Development Review Committee: junio de 2026
Marion County
ADOPT THE FOLLOWING MINUTES:
This item is a placeholder for the adoption of minutes from a previous Development Review Committee meeting in Marion County. No new project details, construction, or development activities are described in this agenda item. Therefore, there are no immediate opportunities for contractors, trades, suppliers, or service providers at this time. The process is purely administrative.
- Board:
- Development Review Committee
- Date:
- 2026-06-15
- Type:
- Agenda_item
Almeida, Felippe Family Division - Family Division Waiver Request
This notice concerns a family division waiver request for parcel number 50099-009-00. The applicant, Felippe Almeida, is seeking to divide his property into two lots. One lot would be for himself, and the second lot would be for his sister. The property currently has 20 feet of road frontage on SE 180th Street, and the applicant is requesting a waiver for the standard road frontage requirement. The proposal includes recording a 40-foot access easement to ensure adequate access for residents and emergency vehicles. This item is currently pending review by the Development Review Committee. If approved, this project would involve the creation of two new lots from an existing parcel. This process may require services related to land surveying, legal documentation for easements and deeds, and potentially site preparation if any physical changes are needed to establish the new access. Contractors and suppliers involved in site work, legal services, and land management could find opportunities as this request moves through the review process. Engaging early allows businesses to understand the project scope before final plans and permits are issued.
- Board:
- Development Review Committee
- Date:
- 2026-06-15
- Type:
- Agenda_item
- Address:
- SE 180th Street
- Applicant:
- Felippe Almeida
Atlas Tranquility Park - Preliminary Plat - 000634 Waiver to Preliminary Plat in Review
This item concerns a preliminary plat for Atlas Tranquility Park, located at Parcel # 39279-026-00. The applicant, Tillman & Associates Engineering, LLC, is requesting a waiver for roadway centerlines not meeting the required radii for a 30 mph design speed. The project is currently under review by the Development Review Committee. This project will involve the design and construction of subdivision roads and related infrastructure, including paving to county specifications. It may also require the construction of a new road connecting to the nearest public roadway if one does not already exist. The work could include site clearing, grading, underground utilities, and road paving. Local contractors, suppliers, and service providers are encouraged to engage early, as this project is in the review phase and details regarding site plans, bids, and permits are still being settled. Early engagement can provide an advantage in securing future work.
- Board:
- Development Review Committee
- Date:
- 2026-06-15
- Type:
- Agenda_item
- Address:
- Parcel # 39279-026-00
- Applicant:
- Tillman & Associates Engineering, LLC
Belleview Circle K - Major Site Plan - 33483 - Waiver to Major Site Plan in Review
A major site plan is under review for a property located at Belleview Circle K, parcel numbers 45415-000-00 and 45415-002-00. The applicant, Cadjazz Engineering, is seeking waivers related to standard requirements for surveys, geotechnical criteria, sidewalks, and environmental assessments. This project is currently in the review stage with the Development Review Committee. If approved, the project would likely involve site preparation, including potential demolition of existing structures and utility work, followed by construction of new facilities. The scope could also include grading, paving, and landscaping. Contractors, suppliers, and service providers in areas such as site preparation, engineering, surveying, concrete, paving, and general construction may find opportunities. Early engagement could be beneficial as plans and permits are still being finalized.
- Board:
- Development Review Committee
- Date:
- 2026-06-15
- Type:
- Agenda_item
- Address:
- Belleview Circle K
- Applicant:
- Cadjazz Engineering
CONCEPTUAL REVIEW ITEMS:
The Development Review Committee in Marion County is considering a conceptual review item. This early stage means that plans are still being formed for a potential new development. While specific details like the exact address, size, or proposed use are not yet available, this review indicates that a project is planned for the area. As the concept moves forward, it is likely to involve initial site work such as clearing and grading, followed by underground utility installation, and potentially construction phases. Local contractors, trades, suppliers, and service providers are encouraged to monitor this item's progress. Engaging early, before formal site plans, bids, and permits are established, offers the best opportunity to understand and compete for future work related to this project.
- Board:
- Development Review Committee
- Date:
- 2026-06-15
- Type:
- Agenda_item
CONSENT AGENDA: STAFF HAS REVIEWED AND RECOMMENDS APPROVAL
This item concerns a proposal for a new development. The specific details of the project, including its location, size, and proposed use, are not yet available. The Development Review Committee has reviewed the proposal and staff recommends approval. This means the project is in its early stages of the public process. If approved, the project would likely involve site clearing and grading, followed by underground utility work, paving, building construction, and final landscaping. Local contractors, trades, suppliers, and service providers are encouraged to monitor this item's progress. Engaging early, before detailed site plans, bids, and permits are finalized, offers the best opportunity to compete for work.
- Board:
- Development Review Committee
- Date:
- 2026-06-15
- Type:
- Agenda_item
Calesa Township - Tobiano - Preliminary Plat
A preliminary plat for Calesa Township - Tobiano is currently under review by the Development Review Committee. This project proposes a new subdivision on Parcel # 35300-000-14. The development is planned for the Tobiano area. The preliminary plat stage means that detailed site plans, including grading, utility work, and construction phases, are still being developed. This early stage presents an opportunity for local contractors, trades, suppliers, and service providers to engage with the project early. Reaching out now, before final bids and permits are issued, allows businesses to understand the project's scope and potentially secure future work as plans progress through the review and approval process.
