CONTRACT AWARD TO LEMARTEC-NV2A FOR CONCOURSE F TO H
Aviation and Seaport Committee · 2026-07-13 · resolution
Miami-Dade County Board of County Commissioners adopted Resolution R-612-26 (File Number 261146) on July 21, 2026, approving a contract between Miami-Dade County and Lemartec-NV2A JV, LLC for the Miami International Airport (MIA) Concourse F to H Interconnector, Contract No. CA004A, in the maximum amount of $50,930,968.00. The project involves construction services for post-security interconnectivity between multiple concourses at MIA, including a new four-story structure connecting Concourse G to Concourse H, tenant relocations for Concourse F to Concourse H, and reconfiguring existing office spaces into a secure/sterile corridor. The contract term is 820 consecutive calendar days from the Notice to Proceed. The base bid was $35,999,471.00, which was 35 percent below the base estimate of $54,974,729.00. The total contract award amount includes a 10 percent contingency of $3,599,947.00, an Inspector General Fee of $125,133.00, an Art in Public Places Fee of $752,674.00, and three Dedicated Allowance Accounts ($100,000.00 for contaminated soil treatment and disposal; $10,000,000.00 for TSA office relocation and refurbishment of existing airline space; and $353,743.00 for permitting costs). Funding sources are Future Financing ($30,930,968.00, 61%) and Federal Aviation Administration Grant ($20,000,000.00, 39%). The project is located at MIA, within District 6, represented by Commissioner Natalie Milian Orbis. The contract was advertised on February 24, 2026, and closed on April 16, 2026, with four bids received. A Responsibility Review was held on April 30, 2026. The project was forwarded to the Board of County Commissioners with a favorable recommendation by the Aviation and Seaport Committee on July 13, 2026, and by the Office of the Chairperson on July 20, 2026. The project manager is Felix Pereira. The contract manager is Sylvia Novela. The company principal is Gilberto Neves. The company location is 3390 Mary Street, Suite 166, Coconut Grove, FL 33133. The project complies with Davis Bacon Wages, the Sustainable Buildings Ordinance, and Sea Level Rise Ordinance 14-79. Liquidated damages are $1,098.98 per calendar day for delay. Liquidated indirect costs recoverable by Lemartec-NV2A are $1,922.88 per day. The annualized cost of routine maintenance is $245,655.00. The life expectancy of the asset is 20 years. The Architect of Record is Carty Architecture. The cost consultant is RIB US Cost, Inc. The design firms are Carty Architecture (Design Packages 1 and 3) and Leo A. Daly (Design Package 2).
Follow this across meetings
Applicants and firms
Locations
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, gratis por 7 días. Sin tarjeta de crédito.
Comienza tu prueba gratis