Approval to award Invitation for Bids Y26-707-MB, Wekiwa Springs Septic Tank Retrofit Project Phase 5A - Carol Woods Way & Wekiva Ridge Road, to the low responsive and responsible bidder, R.P. Utility and Excavation Corp, in the estimated contract award amount of $5,607,809.

The Board of County Commissioners, Orange County, has approved the Wekiwa Springs Septic Tank Retrofit Project Phase 5A. This project is located along Carol Woods Way and Wekiva Ridge Road. The estimated contract award amount is $5,607,809. The project involves awarding a bid to a contractor for septic tank retrofitting. This work will likely include underground utility work and site preparation. If the selected bidder cannot meet pre-award requirements, the county may award the contract to the next lowest bidder. Contractors specializing in utility work and site preparation may find opportunities. Early engagement is advised as the project moves forward.

Board:
Board of County Commissioners
Date:
2026-04-21
Type:
Agenda_item
Decision:
Board of County Commissioners, Orange County
Address:
Carol Woods Way & Wekiva Ridge Road

Approval to award Invitation for Bids Y26-711-JF, South McKinley Avenue Drainage Improvements Project, to the low responsive and responsible bidder, AP Construction Contractor, LLC, in the total contract award amount of $580,296.99.

The Board of County Commissioners, Orange County, has approved the award of a contract for the South McKinley Avenue Drainage Improvements Project. This project involves significant infrastructure work to enhance the local drainage system. The initial contract award is for $580,296.99 to AP Construction Contractor, LLC, with provisions for awarding to an alternate bidder if necessary. This project will likely involve site preparation, grading, underground utility work for drainage systems, and potentially paving. Contractors specializing in civil engineering, site preparation, grading, concrete work, and underground utilities can anticipate opportunities. Early engagement with the county procurement process is advised as the project moves from approval towards execution.

Board:
Board of County Commissioners
Date:
2026-04-21
Type:
Agenda_item
Decision:
Board of County Commissioners, Orange County
Address:
South McKinley Avenue

April 2, 2026 Board of Zoning Recommendations

The Board of County Commissioners, Orange County, has approved case number 26-0470. This item relates to a Board of Zoning Recommendations. The applicant is Commissioner Michael Scott. This approval means that future development or construction work may be planned. Specific details about the project's location, size, or proposed use are not yet available. The next steps in the public process are not detailed in this item. This early stage suggests potential opportunities for contractors, suppliers, and service providers to engage as project plans are developed. Businesses involved in site preparation, construction trades, material supply, and related professional services could find opportunities as this zoning recommendation moves toward potential future development. Early engagement before final plans and permits are issued may offer a competitive advantage.

Board:
Board of County Commissioners
Date:
2026-04-21
Type:
Agenda_item
Applicant:
Commissioner Michael Scott

Board of County Commissioners

The Board of County Commissioners met to discuss several upcoming projects and reviews. Several new developments are planned, including a commercial and residential project near East Colonial Drive and Alafaya Trail, an industrial development near State Road 528 and Innovation Drive, and commercial projects near State Road 436 and State Road 434, and at Orange Avenue and Main Street. Other opportunities include affordable housing construction, utility easements, and road improvements for the Rock Springs Road Complete Streets Project. Several contracts were approved for services like biosolids dewatering and retention pond maintenance.

Board:
Board of County Commissioners
Date:
2026-04-21
Type:
Meeting

COMMUNITY AND FAMILY SERVICES DEPARTMENT

This item concerns a planned community and family services department project. The project is currently under review by the Board of County Commissioners. This project will likely involve site preparation, utility work, construction of a new building, and final landscaping. Early engagement with contractors, suppliers, and service providers is advised as plans develop. This early stage offers an opportunity to align services with project needs before formal bidding processes begin.

