Skip to main content

Sé el Primero, Construye Relaciones Duraderas

Browse Columbia County civic records

Every published record for Columbia County, newest first. Filter by board, year, or industry to jump straight to the records you want, and page through to reach the full archive.

1,985 records

e. Whether the proposed use will adversely influence living conditions in the

Planning & Zoning / Board of Adjust. listed this item on its agenda for 2026-06-25 in Columbia County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Planning & Zoning / Board of Adjust.
Date:
2026-06-25
Type:
Agenda_item

e. Whether the proposed use will adversely influence living conditions in the neighborhood.

Planning & Zoning / Board of Adjust. listed this item on its agenda for 2026-06-25 in Columbia County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Planning & Zoning / Board of Adjust.
Date:
2026-06-25
Type:
Agenda_item

f. All accessory buildings or structures shall comply with other applicable provisions of the

Planning & Zoning / Board of Adjust. listed this item on its agenda for 2026-06-25 in Columbia County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Planning & Zoning / Board of Adjust.
Date:
2026-06-25
Type:
Agenda_item

f. Location of all property lines, existing right-of-way approaches, sidewalks, curbs, and

Planning & Zoning / Board of Adjust. listed this item on its agenda for 2026-06-25 in Columbia County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Planning & Zoning / Board of Adjust.
Date:
2026-06-25
Type:
Agenda_item

f. The proposed height of the communication tower is the minimum necessary by the

This item concerns a proposed communication tower at an unspecified location in Columbia County. The applicant, T-Mobile, states the tower's height is the minimum needed to improve their communications system, filling a coverage and capacity gap. This proposal is currently under review by the Planning & Zoning Board of Adjustments. If approved, the project would involve site preparation, tower construction, and potentially related infrastructure. Local contractors, suppliers, and service providers should monitor this review process. Early engagement before final site plans, bids, and permits are issued could offer a competitive advantage for potential work related to this communication tower project.

Board:
Planning & Zoning / Board of Adjust.
Date:
2026-06-25
Type:
Agenda_item
Applicant:
T-Mobile

f. Water management district surface water management permit.

Planning & Zoning / Board of Adjust. listed this item on its agenda for 2026-06-25 in Columbia County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Planning & Zoning / Board of Adjust.
Date:
2026-06-25
Type:
Agenda_item

f. Whether the proposed use will create or excessively increase traffic congestion or

Planning & Zoning / Board of Adjust. listed this item on its agenda for 2026-06-25 in Columbia County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Planning & Zoning / Board of Adjust.
Date:
2026-06-25
Type:
Agenda_item

f. Whether the proposed use will create or excessively increase traffic congestion or

This item concerns a proposed unmanned facility that will require only infrequent maintenance trips. The facility is planned for an unspecified location in Columbia County. The proposal is currently under review by the Planning & Zoning / Board of Adjust. The project is in its early stages, with the review process indicating potential for future site development. This early stage means there is an opportunity for contractors, suppliers, and service providers to engage before detailed site plans, bids, and permits are finalized. Businesses involved in site preparation, construction, and specialized maintenance could find opportunities as the project moves forward.

Board:
Planning & Zoning / Board of Adjust.
Date:
2026-06-25
Type:
Agenda_item

g. Access to utilities and points of utility hook-up.

Planning & Zoning / Board of Adjust. listed this item on its agenda for 2026-06-25 in Columbia County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Planning & Zoning / Board of Adjust.
Date:
2026-06-25
Type:
Agenda_item

g. No communication tower shall be located in violation of Columbia County Ordinance

This item concerns a proposed communication tower. NextEdge has indicated the proposed location does not violate Columbia County Ordinance number 77-6, which addresses airport hazard zoning. The proposal is currently under review by the Planning & Zoning Board of Adjustments. If approved, this project would involve the installation of a communication tower. This could include site preparation, foundation work, tower erection, and electrical connections. Local contractors, suppliers, and service providers are encouraged to monitor this review process. Early engagement before final site plans and permits are established could offer a competitive advantage.