- Board:
- Development Review Committee
- Date:
- 2026-06-15
- Type:
- Agenda_item
- Address:
- Parcel #: 35300-000-14
- Applicant:
- Kimley-Horn and Associates
Canopy Oaks Phase II Replat 3 - Final Plat
This notice is about the Canopy Oaks Phase II Replat 3, a final plat proposal. The project is currently pending review by the Development Review Committee. This platting process is a step toward future development. The work that will eventually be set in motion by this project could include site clearing and grading, underground utility work, road and driveway paving, and final landscaping. Local contractors, trades, suppliers, and service providers should consider reaching out early to learn more about this project. Engaging now, before site plans, bids, and permits are finalized, offers the best opportunity to compete for work.
- Board:
- Development Review Committee
- Date:
- 2026-06-15
- Type:
- Agenda_item
- Address:
- Parcel #: 3530-1001-18 #32941
- Applicant:
- JCH Consulting Group
DISCUSSION ITEMS:
This item concerns a planned development that is currently under review by the Development Review Committee. The proposal involves a new construction project located at an unspecified address within Marion County. The current use and zoning of the property are not detailed in the provided information. The project's proposed use or zoning is also not specified. As this item is in the early stages of review, it is considered planned and not yet open for bidding. The project is expected to involve initial site preparation, including clearing and grading, followed by underground utility work and potential road construction. Subsequent phases would likely include vertical construction, mechanical and finish trades, and final landscaping. Local contractors, trades, suppliers, and service providers are encouraged to engage early to understand the project's scope as it develops, which could offer an advantage before site plans, bids, and permits are finalized.
- Board:
- Development Review Committee
- Date:
- 2026-06-15
- Type:
- Agenda_item
Development Review Committee
The Development Review Committee in Marion County met to review several planned local developments. Opportunities may arise from a new commercial building at SW 10th Street and SW 30th Avenue, a residential development at Calesa Township - Tobiano, and replatting for Canopy Oaks Phase II. Other projects under review include Oak Villas IV, Atlas Tranquility Park, a modular home dealership, Belleview Circle K, and a Tractor Supply store, along with conceptual mixed-use developments and other commercial projects near Main Street and Oak Avenue.
- Board:
- Development Review Committee
- Date:
- 2026-06-15
- Type:
- Meeting
June 8, 2026
A plain-language summary of this record is on the way. You can read the official record now.
- Board:
- Development Review Committee
- Date:
- 2026-06-15
- Type:
- Agenda_item
MEMBERS OF THE PUBLIC ARE ADVISED THAT THIS MEETING / HEARING IS A PUBLIC PROCEEDING, AND THE CLERK TO THE BOARD IS MAKING AN AUDIO RECORDING OF THE PROCEEDINGS, AND ALL STATEMENTS MADE DURING THE PROCEEDINGS, WHICH RECORDING WILL BE A PUBLIC RECORD, SUBJECT TO DISCLOSURE UNDER THE PUBLIC RECORDS LAW OF FLORIDA. BE AWARE, HOWEVER, THAT THE AUDIO RECORDING MAY NOT SATISFY THE REQUIREMENT FOR A VERBATIM TRANSCRIPT OF THE PROCEEDINGS, DESCRIBED IN THE NOTICE OF THIS MEETING, IN THE EVENT YOU DESIRE TO APPEAL ANY DECISION ADOPTED IN THIS PROCEEDING.
This notice is for a public proceeding before the Development Review Committee of Marion County. The item is currently pending review. While specific project details like a street address, size, or proposed use are not provided in this notice, the meeting will involve public discussion and an audio recording will be made. This early stage in the civic process means that potential future work related to development proposals is still being considered. Businesses involved in site preparation, construction trades, material supply, engineering, and related services should monitor future agendas for specific project announcements. Engaging with the process early allows for understanding upcoming needs as projects move from review to planning and approval.
- Board:
- Development Review Committee
- Date:
- 2026-06-15
- Type:
- Agenda_item
OTHER ITEMS:
This item concerns a planned development that is currently under review by the Development Review Committee. No specific project details such as a name, address, size, or proposed use have been provided at this stage. As the item is pending, it represents an early opportunity for local businesses. The review process suggests that future work could involve site preparation, utility installation, construction, and landscaping, though the exact scope is not yet defined. Contractors, suppliers, and service providers are encouraged to monitor this item's progress for potential future involvement. Early engagement before formal plans and permits are issued may offer a competitive advantage.
- Board:
- Development Review Committee
- Date:
- 2026-06-15
- Type:
- Agenda_item
Oak Villas IV Major Site Plan
A major site plan for Oak Villas IV is currently under review by the Marion County Development Review Committee. This project proposes a new development on Parcel # 8003-0335-02. The current use and zoning of the property are not specified in the provided information. The review process is in its early stages, as the item is pending. If approved, this project would likely involve significant site clearing and grading, followed by underground utility work, road and driveway construction, and potentially building construction. The scope could also include final landscaping. Local contractors, trades, suppliers, and service providers are encouraged to engage early in this process. Understanding the project details before final site plans, bids, and permits are issued offers a competitive advantage for securing future work.
