Skip to main content

Sé el Primero, Construye Relaciones Duraderas

Browse Miami-Dade County civic records

Every published record for Miami-Dade County, newest first. Filter by board, year, or industry to jump straight to the records you want, and page through to reach the full archive.

21,379 records

MOU WITH FDOT FOR COUNTER SYSTEMS ON COUNTY OWNED TRAILS

Miami-Dade County Board of County Commissioners is considering a resolution to ratify a Memorandum of Agreement (MOA) with the Florida Department of Transportation (FDOT) for the installation and maintenance of two counter systems on county-owned trails within the Florida Shared-Use Nonmotorized (SUN) Trail Network. The MOA, effective from September 24, 2025, to September 23, 2026, involves FDOT funding and maintaining the counter systems, while the County's role is limited to approving installation locations and coordinating schedules. The resolution also delegates authority to the County Mayor or designee to enter into future similar agreements with FDOT for additional counter systems, provided they have no negative fiscal impact on the County. The Transportation Committee forwarded this item with a favorable recommendation. No public comment is stated.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation (Transportation Committee); Resolution ratification is pending Board of County Commissioners approval.
Address:
10800 Collins Avenue (Atlantic Greenway Trail, Haulover Park) and West Palm Drive (South Dade Trail, Florida City)
Applicant:
Miami-Dade County (Parks, Recreation and Open Spaces Department and Department of Transportation and Public Works) and Florida Department of Transportation

MOU WITH FDOT FOR COUNTER SYSTEMS ON COUNTY OWNED TRAILS

Miami-Dade County Board of County Commissioners (BCC) is considering a resolution to ratify a Memorandum of Agreement (MOA) with the Florida Department of Transportation (FDOT) for the installation and maintenance of two counter systems on county-owned trails within the Florida Shared-Use Nonmotorized (SUN) Trail Network. FDOT will fund and maintain the hardware, while the County's role is limited to approving locations and coordinating schedules. The MOA term is from September 24, 2025, to September 23, 2026. The resolution also delegates authority to the County Mayor or designee to enter into future similar agreements with FDOT for counter systems on county trails, provided they have no negative fiscal impact on the County and are approved by the County Attorney's Office. The Transportation Committee forwarded the item to the BCC with a favorable recommendation.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Transportation Committee; Pending BCC Assignment
Address:
10800 Collins Avenue (Haulover Park, Atlantic Greenway Trail) and West Palm Drive (South Dade Trail, Florida City)
Applicant:
Miami-Dade County Parks, Recreation and Open Spaces Department and Department of Transportation and Public Works (DTPW) in conjunction with Florida Department of Transportation (FDOT)

MOU WITH FDOT FOR COUNTER SYSTEMS ON COUNTY OWNED TRAILS

Miami-Dade County Board of County Commissioners (BCC) is considering a resolution to ratify a Memorandum of Agreement (MOA) with the Florida Department of Transportation (FDOT) for the installation and maintenance of two counter systems on county-owned trails within the Florida Shared-Use Nonmotorized (SUN) Trail Network. The MOA, effective from September 24, 2025, to September 23, 2026, allows FDOT to install and maintain the hardware, with Miami-Dade County responsible for approving locations and coordinating schedules. The resolution also delegates authority to the County Mayor or designee to enter into future similar agreements with FDOT for additional counter systems, provided they have no negative fiscal impact on the County. The Transportation Committee forwarded this item to the BCC with a favorable recommendation. No public comment is stated in the document.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Transportation Committee; Pending BCC Assignment
Address:
10800 Collins Avenue (Haulover Park, Atlantic Greenway Trail) and West Palm Drive (South Dade Trail, Florida City)
Applicant:
Miami-Dade County Parks, Recreation and Open Spaces Department and Department of Transportation and Public Works (DTPW) in conjunction with Florida Department of Transportation (FDOT)

MOU WITH FDOT FOR COUNTER SYSTEMS ON COUNTY OWNED TRAILS

Miami-Dade County Board of County Commissioners (BCC) is considering a resolution to ratify a Memorandum of Agreement (MOA) with the Florida Department of Transportation (FDOT) for the installation and maintenance of two counter systems on county-owned trails within the Florida Shared-Use Nonmotorized (SUN) Trail Network. FDOT will fund and maintain the hardware, while the County's role is limited to approving locations and coordinating schedules. The MOA has a term from September 24, 2025, to September 23, 2026. The resolution also delegates authority to the County Mayor or designee to enter into future similar agreements with FDOT for additional counter systems, provided they have no negative fiscal impact on the County. The Transportation Committee forwarded this item to the BCC with a favorable recommendation. No public comment is stated in the document.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Transportation Committee; pending BCC Assignment.
Address:
10800 Collins Avenue (Atlantic Greenway Trail, within Haulover Park) and West Palm Drive (South Dade Trail, within Florida City)
Applicant:
Miami-Dade County (Parks, Recreation and Open Spaces Department and Department of Transportation and Public Works) and Florida Department of Transportation (FDOT)

