling the fiber optic cable and connecting it. Contractors specializing in underground utility work, directional boring, and fiber optic installation, along with suppliers of conduit and cable, are encouraged to engage early. Understanding the project details before final permits are issued can provide a competitive advantage.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-16
- Type:
- Agenda_item
- Address:
- Columbia County
p. 52
Columbia County is reviewing a proposal to install underground fiber optic cable and innerduct. The project involves directional boring to place the conduit, with a minimum depth of 36 inches. This is a planned infrastructure upgrade. The work would likely involve site preparation for boring access, the directional boring itself, and potentially some restoration of the surface after installation. This early stage means contractors, suppliers, and service providers can engage with the county or applicant to understand the project's scope and timeline. Businesses specializing in underground utility construction, directional boring, and related material supply could find opportunities by connecting now, before final plans and permits are issued.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-16
- Type:
- Agenda_item
- Applicant:
- Comcast
p. 53
This item concerns proposed underground telecommunications facilities, including fiber cable and HDPE innerduct, to be installed via directional bore. The project involves approximately 280 feet of cable and innerduct in one section and 190 feet in another. The directional bore will have a minimum depth of 36 inches. This project is currently under review. The work would involve site preparation for boring, underground utility installation, and potentially restoration of the surface. Contractors specializing in directional boring, underground utilities, and fiber optic installation may find opportunities. Suppliers of conduit, cable, and related materials could also be involved. Engaging early in the review process allows businesses to understand the project scope before final plans and permits are issued.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-16
- Type:
- Agenda_item
- Applicant:
- Comcast
p. 54
This project proposes the installation of approximately 470 feet of fiber cable along with two 2-inch innerducts. The work involves directional boring with a minimum depth of 36 inches and a reamer size of 4 inches. This project is currently under review. The scope of work will likely include site preparation for the bore pits, the directional bore itself, and the installation of the fiber cable and innerducts. Following the underground work, there will be restoration of the bore pit areas. This early stage presents an opportunity for contractors specializing in underground utility installation, directional boring, and site restoration. Reaching out now, before final plans and permits are issued, allows businesses to be considered for this upcoming infrastructure project.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-16
- Type:
- Agenda_item
- Address:
- Columbia County
- Applicant:
- Comcast
p. 55
Comcast is proposing to install fiber optic cable and two 2-inch HDPE innerducts using directional boring methods. The project involves directional bores under roads at various depths, ranging from a minimum of 36 inches to 48 inches, with reamer sizes of 4 inches. The total proposed length for fiber cable and innerduct installation is 395 feet. This project is currently under review. The work will involve site preparation for bore pits, directional drilling, and potentially restoration of disturbed areas. Contractors specializing in underground utility installation, directional boring, and related site work may find opportunities. Engaging early before final plans and permits are issued could provide a competitive advantage.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-16
- Type:
- Agenda_item
- Address:
- Columbia
- Applicant:
- Comcast
p. 56
Columbia County is reviewing a proposal to install new underground fiber optic cable and associated conduit. The project involves directional boring to place approximately 620 feet of fiber cable and two 2-inch conduits. This work will occur within the right-of-way, requiring directional boring under roads at minimum depths of 36 to 48 inches. The project is currently under review by the Board of County Commissioners. If approved, the work would involve site preparation, directional boring, conduit installation, and fiber optic cable pulling. Contractors specializing in underground utility construction, directional boring, and fiber optic installation may find opportunities. Early engagement is advised as plans and permits are still being finalized.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-16
- Type:
- Agenda_item
- Address:
- Columbia County
p. 57
A proposal is under review for the installation of approximately 460 feet of fiber optic cable, which will include two 2-inch innerducts. This project involves a directional bore with a minimum depth of 36 inches and a 4-inch reamer size. The work is planned within the existing right-of-way. This project is currently under review by the Board of County Commissioners. The scope of work would involve site preparation for the bore, the directional boring operation itself, and the installation of the fiber cable and innerducts. This early stage means contractors, suppliers, and service providers can engage now to understand the project details before final plans, bids, and permits are issued. Early engagement offers an advantage in competing for the work.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-16
- Type:
- Agenda_item
p. 58
Comcast is proposing to install new fiber optic cable and innerduct using directional boring methods. The project involves multiple segments of underground cable installation, with lengths ranging from 60 feet to 455 feet. Depths for the directional bores will vary, with minimums of 18 inches, 36 inches, and 48 inches specified for different sections. The work includes preparing bore pits, directional boring under roads and parallel to rights-of-way, and installing the fiber cable and innerduct. This project is currently under review, indicated by the need for a right-of-way permit. The scope of work will likely involve site preparation, excavation for bore pits, directional drilling, conduit installation, cable pulling, and restoration of any disturbed areas. Contractors specializing in underground utility construction, directional drilling, and fiber optic installation may find opportunities. Early engagement is advised as plans and permits are still being finalized.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-16
- Type:
- Agenda_item
- Applicant:
- Comcast
p. 59
This agenda item concerns a proposed underground utility project. The project involves the installation of underground cable within a right-of-way. Specific details include the use of HDPE 13.5 SDR conduit and minimum depths ranging from 36 inches to 42 inches for directional bore and direct bury installations. The project is currently under review by the Board of County Commissioners, Columbia County. This early stage means that detailed site plans, bid packages, and permits are still being developed. The work will likely involve site preparation, trenching or boring for conduit installation, and backfilling. Contractors specializing in underground utilities, directional boring, and site preparation could find opportunities. Reaching out now, before final plans are set, allows businesses to understand the project scope and potentially influence upcoming bid processes.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-16
- Type:
- Agenda_item
- Address:
- Columbia
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, gratis por 7 días. Sin tarjeta de crédito.
Comienza tu prueba gratis