Skip to main content

Sé el Primero, Construye Relaciones Duraderas

F. TRANSPORTATION PLANNING/STUDIES

Indian River County MPO Joint Meeting - CAC and BPAC · 2026-06-02 · agenda_item

The Indian River County MPO is reviewing its Transportation Improvement Program (TIP) for Fiscal Years 2027 through 2031. This program includes planned projects focused on improving transportation safety, bridge and pavement conditions, and overall system performance. Specific projects under consideration include widening of CR 510 and CR-512, intersection improvements at US 1 @ Aviation Blvd., widening of Aviation Blvd., multi-modal safety improvements on 45th St., and safety improvements at the I-95 interchange @ CR-512. The TIP also includes numerous resurfacing projects on roads like 43rd Avenue, SR 60, SR A1A, and US 1, as well as new road construction for 82nd Avenue and a new I-95 interchange at Oslo Rd. This review and planning stage means that detailed site plans, bidding processes, and permits are still being developed. Local contractors, suppliers, and service providers in construction, engineering, and material supply can gain an advantage by engaging early to understand the scope and timing of these planned infrastructure improvements.

Federal Funding 2026/27
609,672
Federal Funding 2027/28
609,672
Federal Funding 2028/29
609,672
Federal Funding 2029/30
609,672
Federal Funding 2030/31
609,672
Federal Funding 5 Yr Total
3,048,360
Total Funds 2026/27
48,936,788
Total Funds 2027/28
36,724,476
Total Funds 2028/29
46,835,420
Total Funds 2029/30
66,389,102
Total Funds 2030/31
55,648,175
Total Funds 5 Yr Total
254,533,961
Total Federal Funds 2026/27
19,427,901
Total Federal Funds 2027/28
25,376,666
Total Federal Funds 2028/29
24,419,861
Total Federal Funds 2029/30
36,469,886
Total Federal Funds 2030/31
15,876,123
Total Federal Funds 5 Yr Total
121,570,437
Number of Fatalities IRC Performance
21.4
Number of Serious Injuries IRC Performance
100.18
Rate of Fatalities per 100 Million Vehicle Miles Traveled (VMT) IRC Performance
1.220
Rate of Serious Injuries per 100 Million Vehicle Miles Traveled (VMT) IRC Performance
5.727
Total Number of Non-motorized Fatalities and Serious Injuries IRC Performance
18.00
Percent of NHS bridges (by deck area) in good condition IRC Performance
87.4 %
Percent of NHS bridges (by deck area) in poor condition IRC Performance
0.00 %
Percent of Interstate pavements in good condition IRC Performance
83.1 %
Percent of Interstate pavements in poor condition IRC Performance
0.00 %
Percent of non-Interstate pavements in good condition IRC Performance
49.8 %
Percent of non-Interstate pavements in poor condition IRC Performance
0.1 %
resurfacing funding
97.951 million
new capacity projects funding
86.769 million

Industries that could win this work

  • General Contractor
  • Site Prep, Grading & Hardscape
  • Concrete & Masonry
  • Painting & Flooring
  • Electrical
  • Plumbing
  • HVAC & Climate Control
  • Roofing
  • Drywall & Insulation
  • Windows, Doors & Glass
  • Building & Industrial Supply
  • Engineering & Architecture
  • Real Estate Development
  • Landscaping & Lawn Service
  • Utilities (Sub)

Follow this across meetings

Mira los negocios reales detrás de estos números

Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.

Crea tu cuenta