MOU WITH FDOT FOR COUNTER SYSTEMS ON COUNTY OWNED TRAILS

Resolution to retroactively ratify a Memorandum of Agreement between Miami-Dade County and the Florida Department of Transportation for installation and maintenance of two counter systems on County-owned trails within the Florida Shared-Use Nonmotorized (SUN) Trail Network. The first site is on the Atlantic Greenway Trail within Haulover Park at 10800 Collins Avenue, operated by the Miami-Dade County Parks, Recreation and Open Spaces Department, in Commission District 4. The second site is on South Dade Trail at West Palm Drive in Florida City, Florida, operated by the Miami-Dade County Department of Transportation and Public Works, in Commission District 9. The MOA term is from September 24, 2025 to September 23, 2026. The resolution also delegates to the County Mayor or designee authority to enter into future similar agreements with FDOT. The Transportation Committee forwarded the item to the BCC with a favorable recommendation on 7/14/2026. The item is scheduled for the BCC agenda on 9/1/2026 as item 8H2. No fiscal impact to the County; FDOT funds all costs. No public comment or stakeholder sentiment is stated in the document.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Transportation Cmte on 7/14/2026; pending BCC action on 9/1/2026
Address:
10800 Collins Avenue (Atlantic Greenway Trail, Haulover Park); South Dade Trail at West Palm Drive, Florida City, Florida
Applicant:
Miami-Dade County Parks, Recreation and Open Spaces Department; Miami-Dade County Department of Transportation and Public Works

MOU WITH FDOT FOR COUNTER SYSTEMS ON COUNTY OWNED TRAILS

Miami-Dade County Board of County Commissioners is considering a resolution to ratify a Memorandum of Agreement (MOA) with the Florida Department of Transportation (FDOT) for the installation and maintenance of two counter systems on county-owned trails within the Florida Shared-Use Nonmotorized (SUN) Trail Network. FDOT will fund and maintain the hardware, while the County's role is limited to approving installation locations and coordinating schedules. The agreement is for a term of less than one year, from September 24, 2025, to September 23, 2026. The resolution also delegates authority to the County Mayor or designee to enter into future similar agreements with FDOT for additional counter systems, provided they have no negative fiscal impact on the County. The Transportation Committee forwarded the item to the Board with a favorable recommendation.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Transportation Committee; Pending BCC Assignment
Address:
10800 Collins Avenue (Haulover Park, Atlantic Greenway Trail) and West Palm Drive (South Dade Trail, Florida City)
Applicant:
Miami-Dade County Parks, Recreation and Open Spaces Department and Department of Transportation and Public Works (for the County); Florida Department of Transportation (FDOT)

MOU WITH FDOT FOR COUNTER SYSTEMS ON COUNTY OWNED TRAILS

Miami-Dade County Board of County Commissioners is considering a resolution to ratify a Memorandum of Agreement (MOA) with the Florida Department of Transportation (FDOT) for the installation and maintenance of two counter systems on county-owned trails within the Florida Shared-Use Nonmotorized (SUN) Trail Network. FDOT will fund and maintain the hardware, while the County's role is limited to approving locations and coordinating schedules. The resolution also delegates authority to the County Mayor or designee to enter into future similar agreements with FDOT for additional counter systems, provided they have no negative fiscal impact on the County. The MOA term is from September 24, 2025, to September 23, 2026. The Transportation Committee forwarded this item to the Board with a favorable recommendation.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Transportation Committee; Pending BCC Assignment
Address:
10800 Collins Avenue (Haulover Park, Atlantic Greenway Trail) and West Palm Drive (South Dade Trail, Florida City)
Applicant:
Miami-Dade County Parks, Recreation and Open Spaces Department and Department of Transportation and Public Works (DTPW) in conjunction with Florida Department of Transportation (FDOT)

