Skip to main content

Sé el Primero, Construye Relaciones Duraderas

Browse Miami-Dade County civic records

Every published record for Miami-Dade County, newest first. Filter by board, year, or industry to jump straight to the records you want, and page through to reach the full archive.

28,539 records

CONSTRUCTION MATERIALS TESTING SERVICES

Miami-Dade County Board of County Commissioners adopted a resolution approving a Professional Services Agreement (PSA) with Terracon Consultants, Inc. for construction materials testing services. This contract is part of a pool of architectural and engineering consultants supporting the Miami-Dade Aviation Department's capital improvement projects at Miami International Airport. The contract has a maximum amount of $41,353,125.00 for a five-year term with a one-year renewal option. Work will be assigned on a rotational basis among five firms in the pool. Terracon was the second-ranked firm selected for negotiation. The document details the procurement process, including the evaluation of nine proposals and the selection of seven compliant firms. No public comment or stakeholder sentiment is mentioned in the document.

Board:
Board of County Commissioners
Date:
2026-06-02
Type:
Resolution
Decision:
Adopted
Address:
Miami International Airport
Applicant:
Terracon Consultants, Inc.

CONSTRUCTION MATERIALS TESTING SERVICES

Miami-Dade County Board of County Commissioners adopted a resolution approving a Professional Services Agreement (PSA) with Terracon Consultants, Inc. for construction materials testing services. This contract is part of a pool of architectural and engineering consultants supporting the Miami-Dade Aviation Department's capital improvement projects at Miami International Airport. The contract has a maximum combined amount of $41,353,125.00 for a term of five years with one five-year renewal option. The services include construction material testing, asphalt and concrete testing, geotechnical exploration, soil and foundation testing, and roof testing. The work will be assigned via service orders on a rotational basis among five firms in the pool. No minimum work is guaranteed to any single firm.

Board:
Board of County Commissioners
Date:
2026-06-02
Type:
Resolution
Decision:
Adopted
Address:
Miami International Airport
Applicant:
Terracon Consultants, Inc.

CONSTRUCTION MATERIALS TESTING SERVICES

Miami-Dade County Board of County Commissioners adopted a resolution approving a Professional Services Agreement (PSA) with Terracon Consultants, Inc. as part of a pool of consultants to provide construction materials testing services for the Miami-Dade Aviation Department at Miami International Airport. The contract, number E24AV03B, has a combined maximum amount of $41,353,125.00 for a five-year term with a potential five-year renewal. The services include construction material testing, asphalt and concrete testing, geotechnical exploration, soil and foundation testing, and roof testing. The project is part of the airport's ongoing $12 billion modernization effort. No public comment was recorded in this document.

Board:
Board of County Commissioners
Date:
2026-06-02
Type:
Resolution
Decision:
Adopted
Address:
Miami International Airport
Applicant:
Terracon Consultants, Inc.

CONSTRUCTION MATERIALS TESTING SERVICES

Miami-Dade County Board of County Commissioners adopted a resolution approving a Professional Services Agreement (PSA) with Terracon Consultants, Inc. for construction materials testing services. This contract is part of a pool of architectural and engineering consultants for the Miami-Dade Aviation Department at Miami International Airport. The contract, numbered E24AV03B, has a maximum combined amount of $41,353,125.00 for a five-year term with a potential five-year renewal. The services will support various capital improvement projects at the airport, including terminal, concourse, aircraft ramp, runway, and parking structure enhancements. Terracon was the second-highest ranked firm evaluated by the Competitive Selection Committee. The agreement was adopted on June 2, 2026.

Board:
Board of County Commissioners
Date:
2026-06-02
Type:
Resolution
Decision:
Adopted
Address:
Miami International Airport
Applicant:
Terracon Consultants, Inc.