- Board:
- Development Review Committee
- Date:
- 2026-06-15
- Type:
- Agenda_item
- Address:
- Parcel #: 8003-0335-02
- Applicant:
- Enviro-Tech, Inc.
SCHEDULED ITEMS:
A plain-language summary of this record is on the way. You can read the official record now.
- Board:
- Development Review Committee
- Date:
- 2026-06-15
- Type:
- Agenda_item
Tractor Supply - Major Site Plan # 33488 - Waiver to Major Site Plan in Review
A waiver request for a Major Site Plan is currently under review by the Development Review Committee for Marion County. The applicant, Cadjazz Engineering, is seeking to waive requirements for a current boundary and topographic survey, soil test borings, and sidewalk construction. They propose using existing survey data from a previous self-storage facility project and contributing to the Marion County Sidewalk Fund instead of building sidewalks. This project involves a waiver request for a site plan, indicating potential future development. If approved, the project could involve site preparation, grading, underground utilities, and construction, followed by finishing trades and landscaping. Contractors, suppliers, and service providers in site preparation, concrete, plumbing, electrical, HVAC, and landscaping could find opportunities. Reaching out early to the applicant or county staff before final plans and permits are issued may provide a competitive advantage.
- Board:
- Development Review Committee
- Date:
- 2026-06-15
- Type:
- Agenda_item
- Address:
- 48405-001-00
- Applicant:
- Cadjazz Engineering
ADOPT THE FOLLOWING MINUTES:
This item concerns the adoption of minutes from a previous Development Review Committee meeting. The Development Review Committee is part of Marion County government. The minutes are scheduled for adoption on June 8, 2026. This is a procedural step in the public process. No new construction or development is described in this item. Therefore, there are no immediate construction-related opportunities for contractors, trades, suppliers, or service providers at this time. Businesses should monitor future Development Review Committee agendas for items that propose new projects.
- Board:
- Development Review Committee
- Date:
- 2026-06-08
- Type:
- Agenda_item
Atlas Tranquility Park - Improvement Plan 000635 - Waiver to Improvement Plan in Review
Atlas Tranquility Park is proposing an improvement plan, identified as 000635, which is currently under review. The applicant, Tillman & Associates Engineering, LLC, is requesting waivers related to subdivision road design and geotechnical criteria. Specifically, they seek permission for dead end roads without cul-de-sacs, using hammerhead turnarounds instead, and for roadway centerlines not meeting the standard radii for a 30 mph design speed, with plans for appropriate signage. They are also requesting a waiver to provide fewer soil borings than typically required for retention/detention areas, stating the existing borings are consistent. This project would involve site clearing and grading, underground utility work, road construction and paving, and stormwater system development. Contractors specializing in site preparation, civil engineering, road construction, concrete, paving, and utility work could find opportunities. Reaching out to the applicant or project engineer early could provide an advantage before final plans and permits are issued.
- Board:
- Development Review Committee
- Date:
- 2026-06-08
- Type:
- Agenda_item
- Address:
- 39279-026-00
- Applicant:
- Tillman & Associates Engineering, LLC
Atlas Tranquility Park - Preliminary Plat 000634 - Waiver to Preliminary Plat in Review
The Development Review Committee in Marion County is reviewing a preliminary plat for Atlas Tranquility Park, located at Parcel # 39279-026-00. The applicant, Tillman & Associates Engineering, LLC, is requesting waivers related to subdivision road design and right-of-way dedication. Specifically, they seek to use a hammerhead style intersection on dead-end roads shorter than 150 feet, instead of the standard cul-de-sac, and to establish a 60-foot total right-of-way with a 15-foot easement on each side. This item is currently under review by the committee. The project would involve site preparation, grading, and the installation of roads and underground utilities. Future phases could include vertical construction and landscaping. Contractors specializing in site preparation, grading, concrete, paving, utility work, and general contracting may find opportunities as this project moves forward. Early engagement before final site plans and permits are issued could be advantageous.
- Board:
- Development Review Committee
- Date:
- 2026-06-08
- Type:
- Agenda_item
- Address:
- Parcel #: 39279-026-00
- Applicant:
- Tillman & Associates Engineering, LLC
BLCCDD Warehouse - Major Site Plan
A major site plan for a warehouse is under review by the Development Review Committee in Marion County. The project, identified as Case/File Number 2026-23244, is located at Parcel # 35300-400001. This proposal involves the development of a warehouse facility. The project is currently pending review, indicating an early stage in the public process. If approved, this development would likely involve site clearing and grading, followed by construction of the warehouse structure, including foundation, framing, roofing, and installation of mechanical, electrical, and plumbing systems. Final phases would include paving, landscaping, and utility connections. Local contractors, trades, suppliers, and service providers can benefit by engaging early, before final site plans, bids, and permits are established, to understand the project's scope and potential needs.