Board:
Board of County Commissioners
Date:
2026-04-21
Type:
Agenda_item

COMMUNITY REDEVELOPMENT AGENCY

The Community Redevelopment Agency is proposing a new project. This project is currently under review by the Board of County Commissioners, Orange County. The next step in the process is a meeting on April 21, 2026. This project is in its early stages, offering an opportunity for local businesses to engage before final plans are set. The scope of work is expected to involve site preparation, grading, and potentially utility installation, followed by construction phases. This could lead to work in areas such as general contracting, site clearing, concrete, electrical, plumbing, HVAC, and finishing trades. Local contractors, suppliers, and service providers are encouraged to reach out early to understand the project's needs and potential involvement as it moves through the review process.

Board:
Board of County Commissioners
Date:
2026-04-21
Type:
Agenda_item
Applicant:
Community Redevelopment Agency

COMMUNITY REDEVELOPMENT AGENCY

The Community Redevelopment Agency is planning a new project. This project is currently under review by the Board of County Commissioners, Orange County. The specific details of the project, including its location, size, and proposed use, are not yet available. As the project moves forward, it is expected to involve site preparation, grading, and potentially utility work. This early stage presents an opportunity for local contractors, trades, suppliers, and service providers to engage. Reaching out now, before detailed site plans, bids, and permits are finalized, could provide a competitive advantage for businesses interested in future work.

Board:
Board of County Commissioners
Date:
2026-04-21
Type:
Agenda_item

CONSENT AGENDA (Deferred)

This item is currently pending before the Board of County Commissioners, Orange County. It is part of the consent agenda and has been deferred. No specific project details, such as a proposed use, address, or size, have been provided in this agenda item. As the item is pending and deferred, it is in the very early stages of the public process. The scope of work and potential phases are not yet defined. Local contractors, trades, suppliers, and service providers are encouraged to monitor future agendas for this item, as further details may emerge. Early awareness allows businesses to prepare for potential future opportunities once the project is further defined and moves through the public process.

Board:
Board of County Commissioners
Date:
2026-04-21
Type:
Agenda_item

COUNTY ADMINISTRATOR

This item concerns a planned civic project in Orange County. The County Administrator is proposing this project, but no specific details about its nature, location, size, or current use are provided in the available information. The project is currently pending before the Board of County Commissioners, Orange County, Orange. Because the project is in its early stages, there is an opportunity for local contractors, trades, suppliers, and service providers to engage. Early involvement can allow businesses to understand potential project needs as plans develop. This could include site preparation, construction, and related services once the project moves forward.

Board:
Board of County Commissioners
Date:
2026-04-21
Type:
Agenda_item

COUNTY ADMINISTRATOR

The Board of County Commissioners, Orange County, is reviewing a civic agenda item. This item is currently pending. The specific details of the proposal, including its location, size, current use, and proposed use, are not yet available. As the item moves through the public process, it may lead to future construction or development activities. These activities could involve site preparation, utility work, paving, building construction, and landscaping. Local contractors, trades, suppliers, and service providers are encouraged to monitor this item's progress. Engaging early, before formal plans and bids are established, can offer an advantage in securing future work.

Board:
Board of County Commissioners
Date:
2026-04-21
Type:
Agenda_item

COUNTY COMPTROLLER

This item concerns a planned civic agenda item for the Board of County Commissioners, Orange County. The specific project details, such as location, size, current use, or proposed use, are not provided in the agenda item text. The item is currently pending review. As this is a pending civic agenda item, the scope of work is not yet defined. Potential opportunities for local contractors, trades, suppliers, and service providers will emerge as the project moves through the public process and details are finalized. Reaching out early to understand the project's progression could offer an advantage.

Board:
Board of County Commissioners
Date:
2026-04-21
Type:
Agenda_item

COUNTY COMPTROLLER

The Board of County Commissioners, Orange County, is reviewing a civic agenda item. This item is currently pending. The specific details of the project, including its location, size, and proposed use, are not yet available. As the item progresses through the public process, further information will be released. This early stage means that contractors, trades, suppliers, and service providers have an opportunity to engage with the project before detailed plans, bids, and permits are finalized. Reaching out now allows businesses to understand potential needs and position themselves for future work as the project develops.