CONTRACT AWARD TO LEGO CONSTRUCTION

Miami-Dade County approved a contract award to LEGO Construction Co. for the Miami International Airport (MIA) Terminal Wide Re-roofing and Lightning System Upgrades Project No. AA078A. The project involves replacing approximately 410,000 square feet of roofing in the North, Central, and South Terminals, upgrading lightning protection, and installing a Solar Photovoltaic (PV) system. The contract amount is not to exceed $125,703,562.22, with a contract term of 1,460 consecutive calendar days. The existing roofing systems, installed approximately 16 years ago, have exceeded their useful life and are experiencing leaks. The project aims to enhance infrastructure, support growing passenger demand, and strengthen MIA's role as a leading U.S. airport. Public comment is not stated in the document.

Board:
Board of County Commissioners
Date:
2026-06-02
Type:
Resolution
Decision:
Adopted
Address:
Miami International Airport
Applicant:
LEGO Construction Co.

CONTRACT AWARD TO LEGO CONSTRUCTION

Miami-Dade County Board of County Commissioners adopted a resolution approving a contract award to LEGO Construction Co. for the Miami International Airport (MIA) Terminal Wide Re-roofing and Lightning System Upgrades Project No. AA078A. The project involves replacing approximately 410,000 square feet of roofing across the North, Central, and South Terminals, upgrading the lightning protection system, and installing a Solar Photovoltaic (PV) system. The contract amount is not to exceed $125,703,562.22, with a contract term of 1,460 consecutive calendar days. Commissioner Milian Orbis inquired about solar panel integration, and Mr. Cutie confirmed their inclusion and explained the phased approach over four years, noting potential cost savings and reduced electricity bills. The project also aims to make MIA the highest power-generating airport in the state. LEGO Construction Co. has a history of 20 years in business and an average evaluation rating of 3.7 out of 4.0 points in the SBD's CIIS database.

Board:
Board of County Commissioners
Date:
2026-06-02
Type:
Resolution
Decision:
Adopted
Address:
Miami International Airport
Applicant:
LEGO Construction Co.

CONTRACT AWARD TO LEGO CONSTRUCTION

Miami-Dade County Board of County Commissioners adopted a resolution approving a contract award to LEGO Construction Co. for the Miami International Airport (MIA) Terminal Wide Re-roofing and Lightning System Upgrades Project No. AA078A. The project involves replacing approximately 410,000 square feet of roofing across the North, Central, and South Terminals, upgrading the lightning protection system, and installing a Solar Photovoltaic (PV) system. The contract amount is not to exceed $125,703,562.22, with a total contract period of 1,460 consecutive calendar days. Commissioner Milian Orbis inquired about solar panels, and Mr. Cutie confirmed their inclusion and explained the phased installation and potential expansion to parking garages, aiming to make MIA the highest power-generating airport in the state.

Board:
Board of County Commissioners
Date:
2026-06-02
Type:
Resolution
Decision:
Adopted
Address:
Miami International Airport
Applicant:
LEGO Construction Co.

CONTRACT AWARD TO LEGO CONSTRUCTION

Miami-Dade County Board of County Commissioners adopted a resolution approving a contract award to LEGO Construction Co. for the Miami International Airport (MIA) Terminal Wide Re-roofing and Lightning System Upgrades Project No. AA078A. The project involves replacing approximately 410,000 square feet of roofing systems in the North, Central, and South Terminals, upgrading lightning protection, and installing a Solar Photovoltaic (PV) system. The total contract amount is not to exceed $125,703,562.22, with a contract period of 1,460 consecutive calendar days. The existing roofing systems, installed approximately 16 years ago, have exceeded their useful life and are experiencing leaks. The project aims to enhance infrastructure reliability, support growing passenger demand, and strengthen MIA's role as a leading U.S. airport. Public comment is not stated in this document.

Board:
Board of County Commissioners
Date:
2026-06-02
Type:
Resolution
Decision:
Adopted
Address:
Miami International Airport (MIA)
Applicant:
LEGO Construction Co.

