Browse Miami-Dade County civic records
Every published record for Miami-Dade County, newest first. Filter by board, year, or industry to jump straight to the records you want, and page through to reach the full archive.
15,165 records
CONCOURSE K CONCESSION PROGRAM AT MIA
Miami-Dade Aviation Department (MDAD) is awarding a competitive revenue-generating contract, Contract No. EVN0028376, for the Concourse K Concession Program at Miami International Airport to OTG MIA Venture, LLC. The contract involves the development and management of 17 retail and food and beverage concession spaces, totaling approximately 19,073 square feet, within the upcoming Concourse K. The projected revenue for MDAD is $62,200,000 over an initial 11-year term, with one one-year option to renew. The concessionaire will be responsible for financing, design, leasing, tenant coordination, construction, and property management of these spaces. The project is part of MIA's Modernization in Action initiative to enhance passenger experience and revenue streams. The award is pending Board of County Commissioners (BCC) approval, with an agenda date of September 1, 2026. The Aviation and Seaport Committee forwarded the resolution to the BCC with a favorable recommendation on July 13, 2026. The RFP was issued on August 5, 2025, and four proposals were received, with OTG MIA Venture, LLC being the highest-ranked responsive proposer. The Living Wage Ordinance applies to this contract.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Approved (Recommendation for Award)
- Address:
- Miami International Airport, Concourse K
- Applicant:
- OTG MIA Venture, LLC
CONCOURSE K CONCESSION PROGRAM AT MIA
This legislative item concerns the approval of a competitive revenue-generating contract for the Concourse K Concession Program at Miami International Airport. The contract, number EVN0028376, is awarded to OTG MIA Venture, LLC. The project involves the development and management of 17 concession spaces (11 food and beverage, 6 retail) totaling approximately 19,073 square feet within the upcoming Concourse K. The projected revenue to the Miami-Dade Aviation Department is $62,200,000 over an initial 11-year term, with one one-year option to renew. The contract requires the concessionaire to provide financing, design, leasing, tenant coordination, construction, and property management. The Board of County Commissioners is authorizing the award and the County Mayor or designee to execute the agreement. The contract is expected to generate significant non-aeronautical revenue and enhance the passenger experience. The RFP was issued August 5, 2025, with four proposals received by November 17, 2025. Three proposals were deemed non-responsive due to failure to submit a revenue proposal. Negotiations concluded May 5, 2026. The Concourse K is expected to be available by 2030. Public comment is not stated in this document.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Approved (Recommended for Award)
- Address:
- Miami International Airport, Concourse K
- Applicant:
- OTG MIA Venture, LLC
CONCOURSE K CONCESSION PROGRAM AT MIA
Miami-Dade County Board of County Commissioners approved the award of a competitive revenue-generating contract, Contract No. EVN0028376, for the Concourse K Concession Program at Miami International Airport to OTG MIA Venture, LLC. The contract is for the development and management of 17 retail and food and beverage concession spaces, totaling approximately 19,073 square feet, within the upcoming Concourse K. The projected revenue to the Miami-Dade Aviation Department over the initial 11-year term (including two years for construction and nine for operations) and one one-year option to renew is $62,200,000. The Concessionaire will be responsible for financing, design, leasing, tenant coordination, construction, and property management of these spaces. The award was recommended by staff and approved by the Board. The process involved a Request for Proposals issued in August 2025, with four proposals received by November 2025. After legal review, three proposals were deemed non-responsive due to failure to submit a revenue proposal. Negotiations with the responsive vendor concluded in May 2026. The Living Wage Ordinance applies to this contract.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Approved
- Address:
- Miami International Airport, Concourse K
- Applicant:
- OTG MIA Venture, LLC
CONCOURSE K CONCESSION PROGRAM AT MIA
Miami-Dade County Board of County Commissioners approved the award of a competitive revenue-generating contract (Contract No. EVN0028376) for the Concourse K Concession Program at Miami International Airport to OTG MIA Venture, LLC. The contract involves the development and management of 17 retail and food and beverage concession spaces, totaling approximately 19,073 square feet, within the upcoming Concourse K. The projected revenue for Miami-Dade Aviation Department is $62,200,000.00 over an initial 11-year term, with one one-year option to renew. The agreement includes financing, design, leasing, tenant coordination, construction, and property management of the concession locations. The project is part of MIA's modernization initiative to enhance passenger experience and generate non-aeronautical revenue. The award was recommended by staff and approved by the Board.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Approved