Board:
Board of County Commissioners
Date:
2026-04-21
Type:
Agenda_item

COUNTY MAYOR

This item concerns a proposal for a new development project. The project is currently under review by the Board of County Commissioners. Details regarding the specific location, size, current use, or proposed use of the property are not yet available. As the project moves forward, it is expected to involve site preparation, grading, and potentially utility work. This early stage presents an opportunity for local contractors, trades, suppliers, and service providers to engage. Reaching out now, before detailed site plans, bids, and permits are finalized, allows businesses to understand the project's scope and position themselves for potential work as the development progresses.

Board:
Board of County Commissioners
Date:
2026-04-21
Type:
Agenda_item

COUNTY MAYOR

This item concerns a proposal for a new development project. The project is currently under review by the Board of County Commissioners. Details about the specific use, size, or location of the proposed development are not yet available. As the project moves forward, it is expected to involve site preparation, utility work, and construction. Local contractors, trades, suppliers, and service providers are encouraged to monitor this item's progress. Early engagement before final plans and permits are issued could provide a competitive advantage.

Board:
Board of County Commissioners
Date:
2026-04-21
Type:
Agenda_item

DISCUSSION AGENDA

The Board of County Commissioners, Orange County, Orange is reviewing a discussion agenda item. This item is currently pending. The specific details of the project, including its location, size, current use, and proposed use, are not yet available. As this item is in the early stages of review, potential work could involve future site preparation, construction, and related services. Local contractors, trades, suppliers, and service providers are encouraged to monitor future updates on this agenda item. Engaging early in the process, before detailed plans and permits are finalized, may offer an advantage for businesses interested in potential future opportunities.

Board:
Board of County Commissioners
Date:
2026-04-21
Type:
Agenda_item

Development Review Committee Appeal

The Board of County Commissioners, Orange County, Orange is reviewing an appeal related to development. This item is currently pending. The appeal concerns a development review, but no specific project details such as location, size, or proposed use are provided in this agenda item. Because this item is early in the public process, contractors, suppliers, and service providers are encouraged to monitor future updates. As details emerge, opportunities may arise for site preparation, construction, and related services. Reaching out to the relevant county departments or the applicant, once identified, before final plans and permits are issued could provide a business advantage.

Board:
Board of County Commissioners
Date:
2026-04-21
Type:
Agenda_item

Disposition of Tangible Personal Property. (Property Accounting)

This item concerns the disposition of tangible personal property, specifically the disposal of assets. The Board of County Commissioners, Orange County, approved this item on April 21, 2026. This process involves identifying, valuing, and removing surplus or obsolete county assets. The scope of work would likely include inventorying items, arranging for their removal, and potentially preparing them for sale or disposal. This could involve services for asset management, transportation, and auction or recycling services. Businesses that can assist with these processes may find opportunities as the county moves forward with asset disposition.

Board:
Board of County Commissioners
Date:
2026-04-21
Type:
Agenda_item
Decision:
Board of County Commissioners, Orange County

FIRE RESCUE DEPARTMENT

The Board of County Commissioners, Orange County is reviewing a proposal related to the Fire Rescue Department. This item is currently pending. The specific details of the proposal are not yet available, but it is expected to involve planning and potential future work for the department. This early stage in the process presents an opportunity for local contractors, trades, suppliers, and service providers to engage. As the project develops, there may be needs for site preparation, construction, equipment, and specialized services. Reaching out now allows businesses to understand the project's direction and potentially secure future work before formal bidding processes begin.

Board:
Board of County Commissioners
Date:
2026-04-21
Type:
Agenda_item

HEALTH SERVICES DEPARTMENT

The Orange County Board of County Commissioners is reviewing a proposal for the Health Services Department. This item is currently pending, meaning it is in the early stages of the public process. While specific details about the project's scope, location, or size are not yet available, this review suggests potential future needs for construction, renovation, or related services. As the project moves forward, it could involve site preparation, utility work, building construction, and final landscaping. Local contractors, trades, suppliers, and service providers are encouraged to monitor this item's progress. Engaging early, before detailed plans and permits are finalized, offers the best opportunity to understand and compete for potential work.