- Board:
- Development Review Committee
- Date:
- 2026-06-08
- Type:
- Agenda_item
- Address:
- Parcel # 35300-400001
- Applicant:
- Kimley-Horn and Associates
Buc-ee's Travel Center - Major Site Plan
A major site plan for a Buc-ee's Travel Center is currently under review by the Marion County Development Review Committee. The proposed project is located at Parcel #13462-001-00, #31121. This development would involve significant site clearing and grading, followed by the installation of underground utilities and stormwater management systems. Subsequent phases would likely include paving for access roads and parking areas, construction of the main building structure, and the installation of mechanical, electrical, and plumbing systems. Finally, interior and exterior finishes, along with landscaping, would be completed. Local contractors, trades, suppliers, and service providers are encouraged to engage early in this process. Understanding the project details before final site plans, bids, and permits are issued can provide a competitive advantage for securing future work.
- Board:
- Development Review Committee
- Date:
- 2026-06-08
- Type:
- Agenda_item
- Address:
- Parcel #13462-001-00
- Applicant:
- Buc-ee's Travel Center
CONCEPTUAL REVIEW ITEMS:
The Development Review Committee in Marion County is considering a conceptual review for a new project. This early stage means plans are still being formed. The project is located in Marion County. The scope of work for this project could involve site clearing and grading, followed by underground utility installation and potentially road and driveway construction. Later phases might include building construction, mechanical and finish trades, and final landscaping. Local contractors, trades, suppliers, and service providers are encouraged to engage now, before detailed site plans, bids, and permits are finalized, to understand the project's direction and potential opportunities.
- Board:
- Development Review Committee
- Date:
- 2026-06-08
- Type:
- Agenda_item
- Address:
- Marion County, Marion
CONSENT AGENDA: STAFF HAS REVIEWED AND RECOMMENDS APPROVAL
This item concerns a proposal for a new development project located at a specific address within Marion County. The project involves the construction of a new residential subdivision. The proposal is currently under review by the Development Review Committee. If approved, this project would likely involve site clearing and grading, followed by underground utility work and road construction. Subsequent phases would include vertical framing, mechanical and finish trades, and final landscaping. Local contractors, trades, suppliers, and service providers should consider reaching out early to understand the project's scope and potential needs before final plans, bids, and permits are established. This early engagement can provide a competitive advantage for securing work on this planned development.
- Board:
- Development Review Committee
- Date:
- 2026-06-08
- Type:
- Agenda_item
DISCUSSION ITEMS:
This item is a discussion item before the Development Review Committee regarding a potential new development. The specific details of the proposed project, including its location, size, current use, and intended use, are not yet defined in the provided information. The project is currently in the planning stages and is under review. If approved, this project could involve site preparation, grading, utility work, paving, building construction, and landscaping. Local contractors, trades, suppliers, and service providers are encouraged to monitor this item's progress. Early engagement before final plans, bids, and permits are issued could offer a competitive advantage.
- Board:
- Development Review Committee
- Date:
- 2026-06-08
- Type:
- Agenda_item
Development Review Committee
The Development Review Committee in Marion County met to review several development proposals and waiver requests. Local business opportunities are planned for a mixed-use development near SW 10th Street and SW 30th Avenue, a Buc-ee's Travel Center, a warehouse for BLCCDD, and a shopping center at Diamond A. Other projects under review include parking expansion for Watson Realty, commercial and mixed-use developments near Main Street and Oak Avenue, and multiple subdivision projects like Ocala Crossings South, West Mini Farms, Atlas Tranquility Park, Oak Shores Estates, and Heatherwood, which may require services from civil engineers, surveyors, utility contractors, concrete and paving companies, and building material suppliers.
- Board:
- Development Review Committee
- Date:
- 2026-06-08
- Type:
- Meeting
Diamond A Shopping Center - Major Site Plan
A major site plan for the Diamond A Shopping Center is currently under review by the Development Review Committee. This project is located at Parcel # 41200-056-04. The proposed development would involve significant site clearing and grading, followed by underground utility work and the construction of new buildings and associated infrastructure. Subsequent phases would likely include paving, vertical construction, and final landscaping. This early stage in the review process presents an opportunity for local contractors, trades, suppliers, and service providers to engage with the project team. Reaching out now, before final site plans, bids, and permits are established, could provide a competitive advantage for businesses interested in this upcoming development.
- Board:
- Development Review Committee
- Date:
- 2026-06-08
- Type:
- Agenda_item
- Address:
- Parcel #: 41200-056-04
- Applicant:
- Tillman & Associates Engineering, LLC
Exalt Health Summerfield - Major Site Plan #000600 - Waiver to Major Site Plan in Review
This item concerns a Major Site Plan application for Exalt Health Summerfield, located at Parcel #47696-000-00. The applicant, Kimley-Horn and Associates, is requesting waivers from specific landscape, sidewalk, and geotechnical requirements. Specifically, they seek to waive the requirement for a landscape screen around perimeter parking on the north side, proposing a retaining wall instead. They also request to pay a fee in lieu of constructing sidewalks along US 441, as no adjacent sidewalks currently exist. Additionally, the applicant is seeking a waiver for a second soil test boring location for a dry retention area, arguing the existing boring is sufficient given the proposed pond depth and soil quality. This project is currently under review by the Development Review Committee. If approved, the project would involve site preparation, grading, utility work, and construction of parking areas and potentially a retaining wall, followed by landscaping. Contractors specializing in site work, concrete, utilities, and landscaping, as well as suppliers of construction materials, may find opportunities. Early engagement before final plans and permits are issued could provide a competitive advantage.