- Address:
- Miami International Airport, Concourse K
- Applicant:
- OTG MIA Venture, LLC
CONCOURSE K CONCESSION PROGRAM AT MIA
Miami-Dade County Board of County Commissioners approved the award of a competitive revenue-generating contract, Contract No. EVN0028376, for the Concourse K Concession Program at Miami International Airport to OTG MIA Venture, LLC. The contract is for the development and management of 17 retail and food and beverage concession spaces totaling approximately 19,073 square feet. The projected revenue to the Miami-Dade Aviation Department is $62,200,000.00 over an initial 11-year term, with one additional one-year option to renew. The term includes two years for construction and nine years for operations. The Concessionaire is responsible for financing, design, leasing, tenant coordination, construction, and property management of these spaces. The contract was recommended for approval by the Aviation and Seaport Committee and subsequently by the Board of County Commissioners. The RFP was issued on August 5, 2025, and four proposals were received, with three deemed non-responsive due to missing revenue proposals. Negotiations concluded on May 5, 2026. The Concourse K is expected to be available by 2030. The Living Wage Ordinance applies.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Approved
- Address:
- Miami International Airport, Concourse K
- Applicant:
- OTG MIA Venture, LLC
CONCOURSE K CONCESSION PROGRAM AT MIA
Miami-Dade County Board of County Commissioners is approving the award of a competitive revenue-generating contract, Contract No. EVN0028376, for the Concourse K Concession Program at Miami International Airport (MIA) to OTG MIA Venture, LLC. The contract involves the development and management of 17 retail and food and beverage concession spaces totaling approximately 19,073 square feet in the upcoming Concourse K. The projected revenue to Miami-Dade Aviation Department (MDAD) is $62,200,000.00 over an initial 11-year term, which includes two years for construction and nine years for operations, with one additional one-year option to renew. The Concessionaire will be responsible for financing, design, leasing, tenant coordination, construction, and property management of these spaces. The award was recommended by staff and forwarded with a favorable recommendation by the Aviation and Seaport Committee. The process involved a Request for Proposals issued on August 5, 2025, with four proposals received by November 17, 2025. Three proposals were deemed non-responsive due to failure to submit a revenue proposal. Negotiations with the selected vendor concluded on May 5, 2026. The Concourse K is expected to be available by 2030. Public comment or stakeholder sentiment is not stated in this document.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Approved (Resolution)
- Address:
- Miami International Airport, Concourse K
- Applicant:
- OTG MIA Venture, LLC
CONCOURSE K CONCESSION PROGRAM AT MIA
Miami-Dade County Board of County Commissioners is approving the award of a competitive revenue-generating contract, Contract No. EVN0028376, for the Concourse K Concession Program at Miami International Airport to OTG MIA Venture, LLC. The contract is for the development and management of 17 retail and food and beverage concession spaces, totaling approximately 19,073 square feet. The projected revenue to Miami-Dade Aviation Department is $62,200,000.00 over an initial 11-year term, with one, one-year option to renew. The term includes two years for construction and nine years for operations. The Concessionaire will be responsible for financing, design, leasing, tenant coordination, construction, and property management of the concession locations. The contract is expected to advance MIA's modernization efforts and enhance passenger experience. The award was made after a competitive RFP process where three other proposals were deemed non-responsive. The Living Wage Ordinance applies to this contract.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Approved (Resolution)
- Address:
- Miami International Airport, Concourse K
- Applicant:
- OTG MIA Venture, LLC
CONCOURSE K CONCESSION PROGRAM AT MIA
Miami-Dade County Board of County Commissioners is considering the award of a competitive revenue-generating contract, Contract No. EVN0028376, for the Concourse K Concession Program at Miami International Airport (MIA). The contract is proposed to be awarded to OTG MIA Venture, LLC for an initial 11-year term with one one-year option to renew. This program involves the development and management of 17 concession spaces (11 food and beverage, 6 retail) totaling approximately 19,073 square feet within the upcoming Concourse K. The projected revenue to the Miami-Dade Aviation Department (MDAD) is $62,200,000.00. The Concessionaire will be responsible for financing, design, leasing, tenant coordination, construction, and property management of these spaces. The project is part of MIA's modernization efforts to enhance passenger experience and generate non-aeronautical revenue. The contract was introduced on June 24, 2026, and is scheduled for an Agenda Date of September 1, 2026. The Aviation and Seaport Committee forwarded the resolution to the Board of County Commissioners (BCC) with a favorable recommendation on July 13, 2026. The Living Wage Ordinance applies to this contract.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Recommended for award (Pending BCC Assignment)