MOU WITH FDOT FOR COUNTER SYSTEMS ON COUNTY OWNED TRAILS

Resolution to retroactively ratify a Memorandum of Agreement between Miami-Dade County and the Florida Department of Transportation for installation and maintenance of two counter systems on County-owned trails within the Florida Shared-Use Nonmotorized (SUN) Trail Network. The first site is on the Atlantic Greenway Trail within Haulover Park at 10800 Collins Avenue, operated by Parks, Recreation and Open Spaces, in Commission District 4. The second site is on South Dade Trail at West Palm Drive in Florida City, operated by the Department of Transportation and Public Works, in Commission District 9. The MOA term is September 24, 2025 to September 23, 2026. The resolution also delegates authority to the County Mayor or designee to enter into future similar agreements with FDOT. The Transportation Committee forwarded the item to the BCC with a favorable recommendation on 7/14/2026. The agenda date is 9/1/2026. No fiscal impact to the County; FDOT funds all costs. No public comment sentiment is stated.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Transportation Cmte on 7/14/2026; pending BCC action on 9/1/2026
Address:
10800 Collins Avenue (Atlantic Greenway Trail, Haulover Park); South Dade Trail at West Palm Drive, Florida City
Applicant:
Miami-Dade County Parks, Recreation and Open Spaces Department; requester: Parks, Recreation and Open Spaces

MOU WITH FDOT FOR COUNTER SYSTEMS ON COUNTY OWNED TRAILS

Resolution ratifying a Memorandum of Agreement between Miami-Dade County and the Florida Department of Transportation for installation and maintenance of two counter systems on County-owned trails within the Florida Shared-Use Nonmotorized (SUN) Trail Network. The first site is on the Atlantic Greenway Trail within Haulover Park at 10800 Collins Avenue, operated by Miami-Dade County Parks, Recreation and Open Spaces Department, in Commission District 4. The second site is on South Dade Trail at West Palm Drive, Florida City, Florida, operated by the Miami-Dade County Department of Transportation and Public Works, in Commission District 9. The MOA term is from September 24, 2025 to September 23, 2026. FDOT installed and will maintain and fund the counter system hardware. The County's role is limited to approving installation locations and coordinating scheduling. The item seeks retroactive ratification and delegation of authority to the County Mayor or designee to enter into future similar agreements with no negative fiscal impact on the County. The Transportation Committee forwarded the item to the BCC with a favorable recommendation on 7/14/2026. Agenda date is 9/1/2026. No fiscal impact to the County; FDOT funds all costs. No public comment sentiment is stated in the document.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Transportation Cmte on 7/14/2026; pending BCC action on 9/1/2026
Address:
10800 Collins Avenue (Atlantic Greenway Trail, Haulover Park); South Dade Trail at West Palm Drive, Florida City, Florida
Applicant:
Miami-Dade County Parks, Recreation and Open Spaces; Florida Department of Transportation

MOU WITH FDOT FOR COUNTER SYSTEMS ON COUNTY OWNED TRAILS

Miami-Dade County Board of County Commissioners (BCC) is considering a resolution to ratify a Memorandum of Agreement (MOA) with the Florida Department of Transportation (FDOT) for the installation and maintenance of two counter systems on county-owned trails within the Florida Shared-Use Nonmotorized (SUN) Trail Network. The MOA, effective from September 24, 2025, to September 23, 2026, allows FDOT to install and maintain the hardware, with Miami-Dade County responsible for approving installation locations and coordinating schedules. The agreement aims to collect bicycle and pedestrian volume data. The BCC is also asked to delegate authority to the County Mayor or designee to enter into future similar agreements with FDOT for additional counter systems, provided they have no negative fiscal impact on the County. The Transportation Committee forwarded the item to the BCC with a favorable recommendation.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Transportation Committee; Pending BCC Assignment
Address:
10800 Collins Avenue (Haulover Park, Atlantic Greenway Trail) and West Palm Drive (South Dade Trail, Florida City)
Applicant:
Miami-Dade County Parks, Recreation and Open Spaces Department and Department of Transportation and Public Works (for the County); Florida Department of Transportation (FDOT)

MOU WITH FDOT FOR COUNTER SYSTEMS ON COUNTY OWNED TRAILS

Miami-Dade County Board of County Commissioners is considering a resolution to ratify a Memorandum of Agreement (MOA) with the Florida Department of Transportation (FDOT) for the installation and maintenance of two counter systems on county-owned trails within the Florida Shared-Use Nonmotorized (SUN) Trail Network. FDOT will fund and maintain the hardware, while the County's role is to approve installation locations and coordinate scheduling. The resolution also delegates authority to the County Mayor or designee to enter into future similar agreements with FDOT for additional counter systems, provided they have no negative fiscal impact on the County. The MOA term is from September 24, 2025, to September 23, 2026. The Transportation Committee forwarded the item with a favorable recommendation. No public comment is stated.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Before the Board (Transportation Committee forwarded with favorable recommendation)
Address:
10800 Collins Avenue (Atlantic Greenway Trail, Haulover Park) and West Palm Drive (South Dade Trail, Florida City)
Applicant:
Miami-Dade County (Parks, Recreation and Open Spaces Department and Department of Transportation and Public Works) and Florida Department of Transportation (FDOT)

