CHANGE ORDER #1 POOLE & KENT (S-931)

Board of County Commissioners · 2026-09-01 · resolution

Resolution ratifying Change Order No. 1 to Contract No. S-931 between Miami-Dade County and Poole & Kent Company of Florida for the South District Wastewater Treatment Plant Expansion Program Construction Package ST-2A Headworks 3, Oxygenation (O2) Trains 9 & 10, and Substation 57/58. Change Order No. 1 grants a 699-calendar day time extension with no additional fiscal impact. The project has been completed and this change order serves as final contract closeout. The project allows for an increase of the permitted average annual daily flow from 112.5 to 131 million gallons per day (MGD) and an increase of peak flow capacity from 285 MGD to 305 MGD. The project includes construction of headworks, two oxygenation trains, odor control facilities, and installation of large diameter pipelines including a connection to an existing 72-inch force main at SW 232nd Street. The contract was awarded on May 11, 2021, with a total amount not to exceed $107,605,400.00. The Notice to Proceed was issued on August 30, 2021. The decision was Adopted on 9/1/2026. File Number: 261435. Reference: R-751-26. Introduced: 8/14/2026. Agenda Item Number: 8O3. The project is located in Commission District 8. Public comment sentiment is not stated.

Follow this across meetings

Mira los negocios reales detrás de estos números

Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.

Crea tu cuenta