Browse Miami-Dade County civic records
Every published record for Miami-Dade County, newest first. Filter by board, year, or industry to jump straight to the records you want, and page through to reach the full archive.
22,778 records
CONTRACT AWARD TO GENERAL ASPHALT CO. LLC
Resolution approving a contract award to General Asphalt Co., LLC for the Miami Executive Airport (TMB) Taxiway C East Extension Project No. W125A, in an amount not to exceed $27,202,351.18. The project includes extending and reconfiguring Taxiway C, constructing new Taxiway D, developing a new service road, and installing a 25,000-gallon Oil-Water Separator. The contract term is 850 consecutive calendar days. The Aviation and Seaport Committee forwarded it to the Board of County Commissioners with a favorable recommendation on 7/13/2026. The Board agenda date is 9/1/2026. The project is located at Miami Executive Airport (TMB), within District 11. The base bid was $24,667,740.81, with a 10% contingency of $2,466,774.08 and an Inspector's General Fee of $67,836.29. Funding sources are Future Financing ($21,902,548.18), Federal Aviation Administration ($3,299,803.00), and FDOT Funds ($2,000,000.00). The project was advertised on February 3, 2026, and closed on April 13, 2026, with seven bids received. The Engineer of Record, HDR Engineering, Inc., confirmed the low bidder qualifies for award. The project manager is Richard Cabrera. The company principal is Jose A. Bolanos, and the company location is 4850 NW 72 Avenue, Miami, FL 33166. The document does not state any public comment or stakeholder sentiment.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation by the Aviation and Seaport Committee on 7/13/2026; pending BCC assignment with agenda date 9/1/2026
- Address:
- Miami Executive Airport (TMB); not stated
- Applicant:
- Miami-Dade Aviation Department (MDAD); Contractor: General Asphalt Co., LLC
CONTRACT AWARD TO GENERAL ASPHALT CO. LLC
Miami-Dade County Board of County Commissioners is approving a contract award to General Asphalt Co., LLC for the Miami Executive Airport (TMB) Taxiway C East Extension Project (Project No. W125A). The project involves extending and reconfiguring Taxiway C, constructing a new Taxiway D, developing a new service road, and installing a 25,000-gallon Oil-Water Separator. The contract amount is not to exceed $27,202,351.18, with a contract period of 850 consecutive calendar days. The project is part of the County's M.I.A. Plan to enhance general aviation facilities. The Aviation and Seaport Committee forwarded the item to the BCC with a favorable recommendation. No public comment is stated in the document.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Approved (Resolution)
- Address:
- Miami Executive Airport (TMB)
- Applicant:
- General Asphalt Co., LLC
CONTRACT AWARD TO GENERAL ASPHALT CO. LLC
Resolution approving a contract award to General Asphalt Co., LLC for the Miami Executive Airport (TMB) Taxiway C East Extension Project No. W125A, in an amount not to exceed $27,202,351.18. The project includes extending and reconfiguring Taxiway C, constructing new Taxiway D, developing a new service road, and installing a 25,000-gallon Oil-Water Separator. The contract term is 850 consecutive calendar days. The item was forwarded to the Board of County Commissioners with a favorable recommendation by the Aviation and Seaport Committee on 7/13/2026, and is scheduled for the BCC agenda on 9/1/2026. The project is located at Miami Executive Airport (TMB), within District 11, represented by Commissioner Roberto J. Gonzalez, who is also the Prime Sponsor. The contract was advertised on February 3, 2026, and closed on April 13, 2026, with seven bids received. The base bid was $24,667,740.81, below the base engineer's estimate of $24,988,485.00. Funding sources include Future Financing ($21,902,548.18, 81%), Federal Aviation Administration ($3,299,803.00, 12%), and FDOT Funds ($2,000,000.00, 7%). The project is subject to Davis Bacon Wages. The document does not state any public comment or stakeholder sentiment.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation by the Aviation and Seaport Committee on 7/13/2026; pending BCC assignment with agenda date 9/1/2026
- Address:
- Miami Executive Airport (TMB), not stated
- Applicant:
- Miami-Dade Aviation Department (MDAD); Contractor: General Asphalt Co., LLC
CONTRACT AWARD TO GENERAL ASPHALT CO. LLC