MOU WITH FDOT FOR COUNTER SYSTEMS ON COUNTY OWNED TRAILS

Miami-Dade County Board of County Commissioners (BCC) is considering a resolution to ratify a Memorandum of Agreement (MOA) with the Florida Department of Transportation (FDOT) for the installation and maintenance of two counter systems on county-owned trails within the Florida Shared-Use Nonmotorized (SUN) Trail Network. FDOT will fund and maintain the hardware, while the County's role is limited to approving locations and coordinating schedules. The MOA has a term of less than one year, from September 24, 2025, to September 23, 2026. The resolution also delegates authority to the County Mayor or designee to enter into future similar agreements with FDOT, provided they have no negative fiscal impact on the County. The Transportation Committee forwarded the item to the BCC with a favorable recommendation. The item was introduced on 6/30/2026 and is scheduled for an agenda date of 9/1/2026.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Transportation Committee; Pending BCC Assignment
Address:
10800 Collins Avenue (Atlantic Greenway Trail, within Haulover Park) and West Palm Drive (South Dade Trail, within Florida City)
Applicant:
Miami-Dade County Parks, Recreation and Open Spaces Department and Florida Department of Transportation

OFF-SYSTEM AGREEMENT FOR LOCAL ROADWAY IMPROVEMENTS

Miami-Dade County Board of County Commissioners is considering an Off-System Construction and Maintenance Agreement with the Florida Department of Transportation (FDOT) for roadway improvements on SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road. The project, which includes work on NW 74th Street Connector and NW 72nd Avenue, involves reconstruction of sidewalks, curb ramps, curb and gutter, milling and resurfacing, widening, striping, a traffic separator, loops, and signage. The estimated cost is $5,900,000, funded and built by FDOT, with an anticipated construction start date of March 2027. Miami-Dade County will be responsible for maintenance operations upon project completion.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Transportation Committee; pending Board of County Commissioners approval
Address:
SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, including work on NW 74th Street Connector and NW 72nd Avenue
Applicant:
Florida Department of Transportation (FDOT) and Miami-Dade County

OFF-SYSTEM AGREEMENT FOR LOCAL ROADWAY IMPROVEMENTS

Miami-Dade County Board of County Commissioners is considering an Off-System Construction and Maintenance Agreement with the Florida Department of Transportation (FDOT) for local roadway improvements on SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road. The project includes work on NW 74th Street Connector and NW 72nd Avenue. Specific improvements include reconstruction of sidewalks, curb ramps, curb and gutter, milling and resurfacing, widening, striping, traffic separators, loops, and signage. The project is estimated to cost $5,900,000 and will be funded and built by FDOT, with an anticipated construction start date of March 2027. Miami-Dade County will be responsible for maintenance operations upon completion. The Transportation Committee forwarded the item to the Board with a favorable recommendation.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Transportation Committee; pending BCC Assignment
Address:
SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, including work on NW 74th Street Connector and NW 72nd Avenue
Applicant:
Florida Department of Transportation and Miami-Dade County

OFF-SYSTEM AGREEMENT FOR LOCAL ROADWAY IMPROVEMENTS

Miami-Dade County is approving an Off-System Construction and Maintenance Agreement with the Florida Department of Transportation (FDOT) for roadway improvements along SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road. The project includes work on NW 74th Street Connector and NW 72nd Avenue. Specific improvements include reconstruction of sidewalks, curb ramps, curb and gutter, milling and resurfacing, widening, striping, traffic separators, loops, and signage. The project is estimated to cost $5,900,000 and will be funded and built by FDOT, with an anticipated construction start date of March 2027. Miami-Dade County will be responsible for maintenance operations upon project completion.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Approved (Resolution)
Address:
SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, including work on NW 74th Street Connector and NW 72nd Avenue
Applicant:
Miami-Dade County and Florida Department of Transportation

OFF-SYSTEM AGREEMENT FOR LOCAL ROADWAY IMPROVEMENTS

Resolution approving an Off-System Construction and Maintenance Agreement between Miami-Dade County and the Florida Department of Transportation for local roadway improvements for SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, with a portion of the project including work on NW 74th Street Connector and NW 72nd Avenue. The project is estimated to cost $5,900,000, funded and built by FDOT, with an anticipated construction start date of March 2027. The Transportation Committee forwarded it to the BCC with a favorable recommendation on 7/14/2026, and the BCC agenda date is 9/1/2026. The County is required to provide maintenance operations within the County's right-of-way upon completion. Improvements include curb ramps, sidewalk, curb and gutter, milling and resurfacing, widening, striping, traffic separator, loops, and signage. If additional right-of-way is required, FDOT shall acquire it at no cost to the County.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Transportation Cmte on 7/14/2026; pending BCC assignment
Address:
SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road; a portion includes work on NW 74th Street Connector and NW 72nd Avenue
Applicant:
Miami-Dade County and Florida Department of Transportation

