Browse Miami-Dade County civic records
Every published record for Miami-Dade County, newest first. Filter by board, year, or industry to jump straight to the records you want, and page through to reach the full archive.
17,484 records
OFF-SYSTEM AGREEMENT FOR LOCAL ROADWAY IMPROVEMENTS
Resolution approving an Off-System Construction and Maintenance Agreement between Miami-Dade County and the Florida Department of Transportation for local roadway improvements for SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, with a portion of the project including work on NW 74th Street Connector and NW 72nd Avenue. The project is estimated to cost $5,900,000, funded and built by FDOT, with an anticipated construction start date of March 2027. The Transportation Committee forwarded it to the BCC with a favorable recommendation on 7/14/2026. The agenda date is 9/1/2026. The County is required to provide maintenance operations within the County's right-of-way upon completion. Improvements include curb ramps, sidewalk, curb and gutter, milling and resurfacing, widening, striping, traffic separator, loops, and signage. The project is in Districts 6 and 12. The person responsible for monitoring is Maria D. Molina P.E., Chief, Right-of-Way and Stormwater Planning and Design Division. The item has 21 pages. No public comment sentiment is stated.
- Board:
- Transportation Cmte
- Date:
- 2026-07-14
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation by Transportation Committee on 7/14/2026; pending BCC assignment
- Address:
- SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road; a portion includes work on NW 74th Street Connector and NW 72nd Avenue
- Applicant:
- Miami-Dade County and Florida Department of Transportation
OFF-SYSTEM AGREEMENT FOR LOCAL ROADWAY IMPROVEMENTS
Miami-Dade County Board of County Commissioners is approving an Off-System Construction and Maintenance Agreement with the Florida Department of Transportation (FDOT) for local roadway improvements on SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road. The project includes work on NW 74th Street Connector and NW 72nd Avenue. Specific improvements include reconstruction of sidewalks, curb ramps, curb and gutter, milling and resurfacing, widening, striping, traffic separators, loops, and signage. The project is estimated to cost $5,900,000 and will be funded and built by FDOT, with an anticipated construction start date of March 2027. Miami-Dade County will be responsible for maintenance operations upon project completion.
- Board:
- Transportation Cmte
- Date:
- 2026-07-14
- Type:
- Resolution
- Decision:
- Approved (Resolution)
- Address:
- SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, including work on NW 74th Street Connector and NW 72nd Avenue
- Applicant:
- Florida Department of Transportation (FDOT) and Miami-Dade County
OFF-SYSTEM AGREEMENT FOR LOCAL ROADWAY IMPROVEMENTS
Miami-Dade County Board of County Commissioners is considering an Off-System Construction and Maintenance Agreement with the Florida Department of Transportation (FDOT) for local roadway improvements along SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road. The project includes work on NW 74th Street Connector and NW 72nd Avenue. Specific improvements include reconstruction of sidewalks, curb ramps, curb and gutter, milling and resurfacing, widening, striping, traffic separators, loops, and signage. The project is estimated to cost $5,900,000 and will be funded and built by FDOT. The anticipated construction start date is March 2027. The Transportation Committee forwarded the item to the Board with a favorable recommendation.
- Board:
- Transportation Cmte
- Date:
- 2026-07-14
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation (Transportation Committee)
- Address:
- SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, including work on NW 74th Street Connector and NW 72nd Avenue
- Applicant:
- Miami-Dade County and Florida Department of Transportation (FDOT)
OFF-SYSTEM AGREEMENT FOR LOCAL ROADWAY IMPROVEMENTS
Resolution approving an Off-System Construction and Maintenance Agreement between Miami-Dade County and the Florida Department of Transportation for local roadway improvements for SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, with a portion of the project including work on NW 74th Street Connector and NW 72nd Avenue. The project is estimated to cost $5,900,000, funded and built by FDOT, with an anticipated construction start date of March 2027. The Transportation Committee forwarded it to the BCC with a favorable recommendation on 7/14/2026, and the agenda date is 9/1/2026. The County is required to provide maintenance operations within the County's right-of-way upon completion. Specific improvements include curb ramps, sidewalk, curb and gutter, milling and resurfacing, widening, striping, traffic separator, loops, and signage. The project is in Districts 6 and 12.