- Address:
- Miami International Airport, Concourse K
- Applicant:
- OTG MIA Venture, LLC
CONCOURSE K CONCESSION PROGRAM AT MIA
Miami-Dade County Commissioners approved the award of Contract No. EVN0028376 for the Concourse K Concession Program at Miami International Airport to OTG MIA Venture, LLC. This competitive revenue-generating contract is for the development and management of 17 specialty retail and food and beverage concession spaces, totaling approximately 19,073 square feet, within the upcoming Concourse K. The projected revenue to the Miami-Dade Aviation Department (MDAD) is $62,200,000.00 over an initial 11-year term, which includes two years for construction and nine for operations, with one additional one-year option to renew. The Concessionaire will be responsible for financing, design, leasing, tenant coordination, construction, and property management of these spaces. The contract was recommended for approval by the Aviation and Seaport Committee and subsequently by the Board of County Commissioners. The RFP was issued August 5, 2025, with four proposals received by November 17, 2025. Three proposals were deemed non-responsive due to missing revenue proposals. Negotiations with the selected vendor concluded on May 5, 2026. The Concourse K is expected to be available by 2030. The Living Wage Ordinance applies to this contract.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Approved
- Address:
- Miami International Airport, Concourse K
- Applicant:
- OTG MIA Venture, LLC
CONCOURSE K CONCESSION PROGRAM AT MIA
Miami-Dade County Board of County Commissioners is approving the award of a competitive revenue-generating contract, Contract No. EVN0028376, for the Concourse K Concession Program at Miami International Airport (MIA) to OTG MIA Venture, LLC. The contract is for the development and management of 17 retail and food and beverage concession spaces, totaling approximately 19,073 square feet. The projected revenue to the Miami-Dade Aviation Department (MDAD) is $62,200,000.00 over an initial 11-year term, which includes two years for construction and nine for operations, with one additional one-year option to renew. The Concessionaire will be responsible for financing, design, leasing, tenant coordination, construction, and property management of these spaces. The contract is expected to advance MIA's modernization efforts and enhance passenger experience. The award was made after a competitive RFP process where three other proposals were deemed non-responsive. The Living Wage Ordinance applies to this contract.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Approved (Resolution)
- Address:
- Miami International Airport, Concourse K
- Applicant:
- OTG MIA Venture, LLC
CONCOURSE K CONCESSION PROGRAM AT MIA
Miami-Dade County Board of County Commissioners approved the award of a competitive revenue-generating contract, Contract No. EVN0028376, for the Concourse K Concession Program at Miami International Airport to OTG MIA Venture, LLC. The contract is for the development and management of 17 retail and food and beverage concession spaces, totaling approximately 19,073 square feet, within the upcoming Concourse K. The projected revenue to the Miami-Dade Aviation Department is $62,200,000.00 over an initial 11-year term, with one one-year option to renew. The agreement includes provisions for financing, design, leasing, tenant coordination, construction, and property management of the concession locations. The Concessionaire will be responsible for 11 food and beverage concessions and 6 retail concessions. The contract was recommended for approval by the Aviation and Seaport Committee and subsequently by the Board of County Commissioners. The process involved a Request for Proposals issued on August 5, 2025, with four proposals received by November 17, 2025. Three proposals were deemed non-responsive due to failure to submit a revenue proposal. Negotiations with the selected vendor concluded on May 5, 2026. The Concourse K is expected to be available by 2030. The Living Wage Ordinance applies to this contract.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Approved
- Address:
- Miami International Airport, Concourse K
- Applicant:
- OTG MIA Venture, LLC
CONCOURSE K CONCESSION PROGRAM AT MIA
