Browse Pasco County civic records
Every published record for Pasco County, newest first. Filter by board, year, or industry to jump straight to the records you want, and page through to reach the full archive.
3,317 records
5. If construction activities are to occur between January 1 to July 1, the applicant/applicable
This item concerns requirements for construction projects in Pasco County that may impact Florida Sandhill Cranes. If construction is planned between January 1 and July 1, developers must submit a breeding season survey for the crane, following FFWCC guidelines. This report needs approval from FFWCC and Pasco County before site construction can begin, as shown by a site development placard. If nests are found, avoidance or mitigation measures must be completed with FFWCC and the County. This process is currently under review. The work would involve ecological surveys, potential site preparation adjustments, and possibly habitat restoration or protection measures. Contractors specializing in environmental consulting, land surveying, site clearing, and landscaping may find opportunities. Early engagement with the county and FFWCC can provide insight into specific project needs and timelines.
- Board:
- Planning Commission
- Date:
- 2026-04-16
- Type:
- Agenda_item
5. PDE26-7892: Affidavit of Public Notice
A project is under review to change the zoning for a property located on the south side of State Road 52, approximately 900 feet west of U.S. 41. The current zoning is MPUD (Master Planned Unit Development) and the proposed zoning is also MPUD. This change is part of a larger plan for the Land O' Lakes 41 MPUD. The project is currently in the planning commission review stage. If approved, this change could lead to future development, involving site preparation, construction of infrastructure, and building construction. Contractors, suppliers, and service providers are encouraged to engage early to understand the project's scope and potential needs as plans develop. This early engagement can provide an advantage before final bids and permits are issued.
- Board:
- Planning Commission
- Date:
- 2026-04-16
- Type:
- Agenda_item
- Address:
- S SIDE OF SR 52., APPROX 900' W OF US 41
- Applicant:
- SANDRIDGE COMMERCIAL LLC & SR 52 WILLIAMS LLC
5. The applicant will be required to build a ten (10) foot multi-use path on the project's
A ten foot multi-use path is planned along the project's frontage of State Road 52. This project is currently under review by the Planning Commission. The work will involve site preparation, grading, and paving for the path. Contractors specializing in site work, concrete, and paving may find opportunities. Reaching out early could provide an advantage before final plans and bids are set.
- Board:
- Planning Commission
- Date:
- 2026-04-16
- Type:
- Agenda_item
- Address:
- State Road 52
5. UNLESS IT BEARS THE ORIGINAL SIGNATURE AND SEAL OF A FLORIDA LICENSED SURVEYOR AND MAPPER
Planning Commission listed this item on its agenda for 2026-04-16 in Pasco County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Planning Commission
- Date:
- 2026-04-16
- Type:
- Agenda_item
58. A
This item concerns a potential requirement for developers to conduct an updated Timing and Phasing Analysis if their land use plans create more traffic than currently approved. The Planning Commission or other county officials may add conditions based on this analysis. Developers will be responsible for designing, permitting, and constructing Bulloch Boulevard. This process is currently under review. The work would involve traffic studies, potential road construction, and compliance with county conditions. Contractors specializing in civil engineering, site development, and road construction could find opportunities as this review progresses. Engaging early before final plans and permits are set could provide a competitive advantage.
- Board:
- Planning Commission
- Date:
- 2026-04-16
- Type:
- Agenda_item
6. ADDITIONS OR DELETIONS TO SURVEY MAPS OR REPORTS BY OTHER THAN THE SIGNING PARTY OR
Planning Commission listed this item on its agenda for 2026-04-16 in Pasco County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Planning Commission
- Date:
- 2026-04-16
- Type:
- Agenda_item
6. GENERAL OR SPECIAL TAXES AND ASSESSMENTS REQUIRED TO BE PAID IN THE YEAR 2022 AND
Planning Commission listed this item on its agenda for 2026-04-16 in Pasco County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Planning Commission
- Date:
- 2026-04-16
- Type:
- Agenda_item
6. School District: The Pasco County School District provided the following comments: This
The Pasco County School District is reviewing a proposed development that is expected to generate approximately 120 students. This project will be subject to school impact fees and a school concurrency review. Any development that exceeds the adopted Level of Service will need to address the impacts it creates. The project is currently under review. This review process could lead to site clearing and grading, underground utility work, road and driveway paving, and eventual construction of buildings. Contractors, suppliers, and service providers are encouraged to reach out early to understand the project's scope and potential needs before final plans and permits are established.
- Board:
- Planning Commission
- Date:
- 2026-04-16
- Type:
- Agenda_item
6. Suitable nest cavities for the Southeastern American Kestrel were observed within the
This item concerns a project area where suitable nest cavities for the Southeastern American Kestrel have been observed. The applicant must survey these cavities for kestrel activity during the breeding season, from March 1 to July. All potential nesting cavities need to be identified, recorded, and clearly marked in the field. Before site construction can begin, the applicant must follow current Florida Fish and Wildlife Conservation Commission (FFWCC) permitting rules and provide documentation of compliance. This project is currently under review. The work will involve ecological surveys and potentially habitat protection measures before any site development begins. Contractors specializing in environmental consulting, wildlife surveys, and site preparation may find opportunities. Early engagement is advised as permitting and site plans are being finalized.