Miami-Dade County Board of County Commissioners is approving a contract award to General Asphalt Co., LLC for the Miami Executive Airport (TMB) Taxiway C East Extension Project (Project No. W125A). The project involves extending and reconfiguring Taxiway C, constructing a new Taxiway D, developing a new service road, and installing a 25,000-gallon Oil-Water Separator. The contract amount is not to exceed $27,202,351.18, with a contract period of 850 consecutive calendar days. The Aviation Department is the requester, and the project is part of the county's broader airport modernization plan to enhance general aviation facilities and economic growth. The project was forwarded to the BCC with a favorable recommendation from the Aviation and Seaport Committee. Public comment is not stated in this document.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Approved (Resolution)
- Address:
- Miami Executive Airport (TMB)
- Applicant:
- General Asphalt Co., LLC
CONTRACT AWARD TO GENERAL ASPHALT CO. LLC
Miami-Dade County Board of County Commissioners is approving a contract award to General Asphalt Co., LLC for the Miami Executive Airport (TMB) Taxiway C East Extension Project (Project No. W125A). The project involves extending and reconfiguring Taxiway C, constructing a new Taxiway D, developing a new service road, and installing a 25,000-gallon Oil-Water Separator. The contract amount is not to exceed $27,202,351.18, with a contract period of 850 consecutive calendar days. The project aims to enhance airfield capacity, improve operational efficiency, and ensure environmental compliance. The Aviation and Seaport Committee forwarded the item to the BCC with a favorable recommendation. No public comment is stated in the document.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Approved (Resolution)
- Address:
- Miami Executive Airport (TMB)
- Applicant:
- General Asphalt Co., LLC
CONTRACT AWARD TO GENERAL ASPHALT CO. LLC
Miami-Dade County is approving a contract award to General Asphalt Co. LLC for the Miami Executive Airport (TMB) Taxiway C East Extension Project (W125A). The project involves extending and reconfiguring Taxiway C, constructing a new Taxiway D, developing a new service road, and installing a 25,000-gallon Oil-Water Separator. The total contract amount is not to exceed $27,202,351.18, with a contract period of 850 consecutive calendar days. The Aviation Department is the requester. The Aviation and Seaport Committee forwarded the item to the Board of County Commissioners (BCC) with a favorable recommendation. The project is funded by Future Financing (81%), Federal Aviation Administration (12%), and FDOT Funds (7%). Davis Bacon Wages are applicable. The project is subject to the County’s ‘Green Procurement Guidelines’ and has considered sea level rise. The Buy American Iron and Steel Procurement Program is applicable. General Asphalt Co. LLC has a track record of satisfactory performance and has been awarded multiple contracts previously. No public comment is stated in the document.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Approved (Resolution)
- Address:
- Miami Executive Airport (TMB)
- Applicant:
- General Asphalt Co. LLC
CONTRACT AWARD TO GENERAL ASPHALT CO. LLC
Resolution approving a contract award to General Asphalt Co., LLC for the Miami Executive Airport (TMB) Taxiway C East Extension Project No. W125A, in an amount not to exceed $27,202,351.18. The project involves extending and reconfiguring Taxiway C, constructing new Taxiway D, developing a new service road, and installing a 25,000-gallon Oil-Water Separator. The contract term is 850 consecutive calendar days. The Aviation and Seaport Committee forwarded it to the Board of County Commissioners with a favorable recommendation on 7/13/2026. The agenda date is 9/1/2026. The project is located at Miami Executive Airport (TMB), within District 11. The base bid was $24,667,740.81, with a 10% contingency of $2,466,774.08 and an Inspector's General Fee of $67,836.29. Funding sources include Future Financing ($21,902,548.18), Federal Aviation Administration ($3,299,803.00), and FDOT Funds ($2,000,000.00). The project was advertised on February 3, 2026, and closed on April 13, 2026, with seven bids received. The Engineer of Record, HDR Engineering, Inc., confirmed the low bidder qualifies for award. The project manager is Richard Cabrera. The company principal is Jose A. Bolanos, and the company location is 4850 NW 72 Avenue, Miami, FL 33166. The document does not state any public comment or stakeholder sentiment.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation by the Aviation and Seaport Committee on 7/13/2026; pending BCC assignment, agenda date 9/1/2026
- Address:
- Miami Executive Airport (TMB), not stated
- Applicant:
- Miami-Dade County Aviation Department (MDAD); Contractor: General Asphalt Co., LLC