Miami-Dade County Board of County Commissioners is approving the award of a competitive revenue-generating contract, Contract No. EVN0028376, for the Concourse K Concession Program at Miami International Airport to OTG MIA Venture, LLC. The contract is for the development and management of 17 retail and food and beverage concession spaces, totaling approximately 19,073 square feet. The projected revenue to Miami-Dade Aviation Department is $62,200,000.00 over an initial 11-year term, with one, one-year option to renew. The contract includes provisions for financing, design, leasing, tenant coordination, construction, and property management of the concession locations. The Concessionaire is expected to develop these spaces, which are anticipated to be available by 2030. The award is for a revenue-generating lease and concession agreement.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Approved (Resolution)
- Address:
- Miami International Airport, Concourse K
- Applicant:
- OTG MIA Venture, LLC
CONCOURSE K CONCESSION PROGRAM AT MIA
Miami-Dade County Board of County Commissioners is considering the award of a competitive revenue-generating contract (Contract No. EVN0028376) for the Concourse K Concession Program at Miami International Airport to OTG MIA Venture, LLC. The contract is for the development and management of 17 retail and food and beverage concession spaces, totaling approximately 19,073 square feet, within the upcoming Concourse K. The projected revenue for Miami-Dade Aviation Department is $62,200,000.00 over an initial 11-year term with one one-year option to renew. The Concessionaire will be responsible for financing, design, leasing, tenant coordination, construction, and property management of these spaces. The project is part of MIA's Modernization in Action initiative to enhance passenger experience and generate non-aeronautical revenue. The contract is expected to be effective upon Board approval, with concessions available by 2030. The Aviation and Seaport Committee forwarded the resolution to the Board with a favorable recommendation.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Pending BCC Assignment (Recommended for Award by Aviation and Seaport Committee)
- Address:
- Miami International Airport, Concourse K
- Applicant:
- OTG MIA Venture, LLC
CONCOURSE K CONCESSION PROGRAM AT MIA
Miami-Dade County Board of County Commissioners approved the award of a competitive revenue-generating contract, Contract No. EVN0028376, for the Concourse K Concession Program at Miami International Airport to OTG MIA Venture, LLC. The contract is for the development and management of 17 retail and food and beverage concession spaces totaling approximately 19,073 square feet. The projected revenue to the Miami-Dade Aviation Department is $62,200,000.00 over an initial 11-year term, which includes two years for construction and nine years for operations, with one additional one-year option to renew. The Concessionaire will be responsible for financing, design, leasing, tenant coordination, construction, and property management of these spaces. The contract was recommended for approval by the Aviation and Seaport Committee and subsequently by the Board of County Commissioners. The RFP was issued on August 5, 2025, and four proposals were received, with three deemed non-responsive due to missing revenue proposals. Negotiations concluded on May 5, 2026. The Concourse K is expected to be available by 2030. The Living Wage Ordinance applies to this contract.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Approved
- Address:
- Miami International Airport, Concourse K
- Applicant:
- OTG MIA Venture, LLC
CONCOURSE K CONCESSION PROGRAM AT MIA
Miami-Dade County Board of County Commissioners is considering the award of a competitive revenue-generating contract, Contract No. EVN0028376, for the Concourse K Concession Program at Miami International Airport to OTG MIA Venture, LLC. The contract is for the development and management of 17 retail and food and beverage concession spaces, totaling approximately 19,073 square feet. The projected revenue for Miami-Dade Aviation Department is $62,200,000.00 over an initial 11-year term, with one one-year option to renew. The contract includes financing, design, leasing, tenant coordination, construction, and property management of the concession locations. The Concourse K is expected to be available by 2030. The Living Wage Ordinance applies. The item is currently in committee.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- In Committee
- Address:
- Miami International Airport, Concourse K
- Applicant:
- OTG MIA Venture, LLC
CONCOURSE K CONCESSION PROGRAM AT MIA
Miami-Dade County Board of County Commissioners is approving the award of Contract No. EVN0028376 for the Concourse K Concession Program at Miami International Airport to OTG MIA Venture, LLC. This revenue-generating contract is projected to yield $62,200,000.00 for the Miami-Dade Aviation Department over an initial 11-year term with one one-year renewal option. The scope includes the development and management of 17 concession spaces (11 food and beverage, 6 retail) totaling approximately 19,073 square feet within the new Concourse K, expected to be available by 2030. The contract requires the concessionaire to provide financing, design, leasing, tenant coordination, construction, and property management. The Aviation and Seaport Committee forwarded the item to the Board with a favorable recommendation on July 13, 2026. The Board of County Commissioners is scheduled to consider this item on September 1, 2026. Public comment is not stated in this document.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Recommended for approval by Aviation and Seaport Committee; Pending Board of County Commissioners decision