- Board:
- Transportation Cmte
- Date:
- 2026-07-14
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation by Transportation Committee on 7/14/2026; pending BCC assignment; agenda date 9/1/2026
- Address:
- SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road; a portion includes work on NW 74th Street Connector and NW 72nd Avenue
- Applicant:
- Miami-Dade County and Florida Department of Transportation
OFF-SYSTEM AGREEMENT FOR LOCAL ROADWAY IMPROVEMENTS
Miami-Dade County Board of County Commissioners is set to approve an Off-System Construction and Maintenance Agreement with the Florida Department of Transportation (FDOT) for local roadway improvements on SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road. The project, which includes work on NW 74th Street Connector and NW 72nd Avenue, involves reconstruction of sidewalks, curb ramps, curb and gutter, milling and resurfacing, widening, striping, traffic separators, loops, and signage. FDOT will fund and build the project, estimated at $5,900,000, with an anticipated construction start date of March 2027. Miami-Dade County will be responsible for maintenance operations upon project completion, funded through the DTPW General Fund. The Transportation Committee forwarded the item to the Board with a favorable recommendation.
- Board:
- Transportation Cmte
- Date:
- 2026-07-14
- Type:
- Resolution
- Decision:
- Pending BCC Assignment (Resolution approving agreement)
- Address:
- SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, including work on NW 74th Street Connector and NW 72nd Avenue
- Applicant:
- Florida Department of Transportation (FDOT) and Miami-Dade County
OFF-SYSTEM AGREEMENT FOR LOCAL ROADWAY IMPROVEMENTS
Miami-Dade County Board of County Commissioners is considering an Off-System Construction and Maintenance Agreement with the Florida Department of Transportation (FDOT) for roadway improvements on SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, including work on NW 74th Street Connector and NW 72nd Avenue. The project, with an estimated cost of $5,900,000, will be funded and built by FDOT, with construction anticipated to start in March 2027. Improvements include sidewalk reconstruction, curb ramps, milling and resurfacing, widening, striping, and traffic separators. The County will be responsible for maintenance upon project completion.
- Board:
- Transportation Cmte
- Date:
- 2026-07-14
- Type:
- Resolution
- Decision:
- Pending BCC Assignment
- Address:
- SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, including work on NW 74th Street Connector and NW 72nd Avenue
- Applicant:
- Miami-Dade County and Florida Department of Transportation
OFF-SYSTEM AGREEMENT FOR LOCAL ROADWAY IMPROVEMENTS
Miami-Dade County is approving an Off-System Construction and Maintenance Agreement with the Florida Department of Transportation (FDOT) for roadway improvements along SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road. The project includes work on NW 74th Street Connector and NW 72nd Avenue. Specific improvements include reconstruction of sidewalks, curb ramps, milling and resurfacing, widening, striping, and a traffic separator. The project is estimated to cost $5,900,000, funded and built by FDOT, with an anticipated construction start date of March 2027. Miami-Dade County will be responsible for maintenance operations upon completion.
- Board:
- Transportation Cmte
- Date:
- 2026-07-14
- Type:
- Resolution
- Decision:
- Approved (Resolution)
- Address:
- SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, including work on NW 74th Street Connector and NW 72nd Avenue
- Applicant:
- Miami-Dade County and Florida Department of Transportation
OFF-SYSTEM AGREEMENT FOR LOCAL ROADWAY IMPROVEMENTS
Miami-Dade County is approving an Off-System Construction and Maintenance Agreement with the Florida Department of Transportation (FDOT) for roadway improvements on SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road. The project includes work on NW 74th Street Connector and NW 72nd Avenue. Specific improvements include reconstruction of sidewalks, curb ramps, milling and resurfacing, widening, striping, and a traffic separator. The project is estimated to cost $5,900,000, funded and built by FDOT, with an anticipated construction start date of March 2027. Miami-Dade County will be responsible for maintenance operations upon project completion.
