CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners is approving Change Order No. 1 to Contract No. S-958 with Lanzo Construction Co., Florida. This change order grants a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total contract award to $12,664,944.53. The project involves the installation of 16-inch, 12-inch, and 8-inch DI water main and 10-inch and 8-inch DI gravity sewer along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The increase is due to differing subsurface conditions requiring larger trenching and additional restoration, and unforeseen conflicts with communication and electrical duct banks. Funds will be used from the Building Better Communities General Obligation Bond Program. The original contract was awarded on November 22, 2021, for $7,253,128.25. The Infrastructure, Innovation & Technology Committee forwarded this item to the Board with a favorable recommendation.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Approved (Change Order No. 1)
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street and along NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County is approving Change Order No. 1 to Contract No. S-958 with Lanzo Construction Co., Florida, for the D2-C2 project. This change order grants a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total contract award to $12,664,944.53. The project involves installing 16-inch, 12-inch, and 8-inch DI water mains and 10-inch and 8-inch DI gravity sewers along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The increase in cost and time is attributed to differing subsurface conditions requiring larger trenching and additional restoration, as well as unforeseen conflicts with communication and electrical duct banks. Funds for the wastewater service extension will come in part from the Building Better Communities General Obligation Bond Program Project No. 17. The Infrastructure, Innovation & Technology Committee forwarded this item to the Board of County Commissioners with a favorable recommendation.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Approved (Change Order No. 1)
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street and NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners is considering Change Order #1 for Contract S-958 with Lanzo Construction Co., Florida. This change order approves a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total contract value to $12,664,944.53. The project involves installing 16-inch, 12-inch, and 8-inch DI water mains and 10-inch and 8-inch DI gravity sewers along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The increase in cost and time is attributed to unforeseen subsurface conditions requiring extensive roadway restoration, and conflicts with existing communication and electrical duct banks. Funds will be utilized from the Building Better Communities General Obligation Bond Program. The Infrastructure, Innovation & Technology Committee forwarded this item to the Board with a favorable recommendation. The original contract was awarded on November 22, 2021, and ratified on March 15, 2022. The revised substantial completion date is February 15, 2027, and the final completion date is March 17, 2027.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Pending Board of County Commissioners approval
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street and NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners approved Change Order No. 1 to Contract No. S-958 with Lanzo Construction Co., Florida. This change order grants a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total contract award to $12,664,944.53. The project involves the installation of 16-inch, 12-inch, and 8-inch DI water main and 10-inch and 8-inch DI gravity sewer along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The increase is due to differing subsurface conditions requiring larger trenching and additional restoration, and unforeseen conflicts with communication and electrical duct banks. Funds will be used from the Building Better Communities General Obligation Bond (GOB) Program Project No. 17. The original contract was awarded on November 22, 2021, for $7,253,128.25 with a 750-day duration. The revised substantial completion date is February 15, 2027, and the final completion date is March 17, 2027. Public comment is not stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Approved
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street and NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners is approving Change Order No. 1 to Contract No. S-958 with Lanzo Construction Co., Florida. This change order grants a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total contract award to $12,664,944.53. The project involves installing 16-inch, 12-inch, and 8-inch DI water main and 10-inch and 8-inch DI gravity sewer along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The increase is due to differing subsurface conditions requiring larger trenching and additional restoration, as well as unforeseen conflicts with communication and electrical duct banks. Funds will be used from the Building Better Communities General Obligation Bond Program. The Infrastructure, Innovation & Technology Committee forwarded this item to the Board with a favorable recommendation.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Approved (Change Order No. 1 approved)
