Browse Miami-Dade County civic records
Every published record for Miami-Dade County, newest first. Filter by board, year, or industry to jump straight to the records you want, and page through to reach the full archive.
15,165 records
GRANT APPLICATION IN AN AMOUNT UP TO $100,547,040.00
Miami-Dade County is seeking to ratify the submission of a grant application and authorize the execution of a grant agreement for the Venetian Causeway Bridge Replacement Project. The project aims to replace 11 bridges, originally built in 1926, with newer, more resilient infrastructure designed to last 50 years. The project will improve safety, meet updated design codes, enhance bicycle and pedestrian facilities, and address deterioration due to age and marine environment. The total estimated project construction cost is $201,094,080, with a federal grant of up to $100,547,040 from the USDOT Federal Highway Administration's Bridge Investment Program. The county will provide a local match of at least $50,273,520, and the Florida Department of Transportation will contribute up to $50,273,520.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Resolution ratifying actions and authorizing execution of grant agreement
- Address:
- Venetian Causeway
- Applicant:
- Miami-Dade County Transportation and Public Works
GRANT APPLICATION IN AN AMOUNT UP TO $100,547,040.00
Miami-Dade County is seeking to ratify the submission of a grant application and authorize the execution of a grant agreement for the Venetian Causeway Bridge Replacement Project. The project involves replacing 11 bridges, originally built in 1926, with newer, more resilient infrastructure. The total estimated project construction cost is $201,094,080. The grant application is for up to $100,547,040 from the U.S. Department of Transportation Federal Highway Administration under the Bridge Investment Program, Large Bridge Project category. A local match of at least $50,273,520 is required, with Florida Department of Transportation potentially contributing up to $50,273,520. The project aims to increase safety and resiliency, maintain aesthetics, and enhance bicycle and pedestrian facilities. The bridges, located on the Venetian Causeway connecting mainland Miami to Miami Beach, exhibit severe deterioration and do not meet current design standards.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Resolution ratifying actions and authorizing execution of grant agreement
- Address:
- Venetian Causeway
- Applicant:
- Miami-Dade County (Transportation and Public Works)
GRANT APPLICATION IN AN AMOUNT UP TO $100,547,040.00
Miami-Dade County Board of County Commissioners is considering a resolution to ratify the submission of a grant application and authorize the execution of a grant agreement with the U.S. Department of Transportation Federal Highway Administration (FHWA) for the Venetian Causeway Bridge Replacement Project. The grant application is for an amount up to $100,547,040.00 under the Bridge Investment Program, Large Bridge Project category. The project involves replacing 11 bridges on the Venetian Causeway, originally built in 1926, with newer, more resilient infrastructure. The total estimated project construction cost is $201,094,080, which includes a required local match of at least $50,273,520 and a Florida Department of Transportation (FDOT) match of up to $50,273,520. The project aims to increase safety and resiliency, maintain aesthetics, and enhance bicycle and pedestrian facilities. The grant funds are pending execution of the grant agreement.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Resolution ratifying actions and authorizing execution of grant agreement
- Address:
- Venetian Causeway
- Applicant:
- Miami-Dade County (Transportation and Public Works)
GREEN TECH CORRIDOR (S-16113)
Miami-Dade County Board of County Commissioners awarded Contract No. S-16113 to All Construction & Plumbing, Inc. for wastewater and water service to commercial properties in the Green Tech Corridor S-1 North. The contract amount is $12,506,147.00 for a period of 627 calendar days. The project involves extending the sanitary sewer system along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including approximately 12,000 linear feet of sewer pipe, manholes, and laterals. It also includes the replacement of approximately 4,000 linear feet of aging water mains, fire hydrants, and reconnections. This project is part of the Connect to Protect initiative to transition properties from septic systems to the County's sanitary sewer system. Funding will come from the Building Better Communities General Obligation Bond Program. The Infrastructure, Innovation & Technology Committee forwarded the item to the Board with a favorable recommendation.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Awarded
- Address:
- N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
- Applicant:
- Water & Sewer Department
GREEN TECH CORRIDOR (S-16113)
Miami-Dade County Board of County Commissioners is awarding Contract No. S-16113 for wastewater and water service to commercial properties in the Green Tech Corridor S-1 North. The contract is awarded to All Construction & Plumbing, Inc. for $12,506,147.00 with a period of 627 calendar days. The project involves extending the sanitary sewer system and replacing aging water mains along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street. This initiative is part of the Connect to Protect initiative to transition properties from septic systems to the county's sanitary sewer system, aiming to improve water quality, public health, and support economic growth. The project is funded in part by the Building Better Communities General Obligation Bond (GOB) Program. The Infrastructure, Innovation & Technology Committee forwarded the item to the BCC with a favorable recommendation.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Awarded
- Address:
- N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
- Applicant:
- Water & Sewer Department (Requester), All Construction & Plumbing, Inc. (Contractor)
GREEN TECH CORRIDOR (S-16113)
Miami-Dade County Board of County Commissioners awarded Contract No. S-16113 for wastewater and water service to commercial properties in the Green Tech Corridor S-1 North. The contract, valued at $12,506,147.00, will be performed by All Construction & Plumbing, Inc. over 627 calendar days. The project involves installing approximately 12,000 linear feet of sanitary sewer gravity pipe, manholes, and laterals, and replacing approximately 4,000 linear feet of aging water mains, including fire hydrants. This initiative aims to transition properties from septic systems to the County's sanitary sewer system as part of the Connect to Protect initiative, supporting economic growth and environmental health. Funding will come from the Building Better Communities General Obligation Bond Program and other WASD funds. The Infrastructure, Innovation & Technology Committee forwarded the item to the Board with a favorable recommendation.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Awarded
- Address:
- N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
- Applicant:
- All Construction & Plumbing, Inc.
