4. LOSS OF CRITICAL FUNCTION: A flood control project is
May 19, 2026 City Council Regular Session · 2026-05-19 · agenda_item
A flood control project is planned to reduce flood risks to several important facilities, including buildings, roads, and utilities. The project aims to improve protection for critical infrastructure such as fire stations, police stations, hospitals, and various utilities like electrical power, potable water, and wastewater systems. This initiative is currently under review by the City of Mount Dora. The project will likely involve site clearing and grading, underground utility work, and potentially new construction or upgrades to existing structures. Contractors specializing in civil engineering, site preparation, utility installation, and general construction may find opportunities as plans develop. Reaching out to the city early could provide an advantage before detailed site plans, bids, and permits are finalized.
Industries that could win this work
- General Contractor
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Engineering & Architecture
Follow this across meetings
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.
Crea tu cuenta