- Board:
- Transportation Cmte
- Date:
- 2026-07-14
- Type:
- Resolution
- Decision:
- Approved (Resolution)
- Address:
- SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, including work on NW 74th Street Connector and NW 72nd Avenue
- Applicant:
- Miami-Dade County and Florida Department of Transportation
OFF-SYSTEM AGREEMENT FOR LOCAL ROADWAY IMPROVEMENTS
Miami-Dade County Board of County Commissioners is considering an Off-System Construction and Maintenance Agreement with the Florida Department of Transportation (FDOT) for local roadway improvements along SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road. The project, with an estimated cost of $5,900,000 funded by FDOT, includes reconstruction of sidewalks, curb ramps, milling and resurfacing, widening, striping, traffic separators, loops, and signage. The anticipated construction start date is March 2027. The Transportation Committee forwarded the item to the Board with a favorable recommendation on July 14, 2026. The Board of County Commissioners is scheduled to review this on September 1, 2026.
- Board:
- Transportation Cmte
- Date:
- 2026-07-14
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation by Transportation Committee
- Address:
- SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road
- Applicant:
- Florida Department of Transportation (FDOT) and Miami-Dade County
OFF-SYSTEM AGREEMENT FOR LOCAL ROADWAY IMPROVEMENTS
Miami-Dade County is approving an Off-System Construction and Maintenance Agreement with the Florida Department of Transportation (FDOT) for local roadway improvements along SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road. The project includes work on NW 74th Street Connector and NW 72nd Avenue. Specific improvements include reconstruction of sidewalks, curb ramps, curb and gutter, milling and resurfacing, widening, striping, traffic separators, loops, and signage. The project is estimated to cost $5,900,000 and will be funded and built by FDOT, with an anticipated construction start date of March 2027. Miami-Dade County will be responsible for maintenance operations upon project completion.
- Board:
- Transportation Cmte
- Date:
- 2026-07-14
- Type:
- Resolution
- Decision:
- Approved (Resolution)
- Address:
- SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, including work on NW 74th Street Connector and NW 72nd Avenue
- Applicant:
- Miami-Dade County and Florida Department of Transportation
OFF-SYSTEM AGREEMENT FOR LOCAL ROADWAY IMPROVEMENTS
Resolution approving an Off-System Construction and Maintenance Agreement between Miami-Dade County and the Florida Department of Transportation for local roadway improvements for SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, including work on NW 74th Street Connector and NW 72nd Avenue. Project No. FM452566-1-52-01. Estimated cost $5,900,000, funded and built by FDOT. Anticipated construction start March 2027. Improvements include curb ramps, sidewalk, curb and gutter, milling and resurfacing, widening, striping, traffic separator, loops, signage. County required to provide maintenance operations upon completion. Transportation Cmte forwarded to BCC with favorable recommendation on 7/14/2026. Agenda date 9/1/2026, item 8N6. File Number 261136. Introduced 6/22/2026. Requester: Transportation and Public Works. Status: Before the Board. No public comment stated.
- Board:
- Transportation Cmte
- Date:
- 2026-07-14
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation by Transportation Cmte on 7/14/2026; pending BCC action on 9/1/2026
- Address:
- SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road; portion includes NW 74th Street Connector and NW 72nd Avenue, Miami-Dade County, Florida
- Applicant:
- Miami-Dade County and Florida Department of Transportation
OFF-SYSTEM AGREEMENT FOR LOCAL ROADWAY IMPROVEMENTS
Miami-Dade County Board of County Commissioners is set to approve an Off-System Construction and Maintenance Agreement with the Florida Department of Transportation (FDOT) for roadway improvements along SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road. The project, identified as Project No. FM452566-1-52-01, includes work on NW 74th Street Connector and NW 72nd Avenue. Specific improvements involve reconstruction of sidewalks, curb ramps, milling and resurfacing, widening, striping, and installation of a traffic separator, curb and gutter, loops, and signage. FDOT will fund and build the project, estimated at $5,900,000, with an anticipated construction start date of March 2027. Miami-Dade County will be responsible for ongoing maintenance. The Transportation Committee forwarded the item to the Board with a favorable recommendation.