GREEN TECH CORRIDOR (S-16113)
Miami-Dade County Board of County Commissioners (BCC) is set to award Contract No. S-16113 for wastewater and water service to commercial properties in the Green Tech Corridor S-1 North. The contract, valued at $12,506,147.00, will be awarded to All Construction & Plumbing, Inc. for a period of 627 calendar days. The project involves extending the sanitary sewer system and replacing aging water mains along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street. This initiative is part of the 'Connect to Protect' program, aiming to transition properties from septic systems to the county's sanitary sewer system, thereby enhancing property values, redevelopment potential, and supporting economic growth. Funding will come from the Building Better Communities General Obligation Bond (GOB) Program and other WASD funds. The Infrastructure, Innovation & Technology Committee forwarded this item to the BCC with a favorable recommendation.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation (Infrastructure, Innovation & Technology Committee); Recommendation to Award Contract (Staff Recommendation)
- Address:
- N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
- Applicant:
- Water & Sewer Department (Requester), All Construction & Plumbing, Inc. (Contractor)
GREEN TECH CORRIDOR (S-16113)
Miami-Dade County Board of County Commissioners awarded Contract No. S-16113 to All Construction & Plumbing, Inc. for wastewater and water service to commercial properties in the Green Tech Corridor S-1 North. The project involves extending sanitary sewer systems and replacing aging water mains along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street. This initiative aims to transition properties from septic systems to the county sewer, enhancing property values, redevelopment potential, and supporting economic growth. The contract duration is 627 calendar days, with a total amount of $12,506,147.00. Funding is provided by the Building Better Communities General Obligation Bond Program and other WASD funds. The Infrastructure, Innovation & Technology Committee forwarded the item with a favorable recommendation.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Awarded
- Address:
- N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
- Applicant:
- All Construction & Plumbing, Inc.
GREEN TECH CORRIDOR (S-16113)
Miami-Dade County Board of County Commissioners awarded Contract No. S-16113 to All Construction & Plumbing, Inc. for wastewater and water service to commercial properties in the Green Tech Corridor S-1 North. The contract amount is $12,506,147.00 for a period of 627 calendar days. The project involves extending the sanitary sewer system and replacing aging water mains along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street. This initiative is part of the Connect to Protect initiative to transition properties from septic systems to the County's sanitary sewer system, aiming to improve water quality and support economic growth. The project is funded in part by the Building Better Communities General Obligation Bond (GOB) Program. The Infrastructure, Innovation & Technology Committee forwarded the item to the Board with a favorable recommendation.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Awarded
- Address:
- N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street
- Applicant:
- All Construction & Plumbing, Inc.
GREEN TECH CORRIDOR (S-16113)
Miami-Dade County Board of County Commissioners awarded Contract No. S-16113 for wastewater and water service to commercial properties in the Green Tech Corridor S-1 North area. The contract, valued at $12,506,147.00, was awarded to All Construction & Plumbing, Inc. for a period of 627 calendar days. The project involves extending the sanitary sewer system and replacing aging water mains along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street. This initiative is part of the Connect to Protect initiative to transition properties from septic systems to the County's sanitary sewer system, aiming to improve water quality and support economic growth. Funding will come from the Building Better Communities General Obligation Bond Program and other WASD funds. The Infrastructure, Innovation & Technology Committee forwarded the item to the Board with a favorable recommendation.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Awarded
- Address:
- N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
- Applicant:
- All Construction & Plumbing, Inc.
