2. Preparation of Taxiway Extension Construction Plans - Design extension of the WAP taxiway
Commission Regular Meeting · 2026-06-11 · agenda_item
Santa Rosa County is planning the design for a taxiway extension at the WAP. This project involves extending the existing WAP taxiway about 500 feet to the east. The extension will create direct taxiway access to Lots 2 and 3. The design will include updated construction plan sheets, new security fencing, and one additional security gate. It will also cover rough grading, minor drainage, and grassing for Lot 2, using excess earthwork from previous Lot 1 construction. A haul road will be maintained from DaVinci Way to an earthwork stockpile on WAP Phase II. This project is currently in the planning and design phase. Work will likely involve site clearing and grading, underground utility and drainage work, paving, and final landscaping. Contractors specializing in site preparation, grading, civil engineering, utility work, fencing, and landscaping could find opportunities. Suppliers of construction materials and equipment may also be involved. Reaching out during this early planning stage can provide an advantage before bids and permits are finalized.
- taxiway extension length
- 500 feet
Industries that could win this work
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Building & Industrial Supply
- General Contractor
- Utilities (Sub)
Follow this across meetings
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.
Crea tu cuenta