Board:
Board of County Commissioners
Date:
2026-04-21
Type:
Agenda_item

INFORMATIONAL ITEMS**

This item concerns a proposal for a new development. The specific details of the project, including its location, size, and proposed use, are not yet available. The proposal is currently under review by the Board of County Commissioners, Orange County. As this is an informational item, the project is in its early stages. Future work could involve site preparation, utility installation, construction, and landscaping. Local contractors, suppliers, and service providers are encouraged to monitor this project's progress. Engaging early, before formal plans and bids are established, offers the best opportunity to compete for upcoming work.

Board:
Board of County Commissioners
Date:
2026-04-21
Type:
Agenda_item

Intergovernmental Services Agreement (IGSA) with U.S. Marshals Service (USMS) and ICE.

This item concerns an Intergovernmental Services Agreement (IGSA) between Orange County and the U.S. Marshals Service (USMS) and ICE. The agreement has been approved by the Board of County Commissioners. This is a legal and administrative agreement, not a construction project. Therefore, there is no direct construction work or related trades involved. Local businesses that provide legal services or administrative support may find opportunities related to the implementation or ongoing management of this agreement. Reaching out to the relevant county departments or the listed agencies early could provide insight into any support needs that may arise from this approved agreement.

Board:
Board of County Commissioners
Date:
2026-04-21
Type:
Agenda_item
Decision:
Board of County Commissioners, Orange County, Orange
Applicant:
Commissioner Michael Scott

Legislative Wrap-Up. (Office of Legislative Affairs)

This item concerns a legislative wrap-up by the Office of Legislative Affairs. The Board of County Commissioners, Orange County, Orange will review this item on April 21, 2026. As this is a legislative wrap-up, it is currently pending. The scope of work is not yet defined and will be determined by future legislative actions. This early stage presents an opportunity for local contractors, trades, suppliers, and service providers to engage and understand potential future needs as the legislative process unfolds. Staying informed now can provide a competitive advantage when specific projects or needs are identified.

Board:
Board of County Commissioners
Date:
2026-04-21
Type:
Agenda_item

Meeting Starts at 2:00 p.m.

This item is currently pending before the Board of County Commissioners, Orange County. The meeting is scheduled to begin at 2:00 p.m. on April 21, 2026. No specific project details, such as a proposed development, construction, or infrastructure project, have been provided at this time. Therefore, the scope of work, potential phases, and specific trades involved are not yet defined. As this is a procedural item with no project details, it is too early to identify specific business opportunities for contractors, suppliers, or service providers. Further information will be needed to determine potential involvement.

Board:
Board of County Commissioners
Date:
2026-04-21
Type:
Agenda_item

Municipal Service Benefit Unit

The Board of County Commissioners, Orange County, is reviewing a proposal for a Municipal Service Benefit Unit. This is a planned action, meaning it is in the early stages of the public process. The creation of this unit could lead to future infrastructure improvements and services within a defined area. This process may involve site planning, design, and construction phases for public works. Local contractors, suppliers, and service providers are encouraged to monitor this item's progress. Engaging early can provide an advantage as details of the project and potential work become clearer.

Board:
Board of County Commissioners
Date:
2026-04-21
Type:
Agenda_item

Ordinance

This item concerns a proposed ordinance that is currently under review by the Board of County Commissioners, Orange County. The ordinance's specific details, including its purpose and impact, are not provided in the available information. As the item is pending, it represents an early stage in the public process. Should this ordinance lead to development or construction, it could involve site preparation, utility work, and building construction. Local contractors, suppliers, and service providers are encouraged to monitor this pending item. Engaging early, before final plans and permits are established, offers the best opportunity to understand potential needs and compete for future work.

Board:
Board of County Commissioners
Date:
2026-04-21
Type:
Agenda_item

Ordinance/Comprehensive Plan – Adoption of Small-Scale Amendment, Ordinance, and Concurrent Rezoning

The Board of County Commissioners, Orange County is considering a small-scale amendment, ordinance, and concurrent rezoning. This item is currently pending review. If approved, this action could lead to new development opportunities. The specific scope of work would depend on the final rezoning and amendment details, but could involve site preparation, construction, and related trades. Local contractors, suppliers, and service providers are encouraged to monitor this pending item. Early engagement before final plans and permits are established may offer a competitive advantage.