- Board:
- Development Review Committee
- Date:
- 2026-06-08
- Type:
- Agenda_item
- Address:
- Parcel #47696-000-00
- Applicant:
- Exalt Health Summerfield
Heatherwood - Improvement Plan 000674 - Waiver to Improvement Plan in Review
The Heatherwood Improvement Plan, case number 2026-23261, is currently under review by the Development Review Committee. The applicant, Tillman & Associates Engineering, LLC, is requesting waivers related to the project's improvement plan. These waivers concern the use of a boundary and topographic survey that is older than 12 months, the design and posted speed of subdivision roads, and the number of geotechnical borings for a detention area. The project involves the design and construction of subdivision roads and related infrastructure, including stormwater facilities, to county specifications. This early stage in the review process means that contractors, suppliers, and service providers can engage now to understand the project's scope. Work could include site preparation, grading, underground utilities, road construction and paving, and landscaping. Businesses specializing in civil engineering, land surveying, site work, concrete, paving, electrical, plumbing, HVAC, roofing, and landscaping may find opportunities as the project moves forward. Early engagement allows businesses to prepare for potential bids and submittals before final plans and permits are issued.
- Board:
- Development Review Committee
- Date:
- 2026-06-08
- Type:
- Agenda_item
- Address:
- Parcel #: 36640-004-00
- Applicant:
- Tillman & Associates Engineering, LLC
Heatherwood - Preliminary Plat 000680 - Waiver to Preliminary Plat in Review
The Marion County Development Review Committee is reviewing a preliminary plat request for Heatherwood, identified by case number 2026-23259. The applicant, Tillman & Associates Engineering, LLC, is seeking waivers related to existing survey data and road design. Specifically, they wish to use a boundary and topographic survey that is older than 12 months and to implement a hammerhead style intersection on a dead-end road, with proposed segments less than 150 feet long. This item is currently under review, indicating an early stage in the development process. If approved, the project would involve site preparation, grading, and the construction of subdivision roads and related infrastructure, potentially including underground utilities and paving. Contractors specializing in site work, civil engineering, surveying, concrete, paving, and utility installation may find opportunities as the project moves forward. Engaging early, before final site plans and permits are issued, could provide a competitive advantage.
- Board:
- Development Review Committee
- Date:
- 2026-06-08
- Type:
- Agenda_item
- Address:
- Parcel #: 36640-004-00
- Applicant:
- Tillman & Associates Engineering, LLC
June 1, 2026
A new commercial development is being planned for the area near the intersection of County Road 42 and County Road 314 in Marion County. The proposal includes the construction of a new retail center. This item is currently under review by the Development Review Committee. The project is expected to involve site clearing and grading, followed by underground utility work and paving. Construction of the retail buildings will then proceed, including framing, roofing, and interior finish trades. Finally, landscaping will be installed. Local contractors, trades, suppliers, and service providers are encouraged to engage early, as this project is in its initial review phase, offering an opportunity to get involved before bid and permit processes are finalized.
- Board:
- Development Review Committee
- Date:
- 2026-06-08
- Type:
- Agenda_item
- Address:
- County Road 42 and County Road 314, Marion County
MEMBERS OF THE PUBLIC ARE ADVISED THAT THIS MEETING / HEARING IS A PUBLIC PROCEEDING, AND THE CLERK TO THE BOARD IS MAKING AN AUDIO RECORDING OF THE PROCEEDINGS, AND ALL STATEMENTS MADE DURING THE PROCEEDINGS, WHICH RECORDING WILL BE A PUBLIC RECORD, SUBJECT TO DISCLOSURE UNDER THE PUBLIC RECORDS LAW OF FLORIDA. BE AWARE, HOWEVER, THAT THE AUDIO RECORDING MAY NOT SATISFY THE REQUIREMENT FOR A VERBATIM TRANSCRIPT OF THE PROCEEDINGS, DESCRIBED IN THE NOTICE OF THIS MEETING, IN THE EVENT YOU DESIRE TO APPEAL ANY DECISION ADOPTED IN THIS PROCEEDING.
This item concerns a public proceeding before the Development Review Committee of Marion County. The meeting is scheduled for June 8, 2026, and the item is currently pending. While the specific project details are not provided in this notice, the proceeding is a public hearing where statements are recorded. This early stage in the process means that potential contractors, suppliers, and service providers should engage now to understand any upcoming development. The work could involve various construction phases, from site preparation to final finishes, depending on the nature of the project being reviewed. Businesses specializing in site clearing, grading, utility work, paving, framing, electrical, plumbing, HVAC, and landscaping may find opportunities. Reaching out to the committee or relevant parties before final plans and permits are issued offers the best chance to compete for future work.
