Skip to main content

Sé el Primero, Construye Relaciones Duraderas

CHANGE ORDER #1 POOLE & KENT (S-931)

Board of County Commissioners · 2026-09-01 · resolution

Resolution R-751-26 ratifies Change Order No. 1 to Contract No. S-931 between Miami-Dade County and Poole & Kent Company of Florida for the South District Wastewater Treatment Plant Expansion Program Construction Package ST-2A Headworks 3, Oxygenation (O2) Trains 9 & 10, and Substation 57/58. The change order grants a 699-calendar day time extension with no additional fiscal impact. The project was completed. The contract was awarded on May 11, 2021 for $107,605,400.00 with a duration of 792 calendar days. The project increases the permitted average annual daily flow from 112.5 to 131 million gallons per day and peak flow capacity from 285 MGD to 305 MGD. The project includes construction of headworks, two oxygenation trains, odor control facilities, and installation of large diameter pipelines including a connection to an existing 72-inch force main at SW 232nd Street. The project is located at WASD's South District Wastewater Treatment Plant in Commission District 8. The change order was adopted on September 1, 2026. The document does not state a street address, parcel number, or acreage. The document does not state any public comment or stakeholder sentiment.

Follow this across meetings

Mira los negocios reales detrás de estos números

Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.

Crea tu cuenta