CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Board of County Commissioners · 2026-07-21 · resolution

Resolution approving Change Order No. 1 to Contract No. S-958 between Miami-Dade County and Lanzo Construction Co., Florida for the D2-C2 project, which includes proposed 16-inch, 12-inch, and 8-inch DI water main and 10-inch and 8-inch DI gravity sewer along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The change order grants a time extension of 1,000 calendar days and increases the contract amount by $5,411,816.28, bringing the total contract award from $7,253,128.25 to $12,664,944.53. The change order is due to differing subsurface conditions, unforeseen conflicts with communication and electrical duct banks, and includes a credit for concrete manhole substitution and replenishes the contingency allowance. The resolution authorizes the County Mayor or designee to execute the change order and use funds from the Building Better Communities General Obligation Bond (GOB) Program Project No. 17. The project was approved by the Board via Resolution No. R-259-22 and originated from Resolution No. R-597-13, which directed a plan to extend sanitary sewer service to commercial and industrial parcels in the Miami-Dade Green Technology Corridor (GTC). The project includes approximately 9,246 linear feet of sanitary sewer mains and 9,851 LF of ductile iron water main service lines. The contract was awarded on November 22, 2021, ratified on March 15, 2022, and the Notice to Proceed was issued on June 1, 2022. The Substantial Completion Date is revised from May 21, 2024 to February 15, 2027, and the Final Completion Date from June 20, 2024 to March 17, 2027. The change order includes $4,680,600.00 for differing sub-surface conditions with a 908-calendar day extension, $595,409.58 for contingency replenishment, $167,731.70 for duct bank conflicts with a 92-calendar day extension, and a $31,925.00 savings for concrete manhole substitution. The contract had an 8 percent SBE-Goods goal and an 18 percent SBE-Con goal; the SBE-Con goal is recommended to be removed. The final action was adopted on July 21, 2026.

Follow this across meetings

Mira los negocios reales detrás de estos números

Obtén los registros reales, con direcciones y directivos, gratis por 7 días. Sin tarjeta de crédito.

Comienza tu prueba gratis