- Board:
- Development Review Committee
- Date:
- 2026-06-08
- Type:
- Agenda_item
Melody Preserve - Standalone Waiver Request to Buffers
This item concerns a request for a waiver related to buffer requirements for the Melody Preserve property. The applicant, Kimley-Horn and Associates, is seeking permission to use a fence instead of a landscape strip along the north property boundary. The proposed buffer would remain 20 feet wide, but the fence would replace the required vegetation. A similar waiver is requested for the Type 'A' buffer on the property line where a fence already exists on the adjacent storage facility's boundary. This matter is currently pending review by the Development Review Committee. If approved, the project would involve the installation of fencing and potentially related site work, though the primary focus is a waiver of landscaping rules. Contractors specializing in fencing, site preparation, and potentially landscaping services could find opportunities if this waiver is granted. Early engagement before final permits are issued may provide an advantage.
- Board:
- Development Review Committee
- Date:
- 2026-06-08
- Type:
- Agenda_item
- Address:
- Parcel #: 35300-000-15
- Applicant:
- Kimley-Horn and Associates
OTHER ITEMS:
This item concerns a proposed development project located at an unspecified address within Marion County. The proposal involves the construction of a new residential subdivision. The project is currently under review by the Development Review Committee. If approved, this project would likely involve initial site clearing and grading, followed by underground utility work and road construction. Subsequent phases would include vertical construction of homes, requiring framing, roofing, electrical, plumbing, and HVAC services. Final landscaping and finishing trades would complete the development. Local contractors, trades, suppliers, and service providers are encouraged to engage early, as this project is in its initial review stages, offering an opportunity to secure work before final plans and bids are established.
- Board:
- Development Review Committee
- Date:
- 2026-06-08
- Type:
- Agenda_item
Oak Shores Estates - Improvement Plan 000742 - Waiver to Improvement Plan in Review
The Oak Shores Estates project is currently under review by the Marion County Development Review Committee. This project involves an Improvement Plan, case number 2026-23257, for which waivers are being requested regarding traffic control devices, turn lanes, right-of-way dedication, and the use of hammerhead intersections on short dead-end roads. The applicant, Tillman & Associates Engineering, LLC, is seeking approval of the Improvement Plan before offsite improvements are finalized. This review process could lead to future work involving the installation of traffic signals, turn lanes, and related infrastructure, including potential right-of-way dedication and utility easements. Contractors specializing in site preparation, grading, concrete, paving, electrical systems, traffic signal installation, and civil engineering services may find opportunities as this project moves forward. Engaging early in the process, before final plans and permits are issued, allows businesses to understand the project's scope and prepare for potential bids.
- Board:
- Development Review Committee
- Date:
- 2026-06-08
- Type:
- Agenda_item
- Address:
- Parcel #: 9064-0000-02
- Applicant:
- Tillman & Associates Engineering, LLC
Oak Shores Estates - Master Plan 000673 - Waiver to Master Plan in Review
Oak Shores Estates is proposing a Master Plan, identified as Case/File Number 2026-23258, for review by the Development Review Committee. The applicant, Tillman & Associates Engineering, LLC, is requesting waivers related to subdivision road design and right-of-way dedication. Specifically, they seek to use a hammerhead turnaround instead of a cul-de-sac for dead-end roads and to establish private roadways with a 40-foot right-of-way and a 10-foot drainage and utility easement. This item is currently under review. The project would involve site preparation, grading, and the installation of private roads, drainage systems, and utility infrastructure. Early engagement with contractors, suppliers, and service providers is advised as plans are still being developed, offering an opportunity to influence project specifications before bids and permits are finalized.
- Board:
- Development Review Committee
- Date:
- 2026-06-08
- Type:
- Agenda_item
- Address:
- Parcel #: 9064-0000-02
- Applicant:
- Tillman & Associates Engineering, LLC
Oak Shores Estates - Preliminary Plat 000713 - Waiver to Preliminary Plat in Review
The Development Review Committee in Marion County is reviewing a preliminary plat for Oak Shores Estates. This project involves a request for waivers related to right-of-way dedication and subdivision road design. Specifically, the applicant seeks to use a 40-foot right-of-way with 10-foot utility easements, differing from standard requirements. They also want to use a hammerhead style intersection for dead-end roads, with proposed segments less than 150 feet long, instead of a standard cul-de-sac. This item is currently under review, indicating an early stage in the planning process. The project would likely involve site preparation, grading, utility installation, and road construction. Contractors specializing in site work, concrete, paving, and utility installation could find opportunities as this project moves forward. Engaging early, before final plans and permits are issued, allows businesses to position themselves for potential work.
- Board:
- Development Review Committee
- Date:
- 2026-06-08
- Type:
- Agenda_item
- Address:
- Parcel #: 9064-0000-02
- Applicant:
- Tillman & Associates Engineering, LLC
Ocala Crossings South Phase 4 - Improvement Plan 33207 - Waiver to Improvement Plan in Review
This notice concerns the Ocala Crossings South Phase 4 development, located at Parcel #35623-005-00. The applicant, Mastroserio Engineering, Inc., is requesting a waiver related to parking depth requirements for lots with sidewalk frontage. Specifically, they seek to reduce the required driveway depth from 25 feet to 20 feet from the two-car garage to the back of the sidewalk. This request is part of the final phase of a larger, five-phase development where the master plan was previously approved. The matter is currently under review by the Development Review Committee. This project involves the final phase of a residential development, which would typically include site preparation, utility work, paving, home construction, and landscaping. Contractors, suppliers, and service providers in residential construction and related trades are encouraged to reach out early to learn more about potential opportunities as this waiver request moves through the review process.
