Skip to main content

Sé el Primero, Construye Relaciones Duraderas

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Board of County Commissioners · 2026-07-21 · resolution

Resolution ratifying Change Order No. 1 to Contract No. S-945 between Miami-Dade County and Ric-Man International, Inc. for construction of a 60-inch Force Main (NL-1A) (West Segment) along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The change order increases the contract amount by $1,662,315.17 and grants a 426-calendar day compensable time extension. The project is approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main. The change order was adopted by the Board of County Commissioners on 7/21/2026. The project has been successfully completed and this change order serves as final contract closeout. The change order addresses utility conflicts, roadway repairs, tree mitigation, pipe interconnection, asbestos cement pipe water main failures, and utility conflicts with Florida Power & Light. The contract was awarded on January 7, 2021 and ratified by the Board on April 20, 2021 via Resolution No. R-343-21. The total contract value increases from $19,314,785.95 to $20,977,101.12. The project is in Commission District 4, represented by Commissioner Micky Steinberg. The project is funded through WASD Revenue Bonds. The change order includes a compensable time extension of 426 calendar days at a rate of $1,893.61 per day. The change order includes $687,529.39 for pipe interconnection, $394,260.99 for tree mitigation, $345,757.80 for asbestos cement pipe failures, $198,596.92 for utility conflicts, and $6,541.35 for road repairs. The change order includes a $56,150.00 Value Engineering credit and reallocation of $720,899.14 in unused contract funds. The project is part of WASD's $8.6 billion Capital Improvement Program. The change order was reviewed for Small Business Enterprise compliance on March 18, 2026. No public comment or stakeholder sentiment is stated in the document.

Follow this across meetings

Mira los negocios reales detrás de estos números

Obtén los registros reales, con direcciones y directivos, gratis por 7 días. Sin tarjeta de crédito.

Comienza tu prueba gratis