CONTRACT AWARD TO LEGO CONSTRUCTION

Miami-Dade County Board of County Commissioners adopted a resolution approving a contract award to LEGO Construction Co. for the Miami International Airport (MIA) Terminal Wide Re-roofing and Lightning System Upgrades Project (No. AA078A). The project involves replacing approximately 410,000 square feet of roofing across the North, Central, and South Terminals, upgrading the lightning protection system, and installing a Solar Photovoltaic (PV) system. The total contract amount is not to exceed $125,703,562.22, with a contract period of 1,460 consecutive calendar days. Commissioner Milian Orbis inquired about solar panels, and Mr. Cutie confirmed their inclusion, noting the project's phased approach over four years and potential expansion to parking garages. The project aims to enhance infrastructure, support passenger demand, and improve MIA's role as a leading U.S. airport. LEGO Construction Co. was determined to be fully qualified, with their base bid being within an acceptable range of the engineer's estimate. The contract includes a 10 percent contingency, an Inspector's General Fee, and dedicated allowance accounts for various repairs and temporary emergency repairs.

Board:
Board of County Commissioners
Date:
2026-06-02
Type:
Resolution
Decision:
Adopted
Address:
Miami International Airport (MIA)
Applicant:
LEGO Construction Co.

CONTRACT AWARD TO LEGO CONSTRUCTION

Miami International Airport (MIA) Terminal Wide Re-roofing and Lightning System Upgrades Project No. AA078A has been approved. The project involves replacing approximately 410,000 square feet of roofing across North, Central, and South Terminals, upgrading lightning protection, and installing a Solar Photovoltaic (PV) system. The contract was awarded to LEGO Construction Co. for an amount not to exceed $125,703,562.22. The project duration is 1,460 calendar days. Commissioner Milian Orbis inquired about solar panels, and Mr. Cutie confirmed their inclusion, noting the project's goal to save money and reduce electricity bills. He also mentioned potential expansion of the solar program to parking garages.

Board:
Board of County Commissioners
Date:
2026-06-02
Type:
Resolution
Decision:
Adopted
Address:
Miami International Airport (MIA)
Applicant:
LEGO Construction Co.

CONTRACT AWARD TO LEGO CONSTRUCTION

Miami-Dade County approved a contract for the Miami International Airport (MIA) Terminal Wide Re-roofing and Lightning System Upgrades Project No. AA078A. The project involves replacing approximately 410,000 square feet of roofing across North, Central, and South Terminals, upgrading lightning protection, and installing a Solar Photovoltaic (PV) system. The contract was awarded to LEGO Construction Co. for an amount not to exceed $125,703,562.22. The project duration is 1,460 calendar days. Commissioner Milian Orbis inquired about solar panels, and Mr. Cutie confirmed their inclusion, noting the project's phased approach over four years and potential for significant energy savings and airport power generation.

Board:
Board of County Commissioners
Date:
2026-06-02
Type:
Resolution
Decision:
Adopted
Address:
Miami International Airport
Applicant:
LEGO Construction Co.

CONTRACT AWARD TO LEGO CONSTRUCTION

Miami-Dade County approved a contract for the Miami International Airport (MIA) Terminal Wide Re-roofing and Lightning System Upgrades Project No. AA078A. The project involves replacing approximately 410,000 square feet of roofing across North, Central, and South Terminals, upgrading the lightning protection system, and installing a Solar Photovoltaic (PV) system. The contract was awarded to LEGO Construction Co. for an amount not to exceed $125,703,562.22. The project duration is 1,460 consecutive calendar days. Commissioner Milian Orbis inquired about solar panels, and Mr. Cutie confirmed their inclusion, noting the project's phased approach over four years and potential for significant energy savings. The project aims to address leaks and deficiencies in the existing roofing systems, which are approximately 16 years old.

Board:
Board of County Commissioners
Date:
2026-06-02
Type:
Resolution
Decision:
Adopted
Address:
Miami International Airport (MIA)
Applicant:
LEGO Construction Co.