OFF-SYSTEM AGREEMENT FOR LOCAL ROADWAY IMPROVEMENTS

Resolution approving an Off-System Construction and Maintenance Agreement between Miami-Dade County and the Florida Department of Transportation for local roadway improvements for SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, with a portion of the project including work on NW 74th Street Connector and NW 72nd Avenue. The project is estimated to cost $5,900,000, funded and built by FDOT, with an anticipated construction start date of March 2027. The Transportation Committee forwarded it to the BCC with a favorable recommendation on 7/14/2026. The agenda date is 9/1/2026. The County is required to provide maintenance operations within the County's right-of-way upon completion. Improvements include curb ramps, sidewalk, curb and gutter, milling and resurfacing, widening, striping, traffic separator, loops, and signage. The project is in Districts 6 and 12. The person responsible for monitoring is Maria D. Molina P.E., Chief, Right-of-Way and Stormwater Planning and Design Division. The item has 21 pages. No public comment sentiment is stated.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Transportation Committee on 7/14/2026; pending BCC assignment
Address:
SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road; a portion includes work on NW 74th Street Connector and NW 72nd Avenue
Applicant:
Miami-Dade County and Florida Department of Transportation

OFF-SYSTEM AGREEMENT FOR LOCAL ROADWAY IMPROVEMENTS

Miami-Dade County Board of County Commissioners is approving an Off-System Construction and Maintenance Agreement with the Florida Department of Transportation (FDOT) for local roadway improvements on SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road. The project includes work on NW 74th Street Connector and NW 72nd Avenue. Specific improvements include reconstruction of sidewalks, curb ramps, curb and gutter, milling and resurfacing, widening, striping, traffic separators, loops, and signage. The project is estimated to cost $5,900,000 and will be funded and built by FDOT, with an anticipated construction start date of March 2027. Miami-Dade County will be responsible for maintenance operations upon project completion.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Approved (Resolution)
Address:
SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, including work on NW 74th Street Connector and NW 72nd Avenue
Applicant:
Florida Department of Transportation (FDOT) and Miami-Dade County

OFF-SYSTEM AGREEMENT FOR LOCAL ROADWAY IMPROVEMENTS

Miami-Dade County Board of County Commissioners is considering an Off-System Construction and Maintenance Agreement with the Florida Department of Transportation (FDOT) for local roadway improvements along SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road. The project includes work on NW 74th Street Connector and NW 72nd Avenue. Specific improvements include reconstruction of sidewalks, curb ramps, curb and gutter, milling and resurfacing, widening, striping, traffic separators, loops, and signage. The project is estimated to cost $5,900,000 and will be funded and built by FDOT. The anticipated construction start date is March 2027. The Transportation Committee forwarded the item to the Board with a favorable recommendation.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation (Transportation Committee)
Address:
SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, including work on NW 74th Street Connector and NW 72nd Avenue
Applicant:
Miami-Dade County and Florida Department of Transportation (FDOT)

OFF-SYSTEM AGREEMENT FOR LOCAL ROADWAY IMPROVEMENTS

Resolution approving an Off-System Construction and Maintenance Agreement between Miami-Dade County and the Florida Department of Transportation for local roadway improvements for SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, with a portion of the project including work on NW 74th Street Connector and NW 72nd Avenue. The project is estimated to cost $5,900,000, funded and built by FDOT, with an anticipated construction start date of March 2027. The Transportation Committee forwarded it to the BCC with a favorable recommendation on 7/14/2026, and the agenda date is 9/1/2026. The County is required to provide maintenance operations within the County's right-of-way upon completion. Specific improvements include curb ramps, sidewalk, curb and gutter, milling and resurfacing, widening, striping, traffic separator, loops, and signage. The project is in Districts 6 and 12.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Transportation Committee on 7/14/2026; pending BCC assignment; agenda date 9/1/2026
Address:
SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road; a portion includes work on NW 74th Street Connector and NW 72nd Avenue
Applicant:
Miami-Dade County and Florida Department of Transportation

Mira los negocios reales detrás de estos números

Obtén los registros reales, con direcciones y directivos, gratis por 7 días. Sin tarjeta de crédito.

Comienza tu prueba gratis