Skip to main content

Sé el Primero, Construye Relaciones Duraderas

AGC ELECTRIC, INC. FOR THE REPLACEMENT OF EXISTING SPAN-WIRE

Transportation Cmte · 2026-09-09 · resolution

Resolution authorizing Supplemental Agreement No. 1 with AGC Electric, Inc. for design-build services to replace existing span-wire signalized intersections with mast-arm configurations. The agreement increases the maximum contract value by $1,298,633.43 to $10,225,993.43 and extends the contract term by 566 non-compensable calendar days to 1,466 calendar days. The project is funded through Mobility Impact Fees. The additional funds address inflationary increases in construction material costs (steel, aluminum, PVC, copper) and the time extension is due to utility coordination delays with Florida Power & Light and early-phase COVID-19 restrictions. The project currently includes 14 intersections under construction. The item was introduced on 8/19/2026, assigned to the Transportation Committee, and is scheduled for agenda date 10/6/2026 as item 8N. Status is 'In Committee'. No final action is stated. No public comment or stakeholder sentiment is stated.

Follow this across meetings

Applicants and firms

Mira los negocios reales detrás de estos números

Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.

Crea tu cuenta