F. TRANSPORTATION PLANNING/STUDIES
Indian River County MPO Joint Meeting - CAC and BPAC · 2026-06-02 · agenda_item
The Indian River County MPO is reviewing its Transportation Improvement Program (TIP) for Fiscal Years 2027 through 2031. This program includes planned projects focused on improving transportation safety, bridge and pavement conditions, and overall system performance. Specific projects under consideration include widening of CR 510 and CR-512, intersection improvements at US 1 @ Aviation Blvd., widening of Aviation Blvd., multi-modal safety improvements on 45th St., and safety improvements at the I-95 interchange @ CR-512. The TIP also includes numerous resurfacing projects on roads like 43rd Avenue, SR 60, SR A1A, and US 1, as well as new road construction for 82nd Avenue and a new I-95 interchange at Oslo Rd. This review and planning stage means that detailed site plans, bidding processes, and permits are still being developed. Local contractors, suppliers, and service providers in construction, engineering, and material supply can gain an advantage by engaging early to understand the scope and timing of these planned infrastructure improvements.
- Federal Funding 2026/27
- 609,672
- Federal Funding 2027/28
- 609,672
- Federal Funding 2028/29
- 609,672
- Federal Funding 2029/30
- 609,672
- Federal Funding 2030/31
- 609,672
- Federal Funding 5 Yr Total
- 3,048,360
- Total Funds 2026/27
- 48,936,788
- Total Funds 2027/28
- 36,724,476
- Total Funds 2028/29
- 46,835,420
- Total Funds 2029/30
- 66,389,102
- Total Funds 2030/31
- 55,648,175
- Total Funds 5 Yr Total
- 254,533,961
- Total Federal Funds 2026/27
- 19,427,901
- Total Federal Funds 2027/28
- 25,376,666
- Total Federal Funds 2028/29
- 24,419,861
- Total Federal Funds 2029/30
- 36,469,886
- Total Federal Funds 2030/31
- 15,876,123
- Total Federal Funds 5 Yr Total
- 121,570,437
- Number of Fatalities IRC Performance
- 21.4
- Number of Serious Injuries IRC Performance
- 100.18
- Rate of Fatalities per 100 Million Vehicle Miles Traveled (VMT) IRC Performance
- 1.220
- Rate of Serious Injuries per 100 Million Vehicle Miles Traveled (VMT) IRC Performance
- 5.727
- Total Number of Non-motorized Fatalities and Serious Injuries IRC Performance
- 18.00
- Percent of NHS bridges (by deck area) in good condition IRC Performance
- 87.4 %
- Percent of NHS bridges (by deck area) in poor condition IRC Performance
- 0.00 %
- Percent of Interstate pavements in good condition IRC Performance
- 83.1 %
- Percent of Interstate pavements in poor condition IRC Performance
- 0.00 %
- Percent of non-Interstate pavements in good condition IRC Performance
- 49.8 %
- Percent of non-Interstate pavements in poor condition IRC Performance
- 0.1 %
- resurfacing funding
- 97.951 million
- new capacity projects funding
- 86.769 million
Industries that could win this work
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Painting & Flooring
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Drywall & Insulation
- Windows, Doors & Glass
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Landscaping & Lawn Service
- Utilities (Sub)
Follow this across meetings
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.
Crea tu cuenta