- Board:
- Transportation Cmte
- Date:
- 2026-07-14
- Type:
- Resolution
- Decision:
- Approved (Resolution)
- Address:
- SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, including work on NW 74th Street Connector and NW 72nd Avenue
- Applicant:
- Florida Department of Transportation (FDOT) and Miami-Dade County
OFF-SYSTEM AGREEMENT FOR LOCAL ROADWAY IMPROVEMENTS
Resolution approving an Off-System Construction and Maintenance Agreement between Miami-Dade County and the Florida Department of Transportation for local roadway improvements for SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, with a portion of the project including work on NW 74th Street Connector and NW 72nd Avenue. The project is estimated to cost $5,900,000, funded and built by FDOT, with an anticipated construction start date of March 2027. The Transportation Committee forwarded it to the BCC with a favorable recommendation on 7/14/2026, and the BCC agenda date is 9/1/2026. The County is required to provide maintenance operations within the County's right-of-way upon completion. The project is in Districts 6 and 12, represented by Commissioner Natalie Milian Orbis and Commissioner Juan Carlos Bermudez, respectively. The person responsible for monitoring is Maria D. Molina P.E., Chief, Right-of-Way and Stormwater Planning and Design Division. The improvements include curb ramps, sidewalk, curb and gutter, milling and resurfacing, widening, striping, traffic separator, loops, and signage. If additional right-of-way is required, FDOT shall acquire it at no cost to the County.
- Board:
- Transportation Cmte
- Date:
- 2026-07-14
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation by Transportation Committee on 7/14/2026; pending BCC action on 9/1/2026
- Address:
- SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road; a portion includes work on NW 74th Street Connector and NW 72nd Avenue
- Applicant:
- Miami-Dade County and Florida Department of Transportation
OFF-SYSTEM AGREEMENT FOR LOCAL ROADWAY IMPROVEMENTS
Miami-Dade County Board of County Commissioners (BCC) is set to approve an Off-System Construction and Maintenance Agreement between Miami-Dade County and the Florida Department of Transportation (FDOT) for local roadway improvements. The project, identified as Project No. FM452566-1-52-01, involves improvements to SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, including work on NW 74th Street Connector and NW 72nd Avenue. Specific improvements include reconstruction of sidewalks, curb ramps, curb and gutter, milling and resurfacing, widening, striping, traffic separators, loops, and signage. The project is estimated to cost $5,900,000, funded and built by FDOT, with an anticipated construction start date of March 2027. Miami-Dade County will be responsible for maintenance operations upon project completion, funded through DTPW's General Fund. The Transportation Committee forwarded the item to the BCC with a favorable recommendation.
- Board:
- Transportation Cmte
- Date:
- 2026-07-14
- Type:
- Resolution
- Decision:
- Pending BCC Assignment (Resolution approving agreement)
- Address:
- SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, including work on NW 74th Street Connector and NW 72nd Avenue
- Applicant:
- Miami-Dade County and Florida Department of Transportation
OFF-SYSTEM AGREEMENT FOR LOCAL ROADWAY IMPROVEMENTS
Resolution approving an Off-System Construction and Maintenance Agreement between Miami-Dade County and the Florida Department of Transportation for local roadway improvements for SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, with a portion of the project including work on NW 74th Street Connector and NW 72nd Avenue. The project is estimated to cost $5,900,000, funded and built by FDOT, with an anticipated construction start date of March 2027. The Transportation Cmte forwarded it to the BCC with a favorable recommendation on 7/14/2026. The agenda date is 9/1/2026. Specific improvements include curb ramps, sidewalk, curb and gutter, milling and resurfacing, widening, striping, traffic separator, loops, and signage. The County is required to provide maintenance operations within the County's right-of-way upon completion. The project is in Districts 6 and 12. The resolution authorizes the County Mayor or designee to execute the agreement.
- Board:
- Transportation Cmte
- Date:
- 2026-07-14
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation by Transportation Cmte on 7/14/2026; pending BCC assignment; agenda date 9/1/2026
- Address:
- SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road; a portion includes work on NW 74th Street Connector and NW 72nd Avenue, Miami-Dade County, Florida
- Applicant:
- Miami-Dade County and Florida Department of Transportation
OFF-SYSTEM AGREEMENT FOR LOCAL ROADWAY IMPROVEMENTS
Miami-Dade County Board of County Commissioners is considering approving an Off-System Construction and Maintenance Agreement with the Florida Department of Transportation (FDOT) for local roadway improvements. The project, identified as Project No. FM452566-1-52-01, involves SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, including work on NW 74th Street Connector and NW 72nd Avenue. Specific improvements include sidewalk reconstruction, curb ramps, milling and resurfacing, widening, striping, and traffic separators. The project is estimated to cost $5,900,000, funded and built by FDOT, with an anticipated construction start date of March 2027. Miami-Dade County will be responsible for maintenance operations upon project completion.
