3) Information Only - Final Plats Approved by Engineering

Commission Committee Meeting · 2026-05-19 · agenda_item

This notice is for local contractors and suppliers regarding several final plats that have been approved by the Engineering Department for Santa Rosa County. These approvals include Marcus Point Acres with 3 lots, Waterside at East Bay Phase 1 with 47 lots, Makaira Ridge with 273 lots, Jubilee Phase 101A with 83 lots, and Soundview Point Villas with 150 lots. These projects are private and public subdivisions. The final plats have been approved, meaning the planning and review stages are complete, and development is likely to proceed. This work will involve site preparation, grading, utility installation, road construction, and the building of homes. Contractors, trades, and suppliers in site prep, grading, concrete, paving, framing, electrical, plumbing, HVAC, roofing, and landscaping could find opportunities. Reaching out now, before detailed site plans and permits are finalized, allows businesses to position themselves for potential work as these subdivisions move toward construction.

lots
3 lots
lots
47 lots
lots
273 lots
lots
83 lots
lots
150 lots

Industries that could win this work

  • General Contractor
  • Site Prep, Grading & Hardscape
  • Concrete & Masonry
  • Electrical
  • Plumbing
  • HVAC & Climate Control
  • Roofing
  • Building & Industrial Supply
  • Real Estate Development
  • Engineering & Architecture

Follow this across meetings

Mira los negocios reales detrás de estos números

Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.

Crea tu cuenta