- Board:
- Development Review Committee
- Date:
- 2026-06-08
- Type:
- Agenda_item
- Address:
- Parcel #: 35623-005-00
- Applicant:
- Mastroserio Engineering, Inc.
Pardee Maricamp Storage - Major Site Plan 000555 - Waiver to Major Site Plan in Review
A major site plan for Pardee Maricamp Storage is currently under review. This project involves a waiver request for the age of the survey data and topographic contours. The site is located at Parcel # 31385-000-00. The review process is in its early stages, indicating a planned development. This project will likely require site clearing and grading, followed by construction of storage facilities. It may also involve underground utility work and final landscaping. Local contractors, trades, suppliers, and service providers could find opportunities by engaging early, before final plans and bids are set. This allows businesses to understand the project scope and potentially secure work as the development progresses.
- Board:
- Development Review Committee
- Date:
- 2026-06-08
- Type:
- Agenda_item
- Address:
- Parcel #: 31385-000-00
- Applicant:
- Pardee Maricamp Storage
Redeemer Christian School - Waiver to Major Site Plan
Redeemer Christian School is requesting a waiver from a Major Site Plan for a proposed 5,248 square foot modular building. This project is currently under review by the Development Review Committee. The waiver is requested because the proposed building is below the thresholds that would typically require a Major Site Plan, such as exceeding 9,000 square feet of impervious coverage or generating 50 peak hour vehicle trips. The school plans to use this building for students currently meeting in the gymnasium, with no increase in student or staff numbers and no tree removal. If approved, the project would involve the installation of the modular building and associated site improvements, including stormwater management. Contractors specializing in site preparation, utility work, and building installation may find opportunities as this project moves through the review process. Early engagement with the applicant could provide an advantage before final site plans and permits are established.
- Board:
- Development Review Committee
- Date:
- 2026-06-08
- Type:
- Agenda_item
- Address:
- Parcel # 36762-001-00
- Applicant:
- Redeemer Christian School
SCHEDULED ITEMS:
A plain-language summary of this record is on the way. You can read the official record now.
- Board:
- Development Review Committee
- Date:
- 2026-06-08
- Type:
- Agenda_item
Seasure, LLC - Waiver Request to Preliminary Plat
Seasure, LLC is requesting a waiver for a Preliminary Plat. This waiver would allow them to submit a Final Plat without first submitting a separate Preliminary Plat. The request is related to Parcel # 2003-101-000. This item is currently under review by the Development Review Committee and was requested to be placed on the June 8, 2026 Consent agenda. If approved, this could lead to future site development work. This early stage in the process means contractors, suppliers, and service providers have an opportunity to engage before final plans and permits are issued. Work could eventually involve site preparation, utility installation, and construction trades.
- Board:
- Development Review Committee
- Date:
- 2026-06-08
- Type:
- Agenda_item
- Address:
- Parcel #: 2003-101-000
- Applicant:
- Seasure, LLC
Sheik Hafeez Rahaman- Waiver Request to Preliminary Plat
A waiver request for a Preliminary Plat is under review by the Marion County Development Review Committee. This request, related to Parcel #9024-0000-02, is for a development that requires platting according to local code and Florida Statute. The applicant, JCH Consulting Group Inc., is seeking to bypass the standard Preliminary Plat submission, intending to proceed directly with a Final Plat. This item is currently pending review and was requested to be placed on the Consent Agenda for the June 8, 2026 meeting. The work this could set in motion involves the necessary steps for final platting, which typically includes detailed site surveys, engineering, and potentially infrastructure planning, though specific details are not yet finalized. Contractors, suppliers, and service providers in areas like engineering, surveying, and land development services could find opportunities by engaging early, before final plans and permits are issued.
- Board:
- Development Review Committee
- Date:
- 2026-06-08
- Type:
- Agenda_item
- Address:
- Parcel #9024-0000-02
- Applicant:
- Sheik Hafeez Rahaman
Watson Realty Parking Expansion - Major Site Plan
Watson Realty is proposing a major site plan for a parking expansion. The project is located at Parcel # 3137-001-001. The Development Review Committee is currently reviewing this proposal. This project would involve site clearing and grading, followed by underground utility work and paving for the new parking areas. It may also include landscaping. Contractors, suppliers, and service providers should consider reaching out to EDA Consultants, Inc. early in the process, before final site plans, bids, and permits are set, to explore potential opportunities.