- Board:
- Transportation Cmte
- Date:
- 2026-07-14
- Type:
- Resolution
- Decision:
- Pending BCC Assignment (Resolution approving agreement)
- Address:
- SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, including work on NW 74th Street Connector and NW 72nd Avenue
- Applicant:
- Florida Department of Transportation (FDOT) and Miami-Dade County
OFF-SYSTEM AGREEMENT FOR LOCAL ROADWAY IMPROVEMENTS
Miami-Dade County Board of County Commissioners is considering an Off-System Construction and Maintenance Agreement with the Florida Department of Transportation (FDOT) for local roadway improvements along SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road. The project, with an estimated cost of $5,900,000, will be funded and built by FDOT, with an anticipated construction start date of March 2027. Improvements include reconstruction of sidewalks, curb ramps, milling and resurfacing, widening, striping, traffic separators, and signage. The County will be responsible for maintenance operations upon project completion. The Transportation Committee forwarded the item to the Board with a favorable recommendation.
- Board:
- Transportation Cmte
- Date:
- 2026-07-14
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation
- Address:
- SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road
- Applicant:
- Florida Department of Transportation (FDOT) and Miami-Dade County
OFF-SYSTEM AGREEMENT FOR LOCAL ROADWAY IMPROVEMENTS
Miami-Dade County Board of County Commissioners is considering an Off-System Construction and Maintenance Agreement with the Florida Department of Transportation (FDOT) for roadway improvements on SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road. The project includes work on NW 74th Street Connector and NW 72nd Avenue. Specific improvements include reconstruction of sidewalks, curb ramps, curb and gutter, milling and resurfacing, widening, striping, traffic separators, loops, and signage. The project is estimated to cost $5,900,000, funded and built by FDOT, with an anticipated construction start date of March 2027. Miami-Dade County will be responsible for maintenance operations upon project completion. The Transportation Committee forwarded the item to the Board with a favorable recommendation.
- Board:
- Transportation Cmte
- Date:
- 2026-07-14
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation by Transportation Committee; pending Board of County Commissioners approval
- Address:
- SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, including work on NW 74th Street Connector and NW 72nd Avenue
- Applicant:
- Florida Department of Transportation (FDOT) and Miami-Dade County
OFF-SYSTEM AGREEMENT FOR LOCAL ROADWAY IMPROVEMENTS
Miami-Dade County Board of County Commissioners is set to approve an Off-System Construction and Maintenance Agreement with the Florida Department of Transportation (FDOT) for local roadway improvements along SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road. The project includes work on NW 74th Street Connector and NW 72nd Avenue. Specific improvements involve reconstruction of sidewalks, curb ramps, curb and gutter, milling and resurfacing, widening, striping, traffic separators, loops, and signage. The project is estimated to cost $5,900,000, funded and built by FDOT, with an anticipated construction start date of March 2027. Miami-Dade County will be responsible for maintenance operations upon project completion.
- Board:
- Transportation Cmte
- Date:
- 2026-07-14
- Type:
- Resolution
- Decision:
- Recommended for approval by Transportation Committee, pending Board of County Commissioners approval
- Address:
- SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, including work on NW 74th Street Connector and NW 72nd Avenue
- Applicant:
- Florida Department of Transportation (FDOT) and Miami-Dade County
OFF-SYSTEM AGREEMENT FOR LOCAL ROADWAY IMPROVEMENTS
Miami-Dade County Board of County Commissioners is set to approve an Off-System Construction and Maintenance Agreement with the Florida Department of Transportation (FDOT) for roadway improvements on SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road. The project, with an estimated cost of $5,900,000, will be funded and built by FDOT, with construction anticipated to start in March 2027. Improvements include sidewalk reconstruction, curb ramps, milling and resurfacing, widening, striping, and traffic separators. Miami-Dade County will be responsible for maintenance operations upon project completion.
- Board:
- Transportation Cmte
- Date:
- 2026-07-14
- Type:
- Resolution
- Decision:
- Approved (Resolution)
- Address:
- SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road
- Applicant:
- Miami-Dade County and Florida Department of Transportation
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, gratis por 7 días. Sin tarjeta de crédito.
Comienza tu prueba gratis