CHANGE ORDER #1 POOLE & KENT (S-931)
Board of County Commissioners · 2026-09-01 · resolution
Resolution ratifying Change Order No. 1 to Contract No. S-931 between Miami-Dade County and Poole & Kent Company of Florida for the South District Wastewater Treatment Plant Expansion Program Construction Package ST-2A Headworks 3, Oxygenation (O2) Trains 9 & 10, and Substation 57/58. The change order grants a 699-calendar day time extension with no additional fiscal impact. The project was performed at WASD's South District Wastewater Treatment Plant, located in Commission District 8. The project will allow for the increase of the permitted average annual daily flow from 112.5 to 131 million gallons per day and the increase of the peak flow capacity of the Plant from 285 MGD to 305 MGD. The project consists of the construction of headworks, two oxygenation trains and odor control facilities and includes the installation of large diameter pipelines, including a connection to an existing 72-inch force main at SW 232nd Street. The contract was awarded on May 11, 2021, with a total award amount not to exceed $107,605,400.00. The resolution was adopted on September 1, 2026. The document does not state any public comment or stakeholder sentiment.
Follow this across meetings
Applicants and firms
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.
Crea tu cuenta