Browse City of Leesburg civic records
Every published record for City of Leesburg, newest first. Filter by board, year, or industry to jump straight to the records you want, and page through to reach the full archive.
961 records
J. Andi Purvis, City Clerk
The City of Leesburg is planning a Fuel Tanks construction project. This project involves adding funding to an existing Public Transportation Grant Agreement between the City and the State of Florida Department of Transportation. The amendment will add $600,000.00 to the project, bringing the total state funding to $1,200,000.00 for the Fuel Farm Tanks Construction. This item is currently under review by the City Commission. The project will involve the construction of fuel tanks, which will likely include site preparation, underground utility work, concrete foundations, and the installation of the tanks themselves. Contractors specializing in heavy construction, utility work, concrete, and tank installation may find opportunities. Reaching out to the City of Leesburg early could provide insight into the project's timeline and procurement process before official bids are released.
- Board:
- City Commission Meeting
- Date:
- 2026-06-08
- Type:
- Agenda_item
R. Henry
City Commission Meeting listed this item on its agenda for 2026-06-08 in City of Leesburg. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- City Commission Meeting
- Date:
- 2026-06-08
- Type:
- Agenda_item
S. She reiterated that their families have been property owners in this county for over 100 years, and we
City Commission Meeting listed this item on its agenda for 2026-06-08 in City of Leesburg. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- City Commission Meeting
- Date:
- 2026-06-08
- Type:
- Agenda_item
a. A public transit provider as defined in s. 341.031(1), F.S.;
City Commission Meeting listed this item on its agenda for 2026-06-08 in City of Leesburg. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- City Commission Meeting
- Date:
- 2026-06-08
- Type:
- Agenda_item
a. RIBS Operations: Randy Oliver, 352 -391-9291, roliver@inframark.com
City Commission Meeting listed this item on its agenda for 2026-06-08 in City of Leesburg. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- City Commission Meeting
- Date:
- 2026-06-08
- Type:
- Agenda_item
a. RIBS shall be responsible , at no cost to the City, for the design, permitting and
The City of Leesburg is reviewing plans for a new City Pipeline project. This project involves the design, permitting, and construction of the pipeline, which will connect to the RIBS Pipeline infrastructure. The RIBS entity is responsible for all costs associated with this project. The project is currently under review, with final construction documents needing City approval. This project will involve site preparation, underground utility work, and pipeline installation. Local contractors, suppliers, and service providers in site prep, grading, underground utilities, and pipeline construction may find opportunities. Early engagement before final plans and permits are set could be advantageous.
- Board:
- City Commission Meeting
- Date:
- 2026-06-08
- Type:
- Agenda_item
- Applicant:
- RIBS
a. RIBS shall be responsible , at no cost to the City, for the design, permitting and
The City of Leesburg is reviewing plans for a new City Pump Station. This station will be located at the City’s Turnpike wastewater treatment plant. RIBS is responsible for the design, permitting, and construction of this pump station at no cost to the City. The project is currently under review, based on a 75% design set, with the City having the right to approve final construction documents. This project will involve site preparation, underground utility work, and the installation of the pump station structure and related mechanical and electrical systems. Local contractors, trades, suppliers, and service providers are encouraged to engage early to understand the project scope and potential involvement as plans and permits are finalized. Early engagement can provide an advantage in securing future work related to this infrastructure development.
- Board:
- City Commission Meeting
- Date:
- 2026-06-08
- Type:
- Agenda_item
- Address:
- City’s Turnpike wastewater treatment plant
- Applicant:
- RIBS
b. An authority created pursuant to chapter 343, F.S., chapter 348, F.S., or chapter 349, F.S.;
City Commission Meeting listed this item on its agenda for 2026-06-08 in City of Leesburg. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- City Commission Meeting
- Date:
- 2026-06-08
- Type:
- Agenda_item
b. RIBS Management: Robert Chandler, 352 -753-6220, iv.chandler@thevillages.com
City Commission Meeting listed this item on its agenda for 2026-06-08 in City of Leesburg. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- City Commission Meeting
- Date:
- 2026-06-08
- Type:
- Agenda_item
b. The City Pump Station will have the capacity to deliver Reject Effluent to RIBS’
This item concerns a planned City Pump Station project in Leesburg. The station is designed to move up to nine and a half million gallons per day of reject effluent to RIBS' disposal facility. The project is currently under review by the City Commission. This project would likely involve site preparation, installation of pumping equipment, and underground piping. Future phases could include electrical connections and control systems. Local contractors, suppliers, and service providers in site preparation, utility work, and equipment supply may find opportunities. Early engagement is advised as plans develop.
- Board:
- City Commission Meeting
- Date:
- 2026-06-08
- Type:
- Agenda_item
b. The capacity of the City Pipeline will be sufficient to accept the City’s Reject
The City of Leesburg is reviewing the capacity of its City Pipeline. This review will determine if the pipeline can accept the City's Reject Effluent. The pipeline's capacity will be assessed for an annual average daily flow of up to nine and a half million gallons per day. This item is currently under review. The project involves assessing existing infrastructure and potentially upgrading or modifying it to meet new flow requirements. This could include work related to water treatment, pipeline maintenance, and flow management systems. Local contractors, suppliers, and service providers in the utility and construction sectors may find opportunities as this project moves forward. Early engagement could provide an advantage as plans and permits are developed.