CONTRACT AWARD TO LEGO CONSTRUCTION

Miami-Dade County approved a contract for the Miami International Airport (MIA) Terminal Wide Re-roofing and Lightning System Upgrades Project No. AA078A. The project involves replacing approximately 410,000 square feet of roofing across North, Central, and South Terminals, upgrading lightning protection, and installing a Solar Photovoltaic (PV) system. The contract was awarded to LEGO Construction Co. for an amount not to exceed $125,703,562.22. The project duration is 1,460 consecutive calendar days. Commissioner Milian Orbis inquired about solar panels, and Mr. Cutie confirmed their inclusion and explained the phased installation over four years, aiming for cost savings and reduced electricity bills. The project also aims to make MIA the highest power-generating airport in the state.

Board:
Board of County Commissioners
Date:
2026-06-02
Type:
Resolution
Decision:
Adopted
Address:
Miami International Airport (MIA)
Applicant:
LEGO Construction Co.

CONTRACT AWARD TO LEGO CONSTRUCTION

Miami-Dade County approved a contract for the Miami International Airport (MIA) Terminal Wide Re-roofing and Lightning System Upgrades Project No. AA078A. The project involves replacing approximately 410,000 square feet of roofing across North, Central, and South Terminals, upgrading lightning protection, and installing a Solar Photovoltaic (PV) system. The contract was awarded to LEGO Construction Co. for an amount not to exceed $125,703,562.22. The project duration is 1,460 calendar days. Commissioner Milian Orbis inquired about solar panel integration, and Mr. Cutie confirmed their inclusion, noting the project's phased approach over four years and potential for MIA to become the highest power-generating airport in the state. The project aims to address leaks and deficiencies in the existing roofing systems, which are approximately 16 years old.

Board:
Board of County Commissioners
Date:
2026-06-02
Type:
Resolution
Decision:
Adopted
Address:
Miami International Airport (MIA)
Applicant:
LEGO Construction Co.

CONTRACT AWARD TO LEGO CONSTRUCTION

Miami-Dade County approved a contract for the Miami International Airport (MIA) Terminal Wide Re-roofing and Lightning System Upgrades Project No. AA078A with LEGO Construction Co. The project involves replacing approximately 410,000 square feet of roofing across North, Central, and South Terminals, upgrading lightning protection, and installing a Solar Photovoltaic (PV) system. The contract amount is not to exceed $125,703,562.22, with a contract term of 1,460 calendar days. Commissioner Milian Orbis inquired about solar panels, and Mr. Cutie confirmed their inclusion, noting the project's phased approach over four years and potential for MIA to become the highest power-generating airport in the state. The project aims to address leaks and deficiencies in the existing roofing systems, which are approximately 16 years old.

Board:
Board of County Commissioners
Date:
2026-06-02
Type:
Resolution
Decision:
Adopted
Address:
Miami International Airport (MIA)
Applicant:
LEGO Construction Co.

CONTRACT AWARD TO LEGO CONSTRUCTION

Miami-Dade County approved a contract for the Miami International Airport (MIA) Terminal Wide Re-roofing and Lightning System Upgrades Project No. AA078A. The project involves replacing approximately 410,000 square feet of roofing across North, Central, and South Terminals, upgrading lightning protection, and installing a Solar Photovoltaic (PV) system. The contract was awarded to LEGO Construction Co. for an amount not to exceed $125,703,562.22. The project duration is 1,460 calendar days. Commissioner Milian Orbis inquired about solar panels, and Mr. Cutie confirmed their inclusion and explained the phased approach over four years, noting potential cost savings and reduced electric bills. The project also aims to make MIA the highest power-generating airport in the state.

Board:
Board of County Commissioners
Date:
2026-06-02
Type:
Resolution
Decision:
Adopted
Address:
Miami International Airport
Applicant:
LEGO Construction Co.