GREEN TECH CORRIDOR (S-16113)
Miami-Dade County Board of County Commissioners is awarding Contract No. S-16113 for wastewater and water service to commercial properties in the Green Tech Corridor S-1 North. The contract is awarded to All Construction & Plumbing, Inc. for $12,506,147.00 and a period of 627 calendar days. The project involves installing approximately 12,000 linear feet of sanitary sewer gravity pipe, manholes, and laterals, and replacing approximately 4,000 linear feet of aging water mains, including fire hydrants. This project is part of the Connect to Protect initiative to transition properties from septic systems to the county's sanitary sewer system. The Infrastructure, Innovation & Technology Committee forwarded this item to the BCC with a favorable recommendation. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Awarded
- Address:
- N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
- Applicant:
- Water & Sewer Department
GREEN TECH CORRIDOR (S-16113)
Miami-Dade County Board of County Commissioners is awarding Contract No. S-16113 for wastewater and water service to commercial properties in the Green Tech Corridor S-1 North. The contract is awarded to All Construction & Plumbing, Inc. for $12,506,147.00 with a duration of 627 calendar days. The project involves extending the sanitary sewer system and replacing aging water mains along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street. This initiative is part of the Connect to Protect initiative to transition properties from septic systems to the county's sanitary sewer system, aiming to improve water quality, public health, and support economic growth. Funding will come from the Building Better Communities General Obligation Bond (GOB) Program and other WASD funds. The Infrastructure, Innovation & Technology Committee forwarded the item to the BCC with a favorable recommendation.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Awarded
- Address:
- N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
- Applicant:
- Water & Sewer Department
GREEN TECH CORRIDOR (S-16113)
Miami-Dade County Board of County Commissioners is awarding Contract No. S-16113 for wastewater and water service to commercial properties in the Green Tech Corridor S-1 North. The contract is awarded to All Construction & Plumbing, Inc. for $12,506,147.00 and a period of 627 calendar days. The project involves extending the sanitary sewer system and replacing aging water mains along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street. This initiative is part of the Connect to Protect initiative to transition properties from septic systems to the county's sanitary sewer system, aiming to improve water quality, public health, and support economic growth. The project is funded in part by the Building Better Communities General Obligation Bond (GOB) Program. The Infrastructure, Innovation & Technology Committee forwarded the item to the BCC with a favorable recommendation. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Awarded
- Address:
- N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
- Applicant:
- Water & Sewer Department (Requester), All Construction & Plumbing, Inc. (Contractor)
GREEN TECH CORRIDOR (S-16113)
Miami-Dade County Board of County Commissioners (BCC) is set to award Contract No. S-16113 for wastewater and water service to commercial properties in the Green Tech Corridor S-1 North. The contract, valued at $12,506,147.00, will be awarded to All Construction & Plumbing, Inc. for a period of 627 calendar days. The project involves extending the sanitary sewer system and replacing aging water mains along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street. This initiative is part of the 'Connect to Protect' program, aiming to transition properties from septic systems to the county's sanitary sewer system, enhancing property values, redevelopment potential, and supporting economic growth. Funding will come from the Building Better Communities General Obligation Bond Program and other WASD funds. The Infrastructure, Innovation & Technology Committee forwarded the item to the BCC with a favorable recommendation.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation (Infrastructure, Innovation & Technology Committee); Recommendation to Award Contract (Staff Recommendation)
- Address:
- N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
- Applicant:
- Water & Sewer Department (Requester)
GREEN TECH CORRIDOR (S-16113)
Miami-Dade County Board of County Commissioners awarded Contract No. S-16113 to ALL CONSTRUCTION & PLUMBING, INC. for wastewater and water service to commercial properties in the Green Tech Corridor S-1 North. The project involves extending the sanitary sewer system and replacing aging water mains along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street. This initiative is part of the Connect to Protect initiative to transition properties from septic systems to the County's sanitary sewer system. The contract amount is $12,506,147.00 with a period of 627 calendar days. Funding is from the Building Better Communities General Obligation Bond Program. The Infrastructure, Innovation & Technology Committee forwarded the item to the Board with a favorable recommendation. No public comment or stakeholder sentiment was stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Awarded
- Address:
- N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street
- Applicant:
- ALL CONSTRUCTION & PLUMBING, INC.