CONTRACT AWARD TO GENERAL ASPHALT CO. LLC
Miami-Dade County Board of County Commissioners is approving a contract award to General Asphalt Co., LLC for the Miami Executive Airport (TMB) Taxiway C East Extension Project (Project No. W125A). The project involves extending and reconfiguring Taxiway C, constructing a new Taxiway D, developing a new service road, and installing a 25,000-gallon Oil-Water Separator. The contract amount is not to exceed $27,202,351.18, with a contract period of 850 consecutive calendar days. The project aims to enhance airfield capacity, improve operational efficiency, and ensure environmental compliance. The Aviation and Seaport Committee forwarded the item to the BCC with a favorable recommendation. No public comment is stated in the document.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Approved (Resolution)
- Address:
- Miami Executive Airport (TMB)
- Applicant:
- General Asphalt Co., LLC
CONTRACT AWARD TO GENERAL ASPHALT CO. LLC
Resolution approving a contract award to General Asphalt Co., LLC for the Miami Executive Airport (TMB) Taxiway C East Extension Project No. W125A, in an amount not to exceed $27,202,351.18. The project includes extending and reconfiguring Taxiway C, constructing a new Taxiway D, developing a new service road, and installing a 25,000-gallon Oil-Water Separator. The contract term is 850 consecutive calendar days. The item was forwarded to the Board of County Commissioners with a favorable recommendation from the Aviation and Seaport Committee on 7/13/2026, and is scheduled for the BCC agenda on 9/1/2026. The project is located at Miami Executive Airport (TMB), within District 11, and the impact is countywide. The base bid was $24,667,740.81, with a 10% contingency of $2,466,774.08 and an Inspector's General Fee of $67,836.29. Funding sources include Future Financing ($21,902,548.18), Federal Aviation Administration ($3,299,803.00), and FDOT Funds ($2,000,000.00). The project was advertised on February 3, 2026, and closed on April 13, 2026, with seven bids received. The Engineer of Record, HDR Engineering, Inc., confirmed the recommended low bidder qualifies for award. The project manager is Richard Cabrera. The company principal is Jose A. Bolanos, and the company location is 4850 NW 72 Avenue, Miami, FL 33166. The document does not state any public comment or stakeholder sentiment.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation (from Aviation and Seaport Committee on 7/13/2026); Pending BCC assignment; Agenda Date: 9/1/2026
- Address:
- Miami Executive Airport (TMB)
- Applicant:
- Miami-Dade Aviation Department (MDAD); Contractor: General Asphalt Co., LLC
CONTRACT AWARD TO GENERAL ASPHALT CO. LLC
Resolution approving a contract award to General Asphalt Co., LLC for the Miami Executive Airport (TMB) Taxiway C East Extension Project No. W125A, in an amount not to exceed $27,202,351.18. The project involves extending and reconfiguring Taxiway C, constructing a new Taxiway D, developing a new service road, and installing a 25,000-gallon Oil-Water Separator. The contract term is 850 consecutive calendar days. The item was forwarded to the Board of County Commissioners with a favorable recommendation by the Aviation and Seaport Committee on 7/13/2026, with the agenda date of 9/1/2026. The project is located at Miami Executive Airport (TMB), within District 11, represented by Commissioner Roberto J. Gonzalez, who is also the Prime Sponsor. The base bid was $24,667,740.81, with a 10% contingency of $2,466,774.08 and an Inspector's General Fee of $67,836.29. Funding sources include Future Financing ($21,902,548.18), Federal Aviation Administration ($3,299,803.00), and FDOT Funds ($2,000,000.00). The project was advertised on February 3, 2026, and closed on April 13, 2026, with seven bids received. The Engineer of Record, HDR Engineering, Inc., confirmed the recommended low bidder qualifies for award. The project will be executed in six primary phases. The project is subject to Davis Bacon Wages and the Buy American Iron and Steel Procurement Program. The annualized cost of operations is $249,884.85, and the annualized cost of routine maintenance is $82,462.00. The life expectancy of the asset is 25 years. The project manager is Richard Cabrera. The company principal is Jose A. Bolanos, and the company location is 4850 NW 72 Avenue, Miami, FL 33166. The company has been in business for 60 years. The document does not state any public comment or stakeholder sentiment.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation by the Aviation and Seaport Committee on 7/13/2026; pending before the Board of County Commissioners with an agenda date of 9/1/2026