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street and along NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners is considering Change Order #1 for Contract S-958 with Lanzo Construction Co., Florida. This change order approves a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total contract value to $12,664,944.53. The project involves installing 16-inch, 12-inch, and 8-inch DI water mains and 10-inch and 8-inch DI gravity sewers along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The increase in cost and time is attributed to unforeseen subsurface conditions requiring extensive roadway restoration, and conflicts with existing communication and electrical duct banks. Funds for the wastewater service extension will be sourced from the Building Better Communities General Obligation Bond Program. The Infrastructure, Innovation & Technology Committee forwarded this item to the Board with a favorable recommendation. The original contract was awarded on November 22, 2021, and ratified on March 15, 2022. The revised substantial completion date is February 15, 2027, and the final completion date is March 17, 2027.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Pending Board of County Commissioners approval (recommended favorable by Infrastructure, Innovation & Technology Committee)
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street and NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners is approving Change Order No. 1 to Contract No. S-958 with Lanzo Construction Co., Florida. This change order grants a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total contract award to $12,664,944.53. The project involves the installation of 16-inch, 12-inch, and 8-inch DI water main and 10-inch and 8-inch DI gravity sewer along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The increase is due to differing subsurface conditions requiring larger trenching and additional restoration, and unforeseen conflicts with communication and electrical duct banks. Funds will be used from the Building Better Communities General Obligation Bond Program. The original contract was awarded on November 22, 2021, for $7,253,128.25 with a 750-day duration. The Infrastructure, Innovation & Technology Committee forwarded this item to the Board with a favorable recommendation.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Approved (Change Order No. 1)
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street and along NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners is considering Change Order #1 for Contract S-958 with Lanzo Construction Co., Florida. This change order approves a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total contract value to $12,664,944.53. The project involves installing 16-inch, 12-inch, and 8-inch DI water mains and 10-inch and 8-inch DI gravity sewers along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The increase in cost and time is attributed to unforeseen subsurface conditions requiring extensive roadway restoration, and conflicts with existing communication and electrical duct banks. Funds will be utilized from the Building Better Communities General Obligation Bond Program. The Infrastructure, Innovation & Technology Committee forwarded this item to the Board with a favorable recommendation.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Infrastructure, Innovation & Technology Committee; pending Board of County Commissioners approval.
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street and NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners is considering Change Order #1 for Contract S-958 with Lanzo Construction Co., Florida. This change order approves a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total contract value to $12,664,944.53. The project involves installing 16-inch, 12-inch, and 8-inch DI water mains and 10-inch and 8-inch DI gravity sewers along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The increase in cost and time is attributed to unforeseen subsurface conditions requiring extensive roadway restoration, and conflicts with existing communication and electrical duct banks. Funds for the wastewater service extension will be sourced from the Building Better Communities General Obligation Bond (GOB) Program Project No. 17. The Infrastructure, Innovation & Technology Committee forwarded this item to the Board with a favorable recommendation. The original contract was awarded on November 22, 2021, and ratified on March 15, 2022. The revised substantial completion date is February 15, 2027, and the final completion date is March 17, 2027.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Infrastructure, Innovation & Technology Committee; pending Board of County Commissioners approval
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street and NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners is considering Change Order #1 for Contract S-958 with Lanzo Construction Co., Florida. This change order grants a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total contract value to $12,664,944.53. The project involves installing 16-inch, 12-inch, and 8-inch DI water mains and 10-inch and 8-inch DI gravity sewers along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The increase is due to unforeseen subsurface conditions requiring extensive roadway restoration and conflicts with communication and electrical duct banks. Funds will be utilized from the Building Better Communities General Obligation Bond Program. The Infrastructure, Innovation & Technology Committee forwarded this item to the Board with a favorable recommendation.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation (Infrastructure, Innovation & Technology Committee); Pending BCC Assignment (Board of County Commissioners)
