Skip to main content

Sé el Primero, Construye Relaciones Duraderas

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Board of County Commissioners · 2026-07-21 · resolution

Resolution approving Change Order No. 1 to Contract No. S-958 between Miami-Dade County and Lanzo Construction Co., Florida for the D2-C2 project, which includes a 16-inch, 12-inch, and 8-inch DI water main and 10-inch and 8-inch DI gravity sewer along NW 22nd Avenue from NW 79th Street to NW 90th Street and an 8-inch DI force main along NW 87th Street. The change order grants a time extension of 1,000 calendar days and increases the contract amount by $5,411,816.28, bringing the total contract award from $7,253,128.25 to $12,664,944.53. It also authorizes the use of funds from the Building Better Communities General Obligation Bond (GOB) Program Project No. 17-Countywide Water and Sewer System Enhancements to pay in part for the extension of wastewater services along NW 22nd Avenue. The change order addresses differing subsurface conditions, duct bank conflicts, and includes a credit for concrete manhole substitution. The decision was adopted on 7/21/2026. The project is located in Commission District 2, represented by Commissioner Marleine Bastien. The project originated from Resolution No. R-597-13 to extend sanitary sewer service to commercial and industrial parcels within the Miami-Dade Green Technology Corridor (GTC), and is part of the Connect 2 Protect Program. The project includes approximately 9,246 linear feet of sanitary sewer mains and 9,851 LF of ductile iron water main service lines. The original contract was awarded on November 22, 2021, ratified by the Board on March 15, 2022 via Resolution No. R-259-22, with a total award of $7,253,128.25 and a duration of 750 calendar days. The Notice to Proceed was issued on June 1, 2022, with a Substantial Completion Date of May 21, 2024 and Final Completion Date of June 20, 2024. After the change order, the Substantial Completion Date is revised to February 15, 2027 and the Final Completion Date to March 17, 2027. The change order includes $4,680,600.00 for differing sub-surface conditions with a 908-calendar day extension, $595,409.58 for contingency replenishment, $167,731.70 for duct bank conflicts with a 92-calendar day extension, and a $31,925.00 savings for concrete manhole substitution. The SBE-Con goal is recommended to be removed from the project. The additional fiscal impact is funded out of WASD Revenue Bonds Sold, Water Connection Charges, and Future WASD Revenue Bonds, BBC GOB Financing, and Florida Department of Environmental Protection Grant. There is no impact to the General Fund. The project is in WASD's Fiscal Year 2025-2026 Adopted Budget and Multi-Year Capital Plan under Water Reset Program - Small Diameter Water Mains Replacement, Program #2000000072, Volume #3, Page #123 and Commercial and Industrial Corridors - Extension of Sewer System (Connect to Protect), Program #967090, Volume #3, Page #103. The Infrastructure, Innovation & Technology Committee forwarded the item to the BCC with a favorable recommendation on 6/10/2026.

Follow this across meetings

Mira los negocios reales detrás de estos números

Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.

Crea tu cuenta