Board:
Board of County Commissioners
Date:
2026-04-21
Type:
Agenda_item

Ordinance/Comprehensive Plan – Adoption of Small-Scale Amendment, and Ordinance

The Board of County Commissioners, Orange County is considering an ordinance for the adoption of a Small-Scale Amendment to the Comprehensive Plan. This item is currently pending review. The proposed amendment involves a change in land use or zoning, which could lead to future development opportunities. This process typically involves site plan development, permitting, and construction phases. Local contractors, trades, suppliers, and service providers are encouraged to monitor this item's progress. Engaging early in the process, before final plans and permits are issued, can provide a competitive advantage for securing future work related to this amendment.

Board:
Board of County Commissioners
Date:
2026-04-21
Type:
Agenda_item

PLANNING, ENVIRONMENTAL, AND DEVELOPMENT SERVICES DEPARTMENT

The Board of County Commissioners, Orange County is reviewing a proposal for a new development. The specific details of the project, including its location, size, and proposed use, are not yet available. This item is currently pending review by the Planning, Environmental, and Development Services Department. If approved, this project could involve site preparation, grading, utility work, paving, building construction, and landscaping. Local contractors, trades, suppliers, and service providers are encouraged to monitor this item's progress. Engaging early, before final plans and permits are issued, offers the best opportunity to compete for work.

Board:
Board of County Commissioners
Date:
2026-04-21
Type:
Agenda_item

PUBLIC WORKS DEPARTMENT

The Public Works Department is planning a new project that involves the construction of a new public works facility. This project is currently under review by the Board of County Commissioners, Orange County. The proposed facility will be located in Orange County. The project scope is expected to include site preparation, grading, utility installation, building construction, and final landscaping. This early stage in the process presents an opportunity for local contractors, trades, suppliers, and service providers to engage. Reaching out now, before detailed site plans, bids, and permits are finalized, can provide a competitive advantage for securing future work on this civic project.

Board:
Board of County Commissioners
Date:
2026-04-21
Type:
Agenda_item
Address:
Orange County

Planning and Zoning Commission Rezoning Board-Called

A plain-language summary of this record is on the way. You can read the official record now.

Board:
Board of County Commissioners
Date:
2026-04-21
Type:
Agenda_item

Preliminary Subdivision Plan

A preliminary subdivision plan is currently under review by the Board of County Commissioners for Orange County. This plan proposes a new development that will require site clearing and grading, followed by underground utility work and road construction. Subsequent phases will likely involve vertical construction, including framing, mechanical, and finish trades, as well as final landscaping. Local contractors, trades, suppliers, and service providers are encouraged to engage early in this process. Understanding the project details before final site plans, bids, and permits are issued offers a competitive advantage for securing future work.

Board:
Board of County Commissioners
Date:
2026-04-21
Type:
Agenda_item

Presentation of a proclamation recognizing April as National County Government Month

This item is a presentation of a proclamation recognizing April as National County Government Month. The Board of County Commissioners, Orange County, Orange will hear this presentation. This item is currently pending. No construction or development is proposed at this time. Therefore, there are no specific contracting, supply, or service opportunities directly related to this agenda item. Local businesses are encouraged to stay informed about future county initiatives that may present opportunities.

Board:
Board of County Commissioners
Date:
2026-04-21
Type:
Agenda_item

Presentation of a proclamation recognizing May 3 through May 9, 2026, as National Small Business Week

This item is a proclamation recognizing National Small Business Week from May 3 through May 9, 2026. The Board of County Commissioners, Orange County, Orange is presenting this proclamation. The item is currently pending. This proclamation does not involve construction or direct services for contractors, suppliers, or trades. Local businesses are encouraged to be aware of this recognition period.

Board:
Board of County Commissioners
Date:
2026-04-21
Type:
Agenda_item

Presentation of a proclamation recognizing May 4 through May 10, 2026, as Economic Development Week

This item concerns a proclamation recognizing May 4 through May 10, 2026, as Economic Development Week. The Board of County Commissioners, Orange County, Orange is presenting this proclamation. This is a planned event, currently pending. No construction or development work is associated with this item. Businesses involved in economic development, public relations, or event planning may find this proclamation relevant.