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street, and NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners is approving Change Order No. 1 to Contract No. S-958 with Lanzo Construction Co., Florida. This change order grants a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total contract award to $12,664,944.53. The project involves proposed 16-inch, 12-inch, and 8-inch DI water main and 10-inch and 8-inch DI gravity sewer along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The increase is due to differing subsurface conditions requiring larger trenching and additional restoration, as well as unforeseen conflicts with communication and electrical duct banks. Funds will be used from the Building Better Communities General Obligation Bond Program Project No. 17. The Infrastructure, Innovation & Technology Committee forwarded this item to the Board with a favorable recommendation.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Approved (Change Order No. 1 approved)
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street and along NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners is considering Change Order #1 for Contract S-958 with Lanzo Construction Co., Florida. This change order approves a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total contract value to $12,664,944.53. The project involves installing 16-inch, 12-inch, and 8-inch DI water mains and 10-inch and 8-inch DI gravity sewers along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The increase in cost and time is attributed to unforeseen subsurface conditions requiring extensive roadway restoration, and conflicts with existing communication and electrical duct banks. Funds will be utilized from the Building Better Communities General Obligation Bond Program. The Infrastructure, Innovation & Technology Committee forwarded this item to the Board with a favorable recommendation. The original contract was awarded on November 22, 2021, and ratified on March 15, 2022.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Pending Board of County Commissioners approval
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street and NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners is considering Change Order #1 for Contract S-958 with Lanzo Construction Co., Florida. This change order grants a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total contract value to $12,664,944.53. The project involves installing 16-inch, 12-inch, and 8-inch DI water mains and 10-inch and 8-inch DI gravity sewers along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The increase is due to unforeseen subsurface conditions requiring extensive roadway restoration and conflicts with communication and electrical duct banks. Funds will be utilized from the Building Better Communities General Obligation Bond Program. The Infrastructure, Innovation & Technology Committee forwarded this item to the Board with a favorable recommendation.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Infrastructure, Innovation & Technology Committee; pending Board of County Commissioners decision.
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street, and NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Miami-Dade County Board of County Commissioners is ratifying Change Order No. 1 to Contract No. S-945 with Ric-Man International, Inc. for the construction of a 60-inch Force Main (NL-1A) (West Segment). This change order increases the total contract amount by $1,662,315.17 and grants a 426-calendar day time extension. The project involved approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main along NW 162nd Street from NW 6th Avenue to NE 8th Avenue. The increase in cost is attributed to utility conflicts, required roadway repairs, tree mitigation, failures of existing asbestos cement pipe water mains, and unforeseen site conditions. The project has been successfully completed. The original contract was awarded on January 7, 2021, and ratified by the Board on April 20, 2021. The change order extends the substantial completion date to August 5, 2024, and the final completion date to October 4, 2024. The project is part of Miami-Dade Water and Sewer Department's Capital Improvement Program. Small Business Enterprise (SBE) goals for the contract are expected to be satisfied upon approval of this change order.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Resolution ratifying action by the County Mayor or County Mayor’s designee, specifically approval of Change Order No. 1
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Miami-Dade County Board of County Commissioners is set to ratify Change Order No. 1 to Contract No. S-945 with Ric-Man International, Inc. for the construction of a 60-inch Force Main (NL-1A) (West Segment). This change order increases the total contract amount by $1,662,315.17 and grants a 426-calendar day time extension. The project involved approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main along NW 162nd Street from NW 6th Avenue to NE 8th Avenue. The increase in cost is attributed to various construction challenges including utility conflicts, roadway repairs, tree mitigation, failures of existing asbestos cement pipe water mains, and unforeseen site conditions. The project is part of Miami-Dade Water and Sewer Department's Capital Improvement Program. The change order was introduced on 6/30/2026 and is scheduled for an agenda date of 7/21/2026. The project has since been completed. No public comment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Pending BCC Assignment (for ratification of Change Order No. 1)
