CHANGE ORDER #1 POOLE & KENT (S-931)
Board of County Commissioners · 2026-09-01 · resolution
Resolution R-751-26 (File Number 261435) ratifies Change Order No. 1 to Contract No. S-931 between Miami-Dade County and Poole & Kent Company of Florida for the South District Wastewater Treatment Plant Expansion Program Construction Package ST-2A Headworks 3, Oxygenation (O2) Trains 9 & 10, and Substation 57/58. The change order grants a 699-calendar day time extension with no additional fiscal impact. The project increased the permitted average annual daily flow from 112.5 to 131 million gallons per day (MGD) and peak flow capacity from 285 MGD to 305 MGD at the South District Wastewater Treatment Plant. The project was successfully completed. The resolution was adopted on 9/1/2026. The project is located in Commission District 8. The contract was awarded on May 11, 2021, with a total amount not to exceed $107,605,400.00. The Notice to Proceed was issued on August 30, 2021. The project includes construction of headworks, two oxygenation trains, odor control facilities, and installation of large diameter pipelines including a connection to an existing 72-inch force main at SW 232nd Street. Delays were caused by third-party manufacturing issues, field coordination conflicts with adjacent Ocean Outfall Legislation (OOL) projects, and late design and startup-related issues. The project is necessary to meet State-mandated OOL requirements pursuant to section 403.086(9) of the Florida Statutes.
Follow this across meetings
Applicants and firms
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.
Crea tu cuenta