- Address:
- Miami Executive Airport (TMB), not stated
- Applicant:
- Miami-Dade County Aviation Department (MDAD), contractor General Asphalt Co., LLC
CONTRACT AWARD TO GENERAL ASPHALT CO. LLC
Resolution approving a contract award for the Miami Executive Airport (TMB) Taxiway C East Extension Project No. W125A to General Asphalt Co., LLC in an amount not to exceed $27,202,351.18. The project includes extending and reconfiguring Taxiway C, constructing new Taxiway D, developing a new service road, and installing a 25,000-gallon Oil-Water Separator. The contract term is 850 consecutive calendar days. The item was forwarded to the Board of County Commissioners with a favorable recommendation by the Aviation and Seaport Committee on 7/13/2026 and is scheduled for the BCC agenda on 9/1/2026. The project is located at Miami Executive Airport (TMB) in District 11. The base bid was $24,667,740.81, with a 10% contingency of $2,466,774.08 and an Inspector's General Fee of $67,836.29. Funding sources include Future Financing ($21,902,548.18), Federal Aviation Administration ($3,299,803.00), and FDOT Funds ($2,000,000.00). The project was advertised on February 3, 2026, and closed on April 13, 2026, with seven bids received. The Engineer of Record, HDR Engineering, Inc., confirmed the low bidder qualifies for award. The project is subject to Davis-Bacon Wages. The project manager is Richard Cabrera. The company principal is Jose A. Bolanos, located at 4850 NW 72 Avenue, Miami, FL 33166. The document does not state any public comment or stakeholder sentiment.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation by the Aviation and Seaport Committee on 7/13/2026; pending BCC assignment for agenda date 9/1/2026
- Address:
- Miami Executive Airport (TMB), not stated
- Applicant:
- Miami-Dade Aviation Department (MDAD), Requester; General Asphalt Co., LLC, Contractor
CONTRACT AWARD TO GENERAL ASPHALT CO. LLC
Miami-Dade County Board of County Commissioners (BCC) is set to approve a contract award for the Miami Executive Airport (TMB) Taxiway C East Extension Project (W125A) to General Asphalt Co., LLC. The project involves extending and reconfiguring Taxiway C, constructing a new Taxiway D, developing a new service road, and installing an oil-water separator. The total contract amount is not to exceed $27,202,351.18, with a contract period of 850 consecutive calendar days. The Aviation Department is the requester, and the project is funded by Future Financing (81%), FAA (12%), and FDOT Funds (7%). The Aviation and Seaport Committee forwarded the item to the BCC with a favorable recommendation. No public comment is stated in the document.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation (Aviation and Seaport Committee); Pending BCC Assignment (Board of County Commissioners)
- Address:
- Miami Executive Airport (TMB)
- Applicant:
- General Asphalt Co., LLC
CONTRACT AWARD TO GENERAL ASPHALT CO. LLC
Resolution approving a contract between Miami-Dade County and General Asphalt Co., LLC for the Miami Executive Airport (TMB) Taxiway C East Extension Project No. W125A, in an amount not to exceed $27,202,351.18. The project will extend and reconfigure Taxiway C, construct a new Taxiway D, develop a new service road, and install a 25,000-gallon Oil-Water Separator. The contract term is 850 consecutive calendar days. The item was introduced on 6/23/2026, forwarded to the Board of County Commissioners with a favorable recommendation by the Aviation and Seaport Committee on 7/13/2026, and is scheduled for the Board agenda on 9/1/2026. The project is located at TMB, within District 11, represented by Commissioner Roberto J. Gonzalez, who is the Prime Sponsor. The project is part of the County's M.I.A. Plan and is funded by Future Financing ($21,902,548.18), Federal Aviation Administration ($3,299,803.00), and FDOT Funds ($2,000,000.00). The base award amount is $24,667,740.81, with a 10 percent contingency of $2,466,774.08 and an Inspector's General Fee of $67,836.29. The project was advertised on February 3, 2026, and closed on April 13, 2026, with seven bids received. The Engineer of Record, HDR Engineering Inc., confirmed the low bidder qualifies for award. The project manager is Richard Cabrera. The company principal is Jose A. Bolanos, and the company location is 4850 NW 72 Avenue, Miami, FL 33166. The document does not state any public comment or stakeholder sentiment.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation
- Applicant:
- General Asphalt Co., LLC