- Address:
- Miami International Airport, Concourse K
- Applicant:
- OTG MIA Venture, LLC
CONCOURSE K CONCESSION PROGRAM AT MIA
Miami-Dade County Board of County Commissioners is approving the award of Contract No. EVN0028376 for the Concourse K Concession Program at Miami International Airport to OTG MIA Venture, LLC. This revenue-generating contract is projected to generate $62,200,000.00 for the Miami-Dade Aviation Department over an initial 11-year term with one one-year option to renew. The contract involves the development and management of 17 concession spaces (11 food and beverage, 6 retail) totaling approximately 19,073 square feet within the upcoming Concourse K, expected to be available by 2030. The Concessionaire will be responsible for financing, design, leasing, tenant coordination, construction, and property management. The Aviation and Seaport Committee forwarded this item to the Board with a favorable recommendation on July 13, 2026. The Board of County Commissioners is scheduled to consider this item on September 1, 2026. The Living Wage Ordinance applies to this contract.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Approved (Recommended for Award)
- Address:
- Miami International Airport, Concourse K
- Applicant:
- OTG MIA Venture, LLC
CONCOURSE K CONCESSION PROGRAM AT MIA
Miami-Dade County Board of County Commissioners is approving the award of a competitive revenue-generating contract, Contract No. EVN0028376, for the Concourse K Concession Program at Miami International Airport (MIA) to OTG MIA Venture, LLC. The contract is for the development and management of 17 retail and food and beverage concession spaces totaling approximately 19,073 square feet in the upcoming Concourse K. The projected revenue to Miami-Dade Aviation Department (MDAD) is $62,200,000.00 over an initial 11-year term (two years for construction, nine for operations) with one, one-year option to renew. The Concessionaire will be responsible for financing, design, leasing, tenant coordination, construction, and property management of these spaces. The RFP was issued August 5, 2025, with four proposals received by November 17, 2025. Three proposals were deemed non-responsive due to failure to submit a revenue proposal. The recommended vendor, OTG MIA Venture, LLC, is non-local. The Living Wage Ordinance applies. Public comment is not stated in the document.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Approved (Resolution)
- Address:
- Miami International Airport, Concourse K
- Applicant:
- OTG MIA Venture, LLC
CONTRACT AWARD TO CHEROKEE ENTERPRISES, INC
Miami-Dade County Board of County Commissioners is considering a resolution to approve a contract award to Cherokee Enterprises, Inc. for the Miami International Airport (MIA) Fuel Storage Facility Expansion - Phase 1. The project, identified as Contract No. W019A, aims to increase fuel reserves and improve operational efficiency by adding one 4-million-gallon fuel storage tank. The total contract amount is not to exceed $45,856,233.51, with a contract period of 730 consecutive calendar days. The Aviation and Seaport Committee forwarded this item to the Board with a favorable recommendation. The project involves construction of a new above-ground jet fuel storage tank, piping, filtration systems, and associated infrastructure, adhering to API 650 standards and incorporating sustainable building practices and sea level rise considerations. Funding sources include Future Financing, FAA, and FDOT Funds. Cherokee Enterprises, Inc. was the lowest bidder and has a satisfactory performance record with Miami-Dade County.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation by Aviation and Seaport Committee; pending Board of County Commissioners approval
- Address:
- Miami International Airport
- Applicant:
- Cherokee Enterprises, Inc.
CONTRACT AWARD TO CHEROKEE ENTERPRISES, INC
Miami-Dade County is approving a contract award to Cherokee Enterprises, Inc. for the Miami International Airport (MIA) Fuel Storage Facility Expansion - Phase 1. The project involves constructing a new 4-million-gallon jet fuel storage tank and associated infrastructure to increase MIA's fuel reserves. The total contract amount is $45,856,233.51, with a contract period of 730 consecutive calendar days. The project is subject to Davis Bacon Wages, Sustainable Buildings Ordinance, and Sea Level Rise Ordinance requirements. Funding sources include Future Financing, FAA, and FDOT Funds. The contract was advertised on March 12, 2026, and closed on May 1, 2026, with two bids received. Cherokee Enterprises, Inc. was the lowest bidder.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Approved (Resolution)
- Address:
- Miami International Airport
- Applicant:
- Cherokee Enterprises, Inc.
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, gratis por 7 días. Sin tarjeta de crédito.
Comienza tu prueba gratis