Board:
Board of County Commissioners
Date:
2026-04-21
Type:
Agenda_item

Presentation of a proclamation recognizing May as Building Safety Month

This item is a proclamation recognizing May as Building Safety Month. The Board of County Commissioners, Orange County, Orange is presenting this proclamation. This item is currently pending. No construction or development work is described in this item. Therefore, there are no direct contracting, supply, or service opportunities for local businesses at this time. Local businesses are encouraged to stay informed about future civic agenda items that may involve development or construction.

Board:
Board of County Commissioners
Date:
2026-04-21
Type:
Agenda_item

Proposed Amendments to Orange County Code Chapter 9, “Building and Construction Regulations”; All Districts

The Board of County Commissioners, Orange County, has approved amendments to Orange County Code Chapter 9, "Building and Construction Regulations." This item, case file 26-0420, was proposed by Commissioner Michael Scott and has been approved by the board. While specific project details like addresses or sizes are not provided, these regulatory changes will impact building and construction activities throughout all districts in Orange County. The approval of these amendments means that new construction, remodeling, and renovation projects will now need to comply with updated building codes and regulations. This could involve changes to permitting processes, inspection requirements, and material standards. Contractors, suppliers, and service providers in the construction industry should reach out to understand how these new regulations might affect their current and future projects. Early engagement can provide a competitive advantage as the industry adapts to the revised building standards.

Board:
Board of County Commissioners
Date:
2026-04-21
Type:
Agenda_item
Decision:
Board of County Commissioners, Orange County
Applicant:
Commissioner Michael Scott

RECOMMENDATIONS

A plain-language summary of this record is on the way. You can read the official record now.

Board:
Board of County Commissioners
Date:
2026-04-21
Type:
Agenda_item

Receipt of the following items to file for the record: (Clerk’s Office)

This notice is about several items filed with the Board of County Commissioners, Orange County. These include proposed agency actions from the Florida Public Service Commission regarding solar rate adjustments for Duke Energy Florida, LLC, and a petition for a rate increase by Florida Power & Light Company. Additionally, there are proposed budgets for the Westwood/OCC and Falcon Trace Community Development Districts for Fiscal Year 2027. These filings are currently pending and have been received for the record. The scope of work related to these items involves regulatory compliance, financial reporting, and potential future utility infrastructure planning. Businesses involved in utility services, regulatory consulting, financial auditing, and legal services may find opportunities related to these ongoing processes. Engaging early with the relevant authorities and companies involved could provide an advantage as these matters move forward.

Board:
Board of County Commissioners
Date:
2026-04-21
Type:
Agenda_item
Applicant:
Duke Energy Florida, LLC

Resolution for collection of special assessment liens for one time only lot cleaning; All Districts

A resolution has been approved by the Board of County Commissioners for Orange County regarding the collection of special assessment liens for one-time lot cleaning. This initiative applies to all districts within the county. The approved resolution means the county will proceed with assessing and collecting funds for lot cleaning services. This process will likely involve identifying properties needing cleaning, contracting for those services, and then billing the property owners through special assessments. Local contractors specializing in property maintenance, landscaping, and general site cleanup could find opportunities through this approved measure. Engaging with county officials or relevant departments early could provide insight into the specific needs and timelines as the program is implemented.

Board:
Board of County Commissioners
Date:
2026-04-21
Type:
Agenda_item
Decision:
Board of County Commissioners, Orange County
Applicant:
Maribel Gomez Cordero

Selection of Halff Associates, Inc. to provide Real-Time Flood Forecasting for Orange County, Request for Proposals, Y26-803-CC.

Orange County is planning to implement a Real-Time Flood Forecasting system. This project is currently approved and moving forward. The initial phase will involve contract negotiation and execution, with a budget of up to $1,000,000. Future work will likely include system design, data integration, and ongoing operational support. This presents an opportunity for professional services firms, particularly those in engineering and IT, to engage with the county early in the process. Reaching out now, before final contract details are set, allows businesses to understand the project scope and potentially influence its direction.