- Board:
- City Commission Meeting
- Date:
- 2026-06-08
- Type:
- Agenda_item
- Applicant:
- City of Leesburg
c. A public-use airport as defined in s. 332.004, F.S.; or
City Commission Meeting listed this item on its agenda for 2026-06-08 in City of Leesburg. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- City Commission Meeting
- Date:
- 2026-06-08
- Type:
- Agenda_item
c. Leesburg WWTP Operation: Rick Harris, 352-728-9841,
This item concerns the operation of the Leesburg Wastewater Treatment Plant (WWTP). The City Commission of Leesburg is reviewing operational aspects of this facility. While specific details about planned upgrades or new construction are not provided, the ongoing operation of a wastewater treatment plant typically involves regular maintenance, potential system upgrades, and ongoing service needs. This review stage suggests that opportunities for contractors, suppliers, and service providers may arise as operational plans are finalized. Businesses involved in utility services, heavy construction, site maintenance, and specialized equipment supply could find future opportunities. Early engagement with city representatives may provide insight into upcoming needs and procurement processes.
- Board:
- City Commission Meeting
- Date:
- 2026-06-08
- Type:
- Agenda_item
c. Upon completion of construction of the City Pipeline, and when the RIBS
This item concerns the City of Leesburg's potential acceptance of a donated pipeline. The pipeline, referred to as the City Pipeline, will be donated to the City by RIBS upon completion of its construction and when the RIBS Pipeline and disposal facility can accept the City's reject effluent. After the City inspects and approves the pipeline's condition, it will take ownership. The City will then be responsible for the pipeline's operation, maintenance, repair, and replacement. This is an early stage in the public process, as the item is under review by the City Commission. The project involves the eventual operation and maintenance of a significant utility asset, which could lead to future needs for repair, replacement, and ongoing upkeep services. Contractors and suppliers specializing in utility infrastructure, maintenance, and repair may find opportunities as the City assumes responsibility for this asset.
- Board:
- City Commission Meeting
- Date:
- 2026-06-08
- Type:
- Agenda_item
c. Upon completion of construction of the City Pump Station, and when the RIBS
This item concerns the future operation and maintenance of a City Pump Station. The RIBS Pipeline and disposal facility will donate the City Pump Station to the City of Leesburg once construction is finished and the facility can accept the City's reject effluent. The City will then inspect and approve the pump station before accepting the donation. After acceptance, the City will be responsible for operating, maintaining, repairing, and replacing the pump station. This process involves future work related to the ongoing upkeep and potential replacement of city infrastructure. Local contractors, suppliers, and service providers in utilities, construction, and maintenance could find opportunities as the City takes on these responsibilities. Early engagement before specific maintenance plans or replacement schedules are set could provide a competitive advantage.
- Board:
- City Commission Meeting
- Date:
- 2026-06-08
- Type:
- Agenda_item
d. A port listed in s. 311.09(1), F.S.
City Commission Meeting listed this item on its agenda for 2026-06-08 in City of Leesburg. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- City Commission Meeting
- Date:
- 2026-06-08
- Type:
- Agenda_item
d. Leesburg Management: Cliff Kelsey, Director of Public Works, 352 -435-9442,
City Commission Meeting listed this item on its agenda for 2026-06-08 in City of Leesburg. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- City Commission Meeting
- Date:
- 2026-06-08
- Type:
- Agenda_item
d. Once the City Pump Station is complete and in service, it shall solely be utilized
This item concerns the future use of a City Pump Station once it is completed and in service. The station will be used to send reject effluent to the RIBS reject effluent disposal facility. Existing City Reject Effluent pumping facilities may be used for future disposal needs not covered by a future services agreement between the City and RIBS. This item is under review as part of planned infrastructure development. The project involves the completion and activation of a pump station, which will likely require final connections, testing, and commissioning. Following this, ongoing operational and maintenance services may be needed. Contractors specializing in utility infrastructure, pump systems, and related maintenance services could find opportunities. Engaging early allows businesses to understand the project's timeline and potential needs before formal bidding processes begin.
- Board:
- City Commission Meeting
- Date:
- 2026-06-08
- Type:
- Agenda_item
d. Simultaneously with RIBS’ donation of the City Pipeline, RIBS shall provide
This item concerns a planned donation of a City Pipeline by RIBS and its affiliates to the City of Leesburg. Along with the donation, RIBS will provide or arrange for an easement for the ongoing operation, maintenance, repair, and replacement of this pipeline. This is currently under review by the City Commission. The project scope involves the transfer of the pipeline and the establishment of an easement for its future upkeep. This could lead to opportunities for contractors and service providers specializing in pipeline maintenance, repair, and potentially replacement. Early engagement with the city or RIBS could provide insight into the specific needs and timelines as the project moves through its review process.
- Board:
- City Commission Meeting
- Date:
- 2026-06-08
- Type:
- Agenda_item
- Applicant:
- RIBS
e. RIBS shall be responsible for all facilities downstream of the Point of
This item concerns a planned responsibility for facilities downstream of a Point of Connection. RIBS will manage pipelines, valves, and a reject effluent disposal facility. This project is currently under review. The work will involve the construction and maintenance of underground utilities and disposal systems. This includes site preparation, pipeline installation, and the setup of a specialized disposal facility. Local contractors, suppliers, and service providers should consider engaging early to understand the project's scope and potential needs before final plans and permits are established. Early engagement can provide a competitive advantage.
- Board:
- City Commission Meeting
- Date:
- 2026-06-08
- Type:
- Agenda_item
- Applicant:
- RIBS
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.
Crea tu cuenta