GREEN TECH CORRIDOR (S-16113)
Miami-Dade County Board of County Commissioners is awarding Contract No. S-16113 for wastewater and water service to commercial properties in the Green Tech Corridor S-1 North area. The contract is awarded to All Construction & Plumbing, Inc. for $12,506,147.00 with a duration of 627 calendar days. The project involves extending sanitary sewer systems and replacing aging water mains along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street. This initiative aims to transition properties from septic systems to the county sewer, enhancing property values, redevelopment potential, and supporting economic growth. The project is funded in part by the Building Better Communities General Obligation Bond Program. The Infrastructure, Innovation & Technology Committee forwarded this item to the Board with a favorable recommendation.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Awarded
- Address:
- N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
- Applicant:
- Water & Sewer Department (Requester); All Construction & Plumbing, Inc. (Contractor)
GREEN TECH CORRIDOR (S-16113)
Miami-Dade County Board of County Commissioners is awarding Contract No. S-16113 for Wastewater and Water Service to Commercial Properties in the Green Tech Corridor S-1 North. The contract is awarded to All Construction & Plumbing, Inc. for $12,506,147.00 with a period of 627 calendar days. The project involves extending the sanitary sewer system and replacing aging water mains along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street. This initiative aims to transition properties from septic systems to the county's sanitary sewer, enhancing property values, redevelopment potential, and supporting economic growth. Funding will come from the Building Better Communities General Obligation Bond Program and other WASD funds. The Infrastructure, Innovation & Technology Committee forwarded the item to the BCC with a favorable recommendation.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Awarded
- Address:
- N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
- Applicant:
- All Construction & Plumbing, Inc.
GREEN TECH CORRIDOR (S-16113)
Miami-Dade County Board of County Commissioners awarded Contract No. S-16113 for Wastewater and Water Service to Commercial Properties in the Green Tech Corridor S-1 North. The contract was awarded to All Construction & Plumbing, Inc. for $12,506,147.00 with a contract period of 627 calendar days. The project involves extending the sanitary sewer system along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, installing approximately 12,000 linear feet of sewer pipe and manholes, and replacing approximately 4,000 linear feet of aging water mains, including fire hydrants and reconnections. This project is part of the Connect to Protect initiative to transition properties from septic systems to the County's sanitary sewer system. Funding will come from the Building Better Communities General Obligation Bond Program, among other sources. The Infrastructure, Innovation & Technology Committee forwarded the item to the Board with a favorable recommendation.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Awarded
- Address:
- N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street
- Applicant:
- All Construction & Plumbing, Inc.
GREEN TECH CORRIDOR (S-16113)
Miami-Dade County Board of County Commissioners is awarding Contract No. S-16113 for wastewater and water service to commercial properties in the Green Tech Corridor S-1 North. The contract is awarded to All Construction & Plumbing, Inc. for $12,506,147.00 with a period of 627 calendar days. The project involves extending sanitary sewer systems and replacing aging water mains along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street. This initiative is part of the 'Connect to Protect' program, aiming to transition properties from septic systems to the county's sanitary sewer system to improve public health, environmental quality, and support economic growth. Funding will come from the Building Better Communities General Obligation Bond Program and other WASD funds. The Infrastructure, Innovation & Technology Committee forwarded the item to the BCC with a favorable recommendation.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Awarded
- Address:
- N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
- Applicant:
- Water & Sewer Department (Requester), All Construction & Plumbing, Inc. (Contractor)
GREEN TECH CORRIDOR (S-16113)
Miami-Dade County Board of County Commissioners is awarding Contract No. S-16113 for wastewater and water service to commercial properties in the Green Tech Corridor S-1 North. The contract is awarded to All Construction & Plumbing, Inc. for $12,506,147.00 with a duration of 627 calendar days. The project involves extending sanitary sewer systems and replacing aging water mains along N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street. This initiative aims to transition properties from septic systems to the county's sanitary sewer, enhancing property values, redevelopment potential, and supporting economic growth. Funds are sourced from the Building Better Communities General Obligation Bond Program. The Infrastructure, Innovation & Technology Committee forwarded the item to the BCC with a favorable recommendation.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Awarded
- Address:
- N.W. 27 Avenue from N.W. 96 Street to N.W. 106 Street, including adjacent side streets
- Applicant:
- Water & Sewer Department (Requester); All Construction & Plumbing, Inc. (Contractor)