CONTRACT AWARD TO GENERAL ASPHALT CO. LLC
Miami-Dade County Board of County Commissioners is approving a contract award to General Asphalt Co., LLC for the Miami Executive Airport (TMB) Taxiway C East Extension Project (Project No. W125A). The project involves extending and reconfiguring Taxiway C, constructing a new Taxiway D, developing a new service road, and installing a 25,000-gallon Oil-Water Separator. The contract amount is not to exceed $27,202,351.18, with a contract period of 850 consecutive calendar days. The Aviation and Seaport Committee forwarded this item to the BCC with a favorable recommendation. No public comment is stated in the document.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Approved (Resolution)
- Address:
- Miami Executive Airport (TMB)
- Applicant:
- General Asphalt Co., LLC
CONTRACT AWARD TO GENERAL ASPHALT CO. LLC
Miami-Dade County Board of County Commissioners is approving a contract award to General Asphalt Co., LLC for the Miami Executive Airport (TMB) Taxiway C East Extension Project (W125A). The project involves extending and reconfiguring Taxiway C, constructing a new Taxiway D, developing a new service road, and installing a 25,000-gallon Oil-Water Separator. The contract amount is not to exceed $27,202,351.18, with a contract period of 850 consecutive calendar days. The project is part of Miami-Dade County's plan to enhance general aviation facilities and airport capacity. The Aviation and Seaport Committee forwarded the item to the BCC with a favorable recommendation. No public comment is stated in the document.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Approved (Resolution)
- Address:
- Miami Executive Airport (TMB)
- Applicant:
- General Asphalt Co., LLC
CONTRACT AWARD TO GENERAL ASPHALT CO. LLC
Miami-Dade County is approving a contract award to General Asphalt Co. LLC for the Miami Executive Airport (TMB) Taxiway C East Extension Project (W125A). The project involves extending and reconfiguring Taxiway C, constructing a new Taxiway D, developing a new service road, and installing a 25,000-gallon Oil-Water Separator. The total contract amount is not to exceed $27,202,351.18, with a contract period of 850 consecutive calendar days. The Aviation Department is procuring these construction services to enhance airfield capacity, operational efficiency, and ensure environmental compliance. The project is funded through a combination of Future Financing, Federal Aviation Administration funds, and FDOT funds. The Aviation and Seaport Committee forwarded the item to the Board of County Commissioners with a favorable recommendation.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Approved (Resolution)
- Address:
- Miami Executive Airport (TMB)
- Applicant:
- General Asphalt Co. LLC
CONTRACT AWARD TO GENERAL ASPHALT CO. LLC
Resolution approving a contract award to General Asphalt Co., LLC for the Miami Executive Airport (TMB) Taxiway C East Extension Project No. W125A, in an amount not to exceed $27,202,351.18. The project involves extending and reconfiguring Taxiway C, constructing a new Taxiway D, developing a new service road, and installing a 25,000-gallon Oil-Water Separator. The contract term is 850 consecutive calendar days. The item was forwarded to the Board of County Commissioners with a favorable recommendation by the Aviation and Seaport Committee on 7/13/2026, and is scheduled for the BCC agenda on 9/1/2026 as item 8A1. The project is located at Miami Executive Airport (TMB), within District 11. The base bid was $24,667,740.81, with a 10% contingency of $2,466,774.08 and an Inspector's General Fee of $67,836.29. Funding sources include Future Financing ($21,902,548.18), Federal Aviation Administration ($3,299,803.00), and FDOT Funds ($2,000,000.00). The project was advertised on February 3, 2026, and closed on April 13, 2026, with seven bids received. The Engineer of Record, HDR Engineering, Inc., confirmed the recommended low bidder qualifies for award. The project manager is Richard Cabrera. The company principal is Jose A. Bolanos, and the company location is 4850 NW 72 Avenue, Miami, FL 33166. The project is subject to Davis Bacon Wages. The document does not state any public comment or stakeholder sentiment.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation by the Aviation and Seaport Committee on 7/13/2026; pending before the Board of County Commissioners as of the document date
- Address:
- Miami Executive Airport (TMB); company location for General Asphalt Co., LLC: 4850 NW 72 Avenue, Miami, FL 33166
- Applicant:
- Miami-Dade Aviation Department (MDAD); contractor: General Asphalt Co., LLC