Board:
Board of County Commissioners
Date:
2026-04-21
Type:
Agenda_item

Selection of one firm and an alternate to provide Audit Services, Request for Proposals Y26-115-KC, from the following firms listed alphabetically:

Orange County is seeking to select one firm, and an alternate, to provide audit services. The Board of County Commissioners has approved this item, which is currently in the process of contract negotiation. This project involves the selection of a firm to perform audit services for a one-year term, with the possibility of four additional one-year renewals. The estimated total contract value is $395,000. If negotiations with the top-ranked firm are unsuccessful, the county may proceed with the alternate firm. This opportunity is for professional audit services, and interested firms should be aware that negotiations are underway. Early engagement with the county's Procurement Division could be advantageous as contract terms are being finalized.

Board:
Board of County Commissioners
Date:
2026-04-21
Type:
Agenda_item
Applicant:
Jerry L. Demings

Selection of one firm and an alternate to provide Special Legal Counsel for the Grievance Adjustment Board, Request for Proposals Y26-121-LS, from the following firms listed alphabetically:

The Board of County Commissioners, Orange County, has approved the selection of a firm to provide Special Legal Counsel for the Grievance Adjustment Board. This item, case number 26-0423, involves a request for proposals (Y26-121-LS) for legal services. The approved action allows for the selection of one firm and an alternate from a list of candidates. The Procurement Division is authorized to negotiate and execute a contract with a not-to-exceed budget of $131,250. If negotiations with the top firm are unsuccessful, the Procurement Division may terminate those talks and begin negotiations with the alternate firm. This process is now in the approval stage, indicating that the need for legal services has been confirmed and a contract is being finalized. The work will involve specialized legal representation and contract negotiation. Local businesses in legal services could find opportunities by engaging with the county's procurement process early, before final contract terms are set.

Board:
Board of County Commissioners
Date:
2026-04-21
Type:
Agenda_item
Decision:
Board of County Commissioners, Orange County
Applicant:
Commissioner Christine Moore

Serenade at Ovation Area, amend for streetlighting and for retention pond(s) maintenance; District 1

The Board of County Commissioners, Orange County, has approved a project called Serenade at Ovation Area. This project involves amendments for streetlighting and the maintenance of retention pond(s) in District 1. The approval means the project is moving forward. This development will likely require site clearing and grading, followed by underground utility work for streetlights and drainage systems. Paving for new roads and pathways will also be needed. The project will then involve the installation of lighting fixtures and landscaping around the retention ponds. Contractors specializing in site preparation, utility installation, paving, electrical work for lighting, and landscaping services could find opportunities. Reaching out now, before specific bid packages and permits are finalized, offers a chance to get involved early in this approved civic project.

Board:
Board of County Commissioners
Date:
2026-04-21
Type:
Agenda_item
Decision:
Board of County Commissioners, Orange County
Address:
District 1
Applicant:
Commissioner Nicole Wilson

Substantial Change

This item concerns a substantial change to a project that is currently under review by the Board of County Commissioners, Orange County. The specific details of the proposed change and the project itself, including its location, size, current use, and proposed use, are not provided in the agenda item text. Because the item is pending and described only as a 'Substantial Change,' it indicates an early stage in the public process. This early stage means that planning and design work may be ongoing. Contractors, suppliers, and service providers who engage now could have an advantage in understanding the project's evolving needs and potentially securing future work as the project moves through its phases, which could include site preparation, construction, and finishing trades. Reaching out early allows businesses to be aware of opportunities before formal bids and permits are finalized.

Board:
Board of County Commissioners
Date:
2026-04-21
Type:
Agenda_item

UTILITIES DEPARTMENT

The Utilities Department is planning a new project. This project is currently under review by the Board of County Commissioners. The project involves the installation of new underground utilities. This work will likely include site clearing and grading, excavation, trenching for pipe installation, and backfilling. Following the underground work, there will be paving and restoration of the surface. This early stage presents an opportunity for contractors, suppliers, and service providers to engage with the project. Reaching out now, before detailed plans and bids are finalized, allows businesses to understand the project scope and potentially secure future work.