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Miami-Dade County Board of County Commissioners is set to ratify Change Order No. 1 to Contract No. S-945 with Ric-Man International, Inc. for the construction of a 60-inch Force Main (NL-1A) (West Segment). This change order increases the total contract amount by $1,662,315.17 and grants a 426-calendar day time extension. The project involved approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main along NW 162nd Street from NW 6th Avenue to NE 8th Avenue. The increase in cost is attributed to various construction challenges including utility conflicts, roadway repairs, tree mitigation, failures of existing asbestos cement pipe water mains, and unforeseen site conditions. The project has been successfully completed, and this change order serves as the final contract closeout. The original contract was awarded on January 7, 2021, and ratified by the Board on April 20, 2021. The total contract value will increase from $19,314,785.95 to $20,977,101.12. The change order includes a value engineering credit of $56,150.00 and reallocation of $720,899.14 in unused contract funds to offset additional costs. Small Business Enterprise (SBE) goals for the contract are expected to be met upon approval of this change order.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Recommended for ratification
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Miami-Dade County Board of County Commissioners is ratifying Change Order No. 1 to Contract No. S-945 with Ric-Man International, Inc. for the construction of a 60-inch Force Main (NL-1A) (West Segment). This change order increases the total contract amount by $1,662,315.17 and grants a 426-calendar day time extension. The project involved approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The increase in contract amount is attributed to various construction challenges including utility conflicts, required roadway repairs, tree mitigation, failures of existing asbestos cement pipe water mains, and unforeseen site conditions. The project has since been successfully completed and this change order serves as the final contract closeout. The project is part of Miami-Dade Water and Sewer Department's Capital Improvement Program.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Resolution ratifying action by the County Mayor or County Mayor’s designee, specifically approval of Change Order No. 1
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Miami-Dade County Board of County Commissioners adopted Resolution R-645-26 on July 21, 2026, ratifying Change Order No. 1 to Contract No. S-945 with Ric-Man International, Inc. This change order increases the contract amount by $1,662,315.17 and grants a 426-calendar day time extension for the construction of a 60-inch force main (NL-1A) (West Segment) along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The project involved approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) and encountered issues such as utility conflicts, roadway repairs, tree mitigation, failures of existing asbestos cement pipe water mains, and differing site conditions. The total contract value increased from $19,314,785.95 to $20,977,101.12. The project is now completed. The change order was funded through WASD Revenue Bonds.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Miami-Dade County Board of County Commissioners is ratifying Change Order No. 1 to Contract No. S-945 with Ric-Man International, Inc. for the construction of a 60-inch Force Main (NL-1A) (West Segment). This change order increases the total contract amount by $1,662,315.17 and grants a 426-calendar day time extension. The project involved approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main along NW 162nd Street from NW 6th Avenue to NE 8th Avenue. The increase in cost is attributed to utility conflicts, required roadway repairs, tree mitigation, pipe interconnection complexities due to unforeseen site conditions, failures of existing asbestos cement pipe water mains, and delays from late design revisions and permitting issues. The project has been successfully completed, and this change order serves as the final contract closeout. The original contract was awarded on January 7, 2021, and ratified by the Board on April 20, 2021. The change order extends the substantial completion date from June 6, 2023, to August 5, 2024, and the final completion date from August 5, 2023, to October 4, 2024. The total contract value increases from $19,314,785.95 to $20,977,101.12. The project is part of Miami-Dade Water and Sewer Department's Capital Improvement Program.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Ratified (Change Order No. 1 approved)
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Miami-Dade County Board of County Commissioners (BCC) is ratifying Change Order #1 to Contract #S-945 with Ric-Man International, Inc. for the construction of a 60-inch Force Main (NL-1A) (West Segment). This change order increases the total contract amount by $1,662,315.17 and grants a 426-calendar day time extension. The project involved approximately 10,000 linear feet of pipe along NW 162 Street from NW 6 Avenue to NE 8 Avenue. Reasons for the change order include utility conflicts, required roadway repairs, tree mitigation, pipe interconnection complexities, failures of existing asbestos cement pipe water mains, and permitting issues. The project has been successfully completed. The original contract was awarded on January 7, 2021, and ratified by the BCC on April 20, 2021. The total contract value will increase from $19,314,785.95 to $20,977,101.12. The change order was funded through WASD Revenue Bonds.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Resolution ratifying action by the County Mayor or County Mayor’s designee approving Change Order No. 1
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Ric-Man International, Inc.

Mira los negocios reales detrás de estos números

Obtén los registros reales, con direcciones y directivos, gratis por 7 días. Sin tarjeta de crédito.

Comienza tu prueba gratis