CONTRACT AWARD TO GENERAL ASPHALT CO. LLC
Resolution approving a contract award to General Asphalt Co., LLC for the Miami Executive Airport (TMB) Taxiway C East Extension Project No. W125A, in an amount not to exceed $27,202,351.18. The project involves extending and reconfiguring Taxiway C, constructing new Taxiway D, developing a new service road, and installing a 25,000-gallon Oil-Water Separator. The contract term is 850 consecutive calendar days. The item was forwarded to the Board of County Commissioners with a favorable recommendation by the Aviation and Seaport Committee on 7/13/2026, and is scheduled for the BCC agenda on 9/1/2026. The project is located at Miami Executive Airport (TMB), within District 11, represented by Commissioner Roberto J. Gonzalez, who is also the Prime Sponsor. The base bid was $24,667,740.81, with a 10% contingency of $2,466,774.08 and an Inspector's General Fee of $67,836.29. Funding sources include Future Financing ($21,902,548.18, 81%), Federal Aviation Administration ($3,299,803.00, 12%), and FDOT Funds ($2,000,000.00, 7%). The project was advertised on February 3, 2026, and closed on April 13, 2026, with seven bids received. The Engineer of Record, HDR Engineering, Inc., confirmed the low bidder qualifies for award. The project manager is Richard Cabrera. The company principal is Jose A. Bolanos, and the company location is 4850 NW 72 Avenue, Miami, FL 33166. The document does not state any public comment or stakeholder sentiment.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation by the Aviation and Seaport Committee on 7/13/2026; pending BCC approval on 9/1/2026
- Address:
- Miami Executive Airport (TMB), not stated
- Applicant:
- Miami-Dade Aviation Department (MDAD); Contractor: General Asphalt Co., LLC
CONTRACT AWARD TO GENERAL ASPHALT CO. LLC
Miami-Dade County is approving a contract award for the Miami Executive Airport Taxiway C East Extension Project (W125A) to General Asphalt Co., LLC. The project involves extending and reconfiguring Taxiway C, constructing a new Taxiway D, developing a new service road, and installing a 25,000-gallon Oil-Water Separator. The total contract amount is not to exceed $27,202,351.18, with a contract period of 850 consecutive calendar days. The project aims to enhance airfield capacity, improve operational efficiency, and ensure environmental compliance. The contract was introduced on 6/23/2026 and is scheduled for an Agenda Date of 9/1/2026. Public comment is not stated in this document.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- In Committee
- Address:
- Miami Executive Airport (TMB)
- Applicant:
- General Asphalt Co., LLC
CONTRACT AWARD TO GENERAL ASPHALT CO. LLC
Resolution approving a contract award to General Asphalt Co., LLC for the Miami Executive Airport (TMB) Taxiway C East Extension Project No. W125A, in an amount not to exceed $27,202,351.18. The project involves extending and reconfiguring Taxiway C, constructing new Taxiway D, developing a new service road, and installing a 25,000-gallon Oil-Water Separator. The contract term is 850 consecutive calendar days. The item was forwarded to the Board of County Commissioners with a favorable recommendation from the Aviation and Seaport Committee on 7/13/2026, and is scheduled for the BCC agenda on 9/1/2026. The project is located at Miami Executive Airport (TMB), within District 11, represented by Commissioner Roberto J. Gonzalez, who is also the Prime Sponsor. The base bid was $24,667,740.81, with a 10% contingency of $2,466,774.08 and an Inspector's General Fee of $67,836.29. Funding sources include Future Financing ($21,902,548.18, 81%), Federal Aviation Administration ($3,299,803.00, 12%), and FDOT Funds ($2,000,000.00, 7%). The project was advertised on February 3, 2026, and closed on April 13, 2026, with seven bids received. The Engineer of Record, HDR Engineering, Inc., confirmed the low bidder qualifies for award. The project manager is Richard Cabrera. The company principal is Jose A. Bolanos, and the company location is 4850 NW 72 Avenue, Miami, FL 33166. The document does not state a specific street address, parcel, or folio for the project site, nor does it state the project acreage or square footage. The document does not state any public comment or stakeholder sentiment.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation (from Aviation and Seaport Committee on 7/13/2026); pending BCC approval on 9/1/2026
- Applicant:
- General Asphalt Co., LLC
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, gratis por 7 días. Sin tarjeta de crédito.
Comienza tu prueba gratis