CONTRACT AWARD TO LEGO CONSTRUCTION

Miami-Dade County Board of County Commissioners adopted a resolution approving a contract award to LEGO Construction Co. for the Miami International Airport (MIA) Terminal Wide Re-roofing and Lightning System Upgrades Project No. AA078A. The project involves replacing approximately 410,000 square feet of roofing across the North, Central, and South Terminals, upgrading the lightning protection system, and installing a Solar Photovoltaic (PV) system. The contract amount is not to exceed $125,703,562.22, with a total contract period of 1,460 consecutive calendar days. Commissioner Milian Orbis inquired about solar panels, and Mr. Cutie confirmed their inclusion and explained the phased approach over four years, noting potential cost savings and reduced electric bills. The project also aims to expand solar panel programs to parking garages. The contract was approved by the Aviation and Seaport Committee with a favorable recommendation.

Board:
Board of County Commissioners
Date:
2026-06-02
Type:
Resolution
Decision:
Adopted
Address:
Miami International Airport
Applicant:
LEGO Construction Co.

CONTRACT AWARD TO LEGO CONSTRUCTION

Miami-Dade County approved a contract for the Miami International Airport (MIA) Terminal Wide Re-roofing and Lightning System Upgrades Project No. AA078A. The project involves replacing approximately 410,000 square feet of roofing across North, Central, and South Terminals, upgrading lightning protection, and installing a Solar Photovoltaic (PV) system. The contract was awarded to LEGO Construction Co. for an amount not to exceed $125,703,562.22. The project duration is 1,460 calendar days. Commissioner Milian Orbis inquired about solar panels, and Mr. Cutie confirmed their inclusion and explained the phased approach over four years, noting potential cost savings and reduced electricity bills. The project aims to enhance infrastructure reliability and sustainability.

Board:
Board of County Commissioners
Date:
2026-06-02
Type:
Resolution
Decision:
Adopted
Address:
Miami International Airport (MIA)
Applicant:
LEGO Construction Co.

CONTRACT AWARD TO LEGO CONSTRUCTION

Miami-Dade County approved a contract with LEGO Construction Co. for the Miami International Airport (MIA) Terminal Wide Re-roofing and Lightning System Upgrades Project No. AA078A. The project involves replacing approximately 410,000 square feet of roofing in the North, Central, and South Terminals, upgrading lightning protection, and installing a Solar Photovoltaic (PV) system. The contract amount is not to exceed $125,703,562.22, with a contract term of 1,460 consecutive calendar days. The existing roofing systems, installed approximately 16 years ago, have exceeded their useful life and are experiencing leaks. The project aims to enhance infrastructure reliability, support growing passenger demand, and strengthen MIA's role as a leading U.S. airport. The contract was adopted by the Board of County Commissioners on June 2, 2026. No public comment or stakeholder sentiment was stated in the document.

Board:
Board of County Commissioners
Date:
2026-06-02
Type:
Resolution
Decision:
Adopted
Address:
Miami International Airport
Applicant:
LEGO Construction Co.

CONTRACT AWARD TO LEGO CONSTRUCTION

Miami-Dade County Board of County Commissioners adopted a resolution approving a contract award to LEGO Construction Co. for the Miami International Airport (MIA) Terminal Wide Re-roofing and Lightning System Upgrades Project (No. AA078A). The project involves replacing approximately 410,000 square feet of roofing across the North, Central, and South Terminals, upgrading the lightning protection system, and installing a Solar Photovoltaic (PV) system. The contract amount is not to exceed $125,703,562.22, with a total contract period of 1,460 consecutive calendar days. Commissioner Milian Orbis inquired about solar panels, and Mr. Cutie confirmed their inclusion, explaining the phased approach and potential for MIA to become the highest power-generating airport in the state. The project aims to address leaks and deficiencies in the existing roofing systems, which have exceeded their useful life.

Board:
Board of County Commissioners
Date:
2026-06-02
Type:
Resolution
Decision:
Adopted
Address:
Miami International Airport
Applicant:
LEGO Construction Co.

Mira los negocios reales detrás de estos números

Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.

Crea tu cuenta