Board:
Planning & Zoning / Board of Adjust.
Date:
2026-06-25
Type:
Agenda_item
Applicant:
NextEdge

g. Setbacks for communication tower accessory buildings and structures will comply with

This item concerns proposed changes to setback rules for accessory buildings and structures related to communication towers. The Planning & Zoning Board of Adjustment is reviewing a request that could allow these accessory structures to be placed closer to property lines, potentially reducing standard setbacks by up to 50 percent. This adjustment is intended to encourage the shared use of tower sites. The review is currently underway, with a decision pending. If approved, this could lead to the construction of new accessory buildings and equipment shelters at existing or new tower locations. Work could involve site preparation, concrete foundations, building erection, and utility connections. Contractors specializing in site work, concrete, general building construction, and electrical services may find opportunities as these projects move forward. Early engagement before final site plans and permits are issued could be advantageous.

Board:
Planning & Zoning / Board of Adjust.
Date:
2026-06-25
Type:
Agenda_item

g. Whether the proposed use will create a drainage problem.

Planning & Zoning / Board of Adjust. listed this item on its agenda for 2026-06-25 in Columbia County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Planning & Zoning / Board of Adjust.
Date:
2026-06-25
Type:
Agenda_item

g. Whether the proposed use will create a drainage problem.

A proposed facility compound is under review. This compound will be a 100' x 100' fenced area. The project is currently under review by the Planning & Zoning Board of Adjustment in Columbia County. The scope of work would involve site preparation for the fenced area. Early engagement with local contractors, suppliers, and service providers is advised as plans develop.

Board:
Planning & Zoning / Board of Adjust.
Date:
2026-06-25
Type:
Agenda_item

h. Advertising shall be in compliance with the sign regulations contained within these

Planning & Zoning / Board of Adjust. listed this item on its agenda for 2026-06-25 in Columbia County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Planning & Zoning / Board of Adjust.
Date:
2026-06-25
Type:
Agenda_item

h. Location and dimensions of all existing and proposed parking areas and loading areas.

Planning & Zoning / Board of Adjust. listed this item on its agenda for 2026-06-25 in Columbia County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Planning & Zoning / Board of Adjust.
Date:
2026-06-25
Type:
Agenda_item

h. No communication tower shall be located or allowed which causes the existing airport

Planning & Zoning / Board of Adjust. listed this item on its agenda for 2026-06-25 in Columbia County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Planning & Zoning / Board of Adjust.
Date:
2026-06-25
Type:
Agenda_item

h. Whether the proposed use will seriously reduce light and air to adjacent areas.

Planning & Zoning / Board of Adjust. listed this item on its agenda for 2026-06-25 in Columbia County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Planning & Zoning / Board of Adjust.
Date:
2026-06-25
Type:
Agenda_item

h. Whether the proposed use will seriously reduce light and air to adjacent areas.

Planning & Zoning / Board of Adjust. listed this item on its agenda for 2026-06-25 in Columbia County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Planning & Zoning / Board of Adjust.
Date:
2026-06-25
Type:
Agenda_item

i. Location, size, and design of proposed landscaped areas (including existing trees and

This item concerns a proposed project involving landscaped areas, including existing trees and required buffer zones. The specific location, size, and design details are currently under review by the Planning & Zoning Board of Adjustments in Columbia County. This review stage means the project is in its early planning phases. The work would likely involve site preparation, grading, planting of trees and other vegetation, and installation of landscape features. Contractors specializing in landscaping, site preparation, and potentially irrigation systems could find opportunities. Engaging with the project early, before final plans and permits are issued, allows businesses to understand the scope and prepare for potential bids.

Board:
Planning & Zoning / Board of Adjust.
Date:
2026-06-25
Type:
Agenda_item

i. The applicant must provide a written, notarized statement to the Building Department

Planning & Zoning / Board of Adjust. listed this item on its agenda for 2026-06-25 in Columbia County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Planning & Zoning / Board of Adjust.
Date:
2026-06-25
Type:
Agenda_item

Mira los negocios reales detrás de estos números

Obtén los registros reales, con direcciones y directivos, gratis por 7 días. Sin tarjeta de crédito.

Comienza tu prueba gratis