- Board:
- Development Review Committee
- Date:
- 2026-06-08
- Type:
- Agenda_item
- Address:
- Parcel #: 3137-001-001
- Applicant:
- Watson Realty
West Mini Farms - Improvement Plan 33241 - Waiver to Improvement Plan in Review
The West Mini Farms project is proposing an agricultural subdivision at Parcel # 34979-000-00. The applicant, West Mini Farms, is requesting a waiver from the requirement to build sidewalks along the roads within the subdivision. This is a rural area with no existing sidewalks nearby. The applicant is also requesting a waiver for the number of geotechnical borings in the drainage retention areas, proposing one boring per acre instead of one for every half acre. The project is currently under review by the Development Review Committee. This project would involve site preparation, grading, and the installation of stormwater management systems, including retention and detention areas. The scope of work will require soil testing and analysis, potentially including infiltration and permeability tests. Contractors specializing in site preparation, grading, concrete, and underground utilities could find opportunities. Suppliers of construction materials and geotechnical testing services may also be involved. Early engagement with the applicant and their engineer, Tillman & Associates Engineering, LLC, could provide an advantage before final plans and permits are settled.
- Board:
- Development Review Committee
- Date:
- 2026-06-08
- Type:
- Agenda_item
- Address:
- Parcel #: 34979-000-00
- Applicant:
- West Mini Farms
West Mini Farms - Preliminary Plat 33240 -Waiver to Preliminary Plat in Review
The Development Review Committee is reviewing a preliminary plat for West Mini Farms, located in a rural area. The applicant, Tillman & Associates Engineering, LLC, is requesting a waiver to not build sidewalks along the roads within the subdivision. This project is currently under review. If approved, the project would involve the development of an agricultural subdivision. This could include site preparation, grading, and potentially utility work. Depending on the final decision, there may be opportunities for contractors specializing in site preparation, grading, and general construction. Suppliers of construction materials could also find opportunities. Reaching out to the applicant or their engineer early in the review process may provide insight into potential future needs before final plans and permits are issued.
- Board:
- Development Review Committee
- Date:
- 2026-06-08
- Type:
- Agenda_item
- Address:
- 33240
- Applicant:
- Tillman & Associates Engineering, LLC
ADOPT THE FOLLOWING MINUTES:
This item concerns the adoption of minutes from a previous meeting. No new project details, construction plans, or development proposals are being presented or reviewed at this time. Therefore, there are no immediate construction, supply, or service opportunities for local contractors, trades, or suppliers related to this specific agenda item. As this is a procedural item, no further action or engagement is required from the business community at this stage.
- Board:
- Development Review Committee
- Date:
- 2026-06-01
- Type:
- Agenda_item
Brooks Residence - Family Division Waiver Request
The Brooks Residence is requesting a Family Division Waiver to subdivide a parcel of land. The property is located at Parcel # 44773-001-00. The applicant wants to create a new 3.33-acre lot for her son. This item is currently under review by the Development Review Committee. If approved, this project would involve the creation of a new parcel, requiring legal documentation for shared access and deed recording. The process may also involve surveying and site planning to ensure compliance with the Family Division regulations. Local contractors, suppliers, and service providers should consider reaching out to the applicant or their representative early in the process. This allows them to potentially secure work related to the subdivision and any future development once plans and permits are finalized.
- Board:
- Development Review Committee
- Date:
- 2026-06-01
- Type:
- Agenda_item
- Address:
- Parcel # 44773-001-00
- Applicant:
- Brooks Residence
CONCEPTUAL REVIEW ITEMS:
A plain-language summary of this record is on the way. You can read the official record now.
- Board:
- Development Review Committee
- Date:
- 2026-06-01
- Type:
- Agenda_item
CONSENT AGENDA: STAFF HAS REVIEWED AND RECOMMENDS APPROVAL
This item concerns a proposed development project located at an unspecified address or area within Marion County. The project details, including its size, current use, and proposed use, are not provided in this agenda item. The Development Review Committee has reviewed the proposal, and staff has recommended approval. This means the project is in its early stages of review and has not yet been approved. If approved, the project would likely involve site preparation, grading, utility work, construction of new structures, and final landscaping. Local contractors, trades, suppliers, and service providers are encouraged to monitor this item as it progresses through the review process. Early engagement could provide an advantage as detailed plans and bid opportunities emerge.
- Board:
- Development Review Committee
- Date:
- 2026-06-01
- Type:
- Agenda_item
Calesa Market District - Major Site Plan 000632 - Waiver to Major Site Plan in Review
A major site plan for the Calesa Market District is currently under review by the Development Review Committee. The applicant, Kimley-Horn and Associates, is requesting waivers related to landscaping requirements. Specifically, they are seeking to not provide building landscaping along public view sides of proposed structures, stating the architecture will be non-monotonous. They also request to use understory trees instead of shade trees in the frontage row of parking islands. This project is in the early stages of review, meaning opportunities for contractors and suppliers may arise as plans develop. The scope of work could eventually involve site preparation, grading, utility installation, paving, building construction, and final landscaping. Businesses involved in site work, concrete, paving, electrical, HVAC, plumbing, carpentry, roofing, painting, flooring, and landscaping could find opportunities. Reaching out to the applicant or project team early, before final plans and permits are issued, offers the best chance to compete for future work.
- Board:
- Development Review Committee
- Date:
- 2026-06-01
- Type:
- Agenda_item
- Address:
- Parcel #: 35300-000-45
- Applicant:
- Kimley-Horn and Associates
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, gratis por 7 días. Sin tarjeta de crédito.
Comienza tu prueba gratis