Skip to main content

Sé el Primero, Construye Relaciones Duraderas

Browse Miami-Dade County civic records

Every published record for Miami-Dade County, newest first. Filter by board, year, or industry to jump straight to the records you want, and page through to reach the full archive.

15,165 records

HYDRAULIC PARTS

Miami-Dade County Board of County Commissioners adopted Resolution No. R-651-26, authorizing the establishment of Prequalification Pool No. EVN0025344 for Hydraulic Parts, Supplies, and Repair Services. This pool has an allocation of $31,400,591.00 for an eight-year term and will serve multiple County departments. The pool is intended to provide timely access to qualified vendors for maintenance and repair of County equipment, including light and heavy-duty vehicles and machinery. Spot market competitions will be conducted for projects of varying sizes. The pool replaces Prequalification Pool No. RTQ-00580. Seven vendors are recommended for inclusion, with six being local firms and two certified Small Business Enterprise (SBE) firms. The pool will remain open for additional vendor additions. The Department of Transportation and Public Works (DTPW) has an increased allocation due to expanded operational demands and the planned opening of the South Dade Transit Operations Center. The scope is countywide.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Applicant:
Miami-Dade County

HYDRAULIC PARTS

Miami-Dade County is establishing a prequalification pool for Hydraulic Parts, Supplies, and Repair Services, designated as Pool No. EVN0025344. This pool will have a total allocation of $31,400,591.00 and an eight-year term, serving multiple County departments. The purpose is to ensure timely access to qualified vendors for the maintenance and repair of County equipment and fleet, including light and heavy-duty vehicles and machinery. The pool will be structured into two groups: Group 1 for Hydraulic Parts and Supplies, and Group 2 for Hydraulic Repair Services. The Infrastructure, Innovation & Technology Committee forwarded this item to the Board of County Commissioners (BCC) with a favorable recommendation on June 10, 2026. The BCC is scheduled to consider this item on July 21, 2026. Seven vendors have been prequalified for inclusion, with six being local firms and two of those being certified Small Business Enterprise (SBE) firms. The pool will remain open for additional vendor additions. The previous pool, RTQ-00580, expires on October 31, 2026. The increased allocation accounts for higher demand, inflation, and the need to replace aging components. Specific departmental allocations are detailed, with the Department of Transportation and Public Works (DTPW) receiving the largest share ($10,944,000) due to expanded operational demands and fleet maintenance, including support for the new South Dade Transit Operations Center. The County Mayor or designee can award contracts under the pool, with awards exceeding $5,000,000 (or $1,500,000 for the Aviation Department) requiring BCC ratification.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by the Infrastructure, Innovation & Technology Committee; Pending BCC Assignment/Action
Applicant:
Strategic Procurement Department (Requester), Multiple County Departments (Users)

HYDRAULIC PARTS

Miami-Dade County is establishing Prequalification Pool No. EVN0025344 for Hydraulic Parts, Supplies, and Repair Services. The pool has an allocation of $31,400,591.00 for an eight-year term and will serve multiple County departments. This pool replaces a previous one and aims to provide timely access to qualified vendors for maintenance and repair of County equipment, including light and heavy-duty vehicles and fleet machinery. The pool is structured into two groups: Group 1 for parts and supplies, and Group 2 for repair services. Seven vendors have been prequalified, with six being local firms, including two certified Small Business Enterprise (SBE) firms. The pool will remain open for additional vendors. The Infrastructure, Innovation & Technology Committee forwarded this item to the Board of County Commissioners with a favorable recommendation.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation
Applicant:
Strategic Procurement

IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET

Miami-Dade County Board of County Commissioners is considering a resolution (File Number: 260766) to declare the acquisition of Parcel 1 a public necessity for road widening, beautification, and right-of-way improvements to SW 268 Street from US-1 to SW 139 Avenue. The project involves reconstructing and widening SW 268 Street, including sidewalks, drainage, lighting, bicycle facilities, and utility improvements. The estimated cost for design, construction, and right-of-way acquisition is $12,739,000. The Board is authorizing the County Mayor or designee and County Attorney to acquire the property through negotiation, donation, designation, purchase, or eminent domain, with an option for an incentive offer up to 15% over the appraised or tax assessed value. The Transportation Committee forwarded the item with a favorable recommendation.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Resolution declaring acquisition a public necessity, authorizing acquisition actions.
Address:
SW 268 Street from US-1 to SW 139 Avenue
Applicant:
Miami-Dade County Transportation and Public Works

IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET

Miami-Dade County Board of County Commissioners is considering a resolution to declare the acquisition of Parcel 1 a public necessity for road widening, beautification, and right-of-way improvements to SW 268 Street from US-1 to SW 139 Avenue. The project includes reconstruction, widening, sidewalks, drainage, lighting, bicycle facilities, and utility improvements. The Board is authorizing the County Mayor or designee and County Attorney to acquire the property through negotiation, donation, designation, purchase, or eminent domain, with an incentive offer up to 15% over appraised or tax assessed value. The estimated project cost is $12,739,000. The Transportation Committee forwarded the item to the Board with a favorable recommendation.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Transportation Committee; pending BCC Assignment
Address:
SW 268 Street from US-1 to SW 139 Avenue
Applicant:
Miami-Dade County Transportation and Public Works

IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET

Miami-Dade County Board of County Commissioners is considering a resolution to declare the acquisition of Parcel 1 a public necessity for road widening, beautification, and right-of-way improvements to SW 268 Street, from US-1 to SW 139 Avenue. The project includes reconstruction, widening, sidewalks, drainage, lighting, bicycle facilities, and utility improvements. The Board is authorizing the County Mayor or designee and County Attorney to acquire the property through negotiation, donation, designation, purchase, or eminent domain, with an incentive offer up to 15% over appraised or tax assessed value. The estimated project cost is $12,739,000, funded by the FY25-26 Adopted Budget and Multi-Year Capital Plan for road widening and mobility impact fees. Annual maintenance costs are estimated at $5,764.99.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Resolution authorizing acquisition of property for public necessity
Address:
SW 268 Street from US-1 to SW 139 Avenue
Applicant:
Miami-Dade County Transportation and Public Works

IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET

Miami-Dade County is proceeding with improvements to SW 268 Street, specifically the section between US-1 and SW 139 Avenue. This project involves road widening, beautification, and right-of-way improvements, including reconstruction, milling and resurfacing, new drainage, sidewalks, curbs and gutters, signalization, lighting, bicycle facilities, and utility work. The County is declaring the acquisition of Parcel 1 for these improvements as a public necessity. The County Mayor or designee is authorized to acquire Parcel 1 through negotiation, donation, right-of-way designation, or purchase, with compensation based on the higher of appraised or tax assessed values, plus potential incentive offers up to 15% above these values. The estimated project cost for design, construction, and right-of-way acquisition is $12,739,000, funded by the FY25-26 Adopted Budget and Multi-Year Capital Plan for road widening and mobility impact fees. Annual maintenance costs are estimated at $5,764.99. The Transportation and Public Works Department is overseeing the project.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Approved (Resolution declaring acquisition a public necessity, authorizing acquisition actions)
Address:
SW 268 Street from US-1 to SW 139 Avenue
Applicant:
Miami-Dade County Transportation and Public Works

IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET

Miami-Dade County is proceeding with improvements to SW 268 Street, specifically from US-1 to SW 139 Avenue. This project involves road widening, beautification, and right-of-way improvements, including reconstruction, milling and resurfacing, new drainage, sidewalks, curbs and gutters, signalization, lighting, bicycle facilities, and utility work. The County is seeking to acquire Parcel 1 for these improvements. The estimated cost for design, construction, and right-of-way acquisition is $12,739,000. The Transportation and Public Works Department is overseeing the project. The Board of County Commissioners is considering a resolution to declare the acquisition of Parcel 1 a public necessity and to authorize the County Mayor or designee and County Attorney to acquire the property through negotiation, donation, right-of-way designation, purchase, or eminent domain. An incentive offer of up to 15 percent over the appraised or tax assessed value is also authorized. The Transportation Committee forwarded the item with a favorable recommendation.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Transportation Committee; resolution authorizing acquisition is before the Board
Address:
SW 268 Street from US-1 to SW 139 Avenue
Applicant:
Miami-Dade County Transportation and Public Works

IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET

Miami-Dade County Board of County Commissioners (BCC) is considering a resolution to declare the acquisition of Parcel 1 a public necessity for road widening, beautification, and right-of-way improvements to SW 268 Street from US-1 to SW 139 Avenue. The project involves reconstructing and widening SW 268 Street, including sidewalks, curbs and gutters, stormwater drainage, pavement markings, signage, signalization, lighting, bicycle facilities, and Water and Sewer Department utility improvements. The estimated cost for design, construction, CEI, and right-of-way acquisition is $12,739,000. The BCC authorized the County Mayor or designee and County Attorney to acquire the property through negotiation, donation, right-of-way designation, purchase, or eminent domain, with an option for an incentive offer up to 15% over the appraised or tax assessed value. The Transportation Committee forwarded the item to the BCC with a favorable recommendation.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Pending BCC Assignment (Resolution before the Board)
Address:
SW 268 Street from US-1 to SW 139 Avenue
Applicant:
Miami-Dade County Transportation and Public Works

IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET

Miami-Dade County Board of County Commissioners is considering a resolution to declare the acquisition of Parcel 1 a public necessity for road widening, beautification, and right-of-way improvements to SW 268 Street, from US-1 to SW 139 Avenue. The project includes reconstruction, widening, sidewalks, drainage, lighting, and utility improvements. The Board is authorizing the County Mayor or designee and County Attorney to acquire the property through negotiation, donation, designation, purchase, or eminent domain, with an incentive offer up to 15% over appraised or tax assessed value. The estimated cost for design, construction, and right-of-way acquisition is $12,739,000. The Transportation Committee forwarded the item with a favorable recommendation.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation (Transportation Committee); Resolution authorizing acquisition is before the Board.
Address:
SW 268 Street from US-1 to SW 139 Avenue
Applicant:
Transportation and Public Works

IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET

Miami-Dade County Board of County Commissioners is considering a resolution to declare the acquisition of Parcel 1 a public necessity for road widening, beautification, and right-of-way improvements to SW 268 Street, from US-1 to SW 139 Avenue. The project includes reconstruction, widening, sidewalks, drainage, lighting, bicycle facilities, and utility improvements. The Board is authorizing the County Mayor or designee and County Attorney to acquire the property through negotiation, donation, designation, purchase, or eminent domain, with an incentive offer up to 15% over appraised or tax assessed value. The estimated project cost is $12,739,000, funded by the FY25-26 Adopted Budget and Multi-Year Capital Plan for road widening and mobility impact fees. Annual maintenance costs are estimated at $5,764.99.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Resolution authorizing acquisition of Parcel 1 for public necessity, pending Board approval.
Address:
SW 268 Street from US-1 to SW 139 Avenue
Applicant:
Miami-Dade County Transportation and Public Works

IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET

Miami-Dade County is proceeding with improvements to SW 268 Street, specifically from US-1 to SW 139 Avenue. This project involves road widening, beautification, and right-of-way acquisition for Parcel 1. The scope includes reconstruction, widening, milling and resurfacing, new drainage, curbs and gutters, sidewalks, signalization, pavement markings and signage, lighting, bicycle facilities, and Water and Sewer Department utility improvements. The estimated cost for design, construction, and right-of-way acquisition is $12,739,000, funded by the FY25-26 Adopted Budget and Multi-Year Capital Plan for Road Widening Countywide and Mobility Impact Fees. Annual maintenance and operational costs are estimated at $5,764.99. The Transportation and Public Works Department is overseeing the project. The Board of County Commissioners is authorizing the County Mayor or designee and County Attorney to acquire Parcel 1 through negotiation, donation, right-of-way designation, purchase (at appraised or tax assessed value, whichever is higher, plus up to 15% incentive), or eminent domain. The Transportation Committee forwarded this item with a favorable recommendation to the Board of County Commissioners.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Approved (Resolution authorizing acquisition)
Address:
SW 268 Street from US-1 to SW 139 Avenue
Applicant:
Miami-Dade County Transportation and Public Works

IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET

Miami-Dade County Board of County Commissioners is considering a resolution to declare the acquisition of Parcel 1 a public necessity for road widening, beautification, and right-of-way improvements to SW 268 Street from US-1 to SW 139 Avenue. The project involves reconstructing and widening SW 268 Street, including sidewalks, drainage, pavement markings, signalization, lighting, bicycle facilities, and utility improvements. The Transportation Committee forwarded this item to the Board with a favorable recommendation. The estimated cost for design, construction, and right-of-way acquisition is $12,739,000. Public comment is not stated in this document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Pending BCC Assignment (Forwarded to BCC with a favorable recommendation by Transportation Committee)
Address:
SW 268 Street from US-1 to SW 139 Avenue
Applicant:
Miami-Dade County Transportation and Public Works

IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET

Miami-Dade County Board of County Commissioners adopted a resolution declaring the acquisition of Parcel 1 a public necessity for road widening, beautification, and right-of-way improvements to SW 268 Street from US-1 to SW 139 Avenue. The project includes reconstruction, widening, sidewalks, curbs and gutters, stormwater drainage, pavement markings, signage, signalization, lighting, bicycle facilities, and Water and Sewer Department utility improvements. The estimated cost for design, construction, and right-of-way acquisition is $12,739,000. The resolution authorizes the County Mayor or designee and County Attorney to acquire the property through negotiation, donation, right-of-way designation, purchase, or eminent domain, with an incentive offer up to 15 percent over the appraised or tax assessed value. Public comment is not stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
SW 268 Street from US-1 to SW 139 Avenue
Applicant:
Miami-Dade County Transportation and Public Works

IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET

Miami-Dade County Board of County Commissioners is considering a resolution to declare the acquisition of Parcel 1 a public necessity for the SW 268 Street Improvement Project. This project involves reconstructing and widening SW 268 Street from US-1 to SW 139 Avenue, including sidewalks, drainage, pavement markings, signalization, lighting, bicycle facilities, and Water and Sewer Department utility improvements. The estimated cost for design, construction, CEI, and right-of-way acquisition is $12,739,000, funded by the FY25-26 Adopted Budget and Multi-Year Capital Plan, Volume 2, Page 158, and Mobility Impact Fees. The resolution authorizes the County Mayor or designee and County Attorney to acquire the property through negotiation, donation, right-of-way designation, purchase, or eminent domain, with an incentive offer up to 15 percent over the appraised or tax assessed value. The Transportation Committee forwarded this item to the Board with a favorable recommendation on 6/9/2026. The Board is scheduled to consider this on 7/21/2026.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Transportation Committee; Pending BCC Assignment
Address:
SW 268 Street from US-1 to SW 139 Avenue
Applicant:
Miami-Dade County Transportation and Public Works

IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET

Miami-Dade County Board of County Commissioners is considering a resolution to declare the acquisition of Parcel 1 a public necessity for road widening, beautification, and right-of-way improvements to SW 268 Street, from US-1 to SW 139 Avenue. The project includes reconstruction, widening, sidewalks, drainage, lighting, bicycle facilities, and utility improvements. The Board will authorize the County Mayor or designee and County Attorney to acquire the property through negotiation, donation, designation, purchase, or eminent domain, with an option for an incentive offer up to 15% over appraised or tax-assessed value. The estimated project cost is $12,739,000. The Transportation Committee forwarded the item with a favorable recommendation.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation (Transportation Committee); Pending Board of County Commissioners approval
Address:
SW 268 Street from US-1 to SW 139 Avenue
Applicant:
Miami-Dade County Transportation and Public Works

IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET

Miami-Dade County is proceeding with improvements to SW 268 Street, spanning from US-1 to SW 139 Avenue. This project involves road widening, beautification, and right-of-way acquisition for Parcel 1. The scope includes reconstruction, widening, milling and resurfacing, new drainage, sidewalks, curbs and gutters, signalization, lighting, bicycle facilities, and Water and Sewer Department utility improvements. The estimated cost for design, construction, and acquisition is $12,739,000, funded by the FY25-26 Adopted Budget and Multi-Year Capital Plan for road widening and mobility impact fees. The Transportation and Public Works Department is overseeing the project. The Board of County Commissioners is set to consider declaring the acquisition of Parcel 1 a public necessity on July 21, 2026. The Transportation Committee previously forwarded this item with a favorable recommendation. Public comment is not stated in this document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Recommended for approval by Transportation Committee; pending Board of County Commissioners decision
Address:
SW 268 Street from US-1 to SW 139 Avenue
Applicant:
Miami-Dade County Transportation and Public Works

IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET

Miami-Dade County is proceeding with improvements to SW 268 Street, specifically the section between US-1 and SW 139 Avenue. This project involves road widening, beautification, and right-of-way improvements, including reconstruction, milling and resurfacing, new drainage, sidewalks, curbs, gutters, signalization, lighting, bicycle facilities, and utility work. The Board of County Commissioners is authorizing the acquisition of Parcel 1 for these improvements. The estimated cost for design, construction, and right-of-way acquisition is $12,739,000. The Transportation and Public Works Department is overseeing the project. The Transportation Committee forwarded this item to the Board with a favorable recommendation.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Approved (recommended by Transportation Committee, pending Board of County Commissioners)
Address:
SW 268 Street from US-1 to SW 139 Avenue
Applicant:
Miami-Dade County Transportation and Public Works

IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET

Miami-Dade County is proceeding with improvements to SW 268 Street, specifically the section between US-1 and SW 139 Avenue. This project involves road widening, beautification, and right-of-way improvements, including reconstruction, milling and resurfacing, new drainage, sidewalks, curbs and gutters, signalization, lighting, bicycle facilities, and utility work. The County is declaring the acquisition of Parcel 1 for these improvements as a public necessity. The County Mayor or designee is authorized to acquire Parcel 1 through negotiation, donation, right-of-way designation, purchase (at appraised or tax-assessed value, whichever is higher), or eminent domain. An incentive offer of up to 15 percent over the higher of appraised or tax-assessed value is also authorized to expedite acquisition. The estimated cost for design, construction, and right-of-way acquisition is $12,739,000, funded by the FY25-26 Adopted Budget and Multi-Year Capital Plan for Road Widening Countywide and Mobility Impact Fees. Annual maintenance costs are estimated at $5,764.99.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Approved (Resolution declaring acquisition a public necessity, authorizing acquisition actions)
Address:
SW 268 Street from US-1 to SW 139 Avenue
Applicant:
Miami-Dade County Transportation and Public Works

IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET

Miami-Dade County is proceeding with improvements to SW 268 Street, spanning from US-1 to SW 139 Avenue. This project involves road widening, beautification, and right-of-way acquisition for Parcel 1. The scope includes reconstruction, widening, milling and resurfacing, new drainage, sidewalks, curbs and gutters, signalization, lighting, bicycle facilities, and Water and Sewer Department utility improvements. The estimated cost for design, construction, and acquisition is $12,739,000, funded by the Countywide Road Widening program and Mobility Impact Fees. The Transportation and Public Works Department is overseeing the project. The Board of County Commissioners is set to consider declaring the acquisition of Parcel 1 a public necessity on July 21, 2026. A favorable recommendation was made by the Transportation Committee on June 9, 2026.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation (Transportation Cmte); Pending BCC Assignment (Legislative Item)
Address:
SW 268 Street from US-1 to SW 139 Avenue
Applicant:
Miami-Dade County Transportation and Public Works

Mira los negocios reales detrás de estos números

Obtén los registros reales, con direcciones y directivos, gratis por 7 días. Sin tarjeta de crédito.

Comienza tu prueba gratis