Board:
Board of County Commissioners
Date:
2026-04-21
Type:
Agenda_item

Watercrest at Windermere, establish for streetlighting and for retention pond(s) maintenance; District 1

The Board of County Commissioners, Orange County has approved a new district for streetlighting and maintenance of retention pond(s) called Watercrest at Windermere. This project is in District 1. The approval means that planning and design work for the necessary infrastructure will begin soon. This will likely involve site preparation, installation of underground utilities for lighting, and potentially paving or landscaping around the retention ponds. Contractors specializing in site prep, grading, underground utilities, electrical work for lighting, and landscaping services could find opportunities. Suppliers of lighting fixtures and materials for pond maintenance may also be needed. Engaging with the project early, before final plans and permits are issued, offers the best chance to compete for this work.

Board:
Board of County Commissioners
Date:
2026-04-21
Type:
Agenda_item
Decision:
Board of County Commissioners, Orange County
Address:
Watercrest at Windermere

Wekiva Springs Cove, establish for streetlighting and for retention pond(s) maintenance; District 2

The Board of County Commissioners, Orange County, has approved the establishment of Wekiva Springs Cove. This project is intended to provide streetlighting and maintenance for retention pond(s) within the area. The approval means that planning and design work for these improvements can now move forward. This will likely involve initial site assessments, followed by the installation of streetlighting infrastructure and the setup of ongoing maintenance plans for the retention ponds. Contractors specializing in electrical work, site preparation, and general civil maintenance could find opportunities as this project progresses through its implementation phases. Engaging early allows businesses to understand the project scope before formal bidding processes begin.

Board:
Board of County Commissioners
Date:
2026-04-21
Type:
Agenda_item
Decision:
Board of County Commissioners, Orange County
Address:
Wekiva Springs Cove

Woodside Preserve, establish for streetlighting and for retention pond(s) maintenance; District 3

Orange County is planning for streetlighting and retention pond maintenance within the Woodside Preserve area. This project is currently approved by the Board of County Commissioners. The work will involve establishing the necessary infrastructure for streetlighting, which could include trenching, conduit installation, and fixture placement. It will also involve ongoing maintenance for retention pond(s), which may require site preparation, grading, and landscaping services. Local contractors, suppliers, and service providers should consider reaching out to the county or relevant departments early. Engaging before final plans and permits are set allows businesses to understand the project scope and potentially compete for future work in site preparation, utility installation, and ongoing maintenance services.

Board:
Board of County Commissioners
Date:
2026-04-21
Type:
Agenda_item
Address:
Woodside Preserve
Applicant:
Mayra Uribe

World Design Center Area, amend for retention pond(s) maintenance; District 6

The Board of County Commissioners, Orange County, has approved a plan for the World Design Center Area. This project involves maintenance for retention pond(s) within District 6. The approval means that work is planned to begin. This will likely involve site preparation, grading, and potentially underground utility work related to the retention ponds. Contractors specializing in site prep, grading, and civil engineering services could find opportunities. Suppliers of construction materials and equipment may also be needed. Reaching out now, before specific plans and bids are finalized, offers a chance to get involved early.

Board:
Board of County Commissioners
Date:
2026-04-21
Type:
Agenda_item
Decision:
Board of County Commissioners, Orange County
Address:
World Design Center Area, District 6
Applicant:
Commissioner Michael Scott

World Design Center Area, amend for retention pond(s) maintenance; District 6

The Board of County Commissioners, Orange County, has approved a plan to amend the World Design Center Area for the maintenance of retention pond(s). This project is located in District 6. The approval means that work related to the maintenance of these retention ponds is now planned. This work will likely involve site preparation, grading, and potentially the installation or repair of drainage systems and related landscaping. Contractors specializing in site work, grading, and potentially utility or landscaping services may find opportunities as this project moves forward. Early engagement with the county or project managers could provide insight into specific timelines and requirements before official bids are released.

Board:
Board of County Commissioners
Date:
2026-04-21
Type:
Agenda_item
Decision:
Board of County Commissioners, Orange County
Address:
World Design Center Area

Mira los negocios reales detrás de estos números

Obtén los registros reales, con direcciones y directivos, gratis por 7 días. Sin tarjeta de crédito.

Comienza tu prueba gratis