Skip to main content

Sé el Primero, Construye Relaciones Duraderas

120 Spring Cove Trail - Request for a west side yard setback variance from ten (10) feet to two (2) feet for retaining wall, terrace and staircase in the R-1AA (Single Family Dwelling) district; BV2026-069 (Josh & Anna Rubich, Applicant) District 3 - Constantine (Angi Gates, Project Manager)

Board of Adjustment · 2026-09-28 · agenda_item

A variance request is planned for the property at 120 Spring Cove Trail. The applicant, Josh & Anna Rubich, is asking the Board of Adjustment to allow a west side yard setback of two feet instead of the required ten feet. This reduced setback is needed for a retaining wall, terrace, and staircase on the property. The property is in the R-1AA (Single Family Dwelling) district. The item is currently pending and under review by the Board of Adjustment, with a meeting scheduled for September 28, 2026. If approved, the project would involve site preparation, construction of the retaining wall and terrace, and installation of the staircase. Local contractors and suppliers in site work, concrete, masonry, and landscaping could find opportunities by contacting the project manager early, before final plans and permits are settled.

west side yard setback requested
2 feet
west side yard setback required
10 feet

Industries that could win this work

  • Concrete & Masonry
  • Site Prep, Grading & Hardscape
  • General Contractor
  • Construction (Other)
  • Engineering & Architecture
  • Landscaping & Lawn Service
  • Appraisal & Inspection

Follow this across meetings

Applicants and firms

Mira los negocios reales detrás de estos números

Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.

Crea tu cuenta