- Board:
- Planning Commission
- Date:
- 2026-04-16
- Type:
- Agenda_item
6. The proposed substantial modification is consistent with the adopted subarea (POLICY
This item concerns a proposed substantial modification to a subarea plan in Land O' Lakes, specifically related to POLICY FLU 7.1.76. The Pasco County Planning Commission is reviewing this modification. While no specific project details like address, size, or current use are provided, the review indicates a potential for future development or changes within the designated subarea. The process is currently under review, suggesting that opportunities for contractors, suppliers, and service providers may arise as plans are further developed. This could involve site preparation, construction, and related services depending on the nature of the modification. Local businesses are encouraged to monitor this review process, as early engagement before final site plans, bids, and permits are established can offer a competitive advantage.
- Board:
- Planning Commission
- Date:
- 2026-04-16
- Type:
- Agenda_item
7. ADJOINING PROPERTY INFORMATION SHOWN HEREON IS BASED ON INFORMATION OBTAINED FROM THE
Planning Commission listed this item on its agenda for 2026-04-16 in Pasco County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Planning Commission
- Date:
- 2026-04-16
- Type:
- Agenda_item
7. OIL, GAS AND MINERAL RESERVATIONS CONTAINED IN THAT CERTAIN DEED FROM CARLTON C. CONE AND
Planning Commission listed this item on its agenda for 2026-04-16 in Pasco County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Planning Commission
- Date:
- 2026-04-16
- Type:
- Agenda_item
7. Parks, Recreation, and Natural Resources (PRNR): The PRNR supports the proposed
The Planning Commission is reviewing a rezoning request for a property located in Pasco County. The Parks, Recreation, and Natural Resources department supports this rezoning proposal, provided certain conditions are met. This item is currently under review by the Planning Commission. The rezoning action itself does not require funding. This early stage in the public process presents an opportunity for local contractors, trades, suppliers, and service providers to engage. As the rezoning moves forward, it could lead to future development projects that will require services such as site preparation, construction, and related trades. Reaching out now allows businesses to understand the potential scope and be prepared when specific plans and permits are finalized.
- Board:
- Planning Commission
- Date:
- 2026-04-16
- Type:
- Agenda_item
7. The proposed request is consistent with the Pasco County LDC, Chapter 400,
This item concerns a proposed zoning amendment for a Master Planned Unit Development (MPUD) in Pasco County. The request is currently under review by the Planning Commission. A preliminary feasibility analysis has been completed by the PDE, with comments and conditions coming from various county departments and agencies. This review process indicates that the project is in its early stages. If approved, this MPUD would likely involve site clearing and grading, followed by underground utility work, road and driveway construction, and then the vertical construction of buildings. Following that, mechanical and finish trades would be needed, along with final landscaping. Local contractors, trades, suppliers, and service providers should consider reaching out now, before site plans, bids, and permits are finalized, to understand the potential scope and timing of this development.
- Board:
- Planning Commission
- Date:
- 2026-04-16
- Type:
- Agenda_item
7. The upland buffer line shall be clearly field demarcated prior to any construction activities.
This item concerns a planned development that requires specific attention to wetland upland buffer lines. Before any site work begins, these buffer lines must be clearly marked in the field. Construction activities, such as clearing, grading, or grubbing, are restricted within these buffer zones unless specifically approved by the County and shown on approved construction plans. This project is currently under review, indicating an early stage in the planning process. The work will involve careful site preparation and adherence to environmental regulations, potentially including site clearing and grading, and specialized environmental consulting. Contractors and suppliers involved in site preparation, environmental services, and land management could find opportunities by engaging early, before final plans and permits are established. Understanding these requirements now allows businesses to prepare for potential involvement as the project progresses through its review stages.
- Board:
- Planning Commission
- Date:
- 2026-04-16
- Type:
- Agenda_item
8. A c
Planning Commission listed this item on its agenda for 2026-04-16 in Pasco County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Planning Commission
- Date:
- 2026-04-16
- Type:
- Agenda_item
8. BEARINGS AND DISTANCES SHOWN HEREON ARE MEASURED UNLESS QUALIFIED OTHERWISE.
Planning Commission listed this item on its agenda for 2026-04-16 in Pasco County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Planning Commission
- Date:
- 2026-04-16
- Type:
- Agenda_item
8. CERTIFICATE OF ESTABLISHING WATER BASIN OF THE SOUTHWEST FLORIDA WATER MANAGEMENT
Planning Commission listed this item on its agenda for 2026-04-16 in Pasco County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Planning Commission
- Date:
- 2026-04-16
- Type:
- Agenda_item
9. EASEMENT CONTAINED IN WARRANTY DEED RECORDED IN O.R. BOOK 5121, PAGE 992, PUBLIC RECORDS
Planning Commission listed this item on its agenda for 2026-04-16 in Pasco County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Planning Commission
- Date:
- 2026-04-16
- Type:
- Agenda_item
9. HORIZONTAL CONTROL POSITIONS WERE DERIVED BY GLOBAL POSITIONING SYSTEM (GPS)
Planning Commission listed this item on its agenda for 2026-04-16 in Pasco County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Planning Commission
- Date:
- 2026-04-16
- Type:
- Agenda_item
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.
Crea tu cuenta