Skip to main content

Sé el Primero, Construye Relaciones Duraderas

Browse Taylor County civic records

Every published record for Taylor County, newest first. Filter by board, year, or industry to jump straight to the records you want, and page through to reach the full archive.

36 records

Agenda

This document is a suggested agenda for the Taylor County Board of County Commissioners Special Meeting on Tuesday, May 26, 2026, at 6:00 PM, held at 201 E. Green Street, Taylor County Administrative Complex, Perry, Florida. The agenda includes prayer, pledge of allegiance, approval of the agenda, and a discussion of the Sheriff's Department budget request. It also outlines procedures for public comment, including dialing *5 to speak for 3 minutes per agenda item. Information regarding accommodations for persons with disabilities is provided, with contact Patricia Sadler at 201 E. Green Street, Perry, Florida, 850-838-3500, ext. 7, within two working days. The agenda and documentation are available on www.taylorcountygov.com.

Board:
Board of Commissioner Special Meeting
Date:
2026-05-26
Type:
Agenda
Address:
201 E. Green Street

Minutes

The Taylor County Board of County Commissioners met on May 26, 2026, to discuss the Sheriff's Department budget. The Sheriff's Department requested $9.2 million plus $300,000 for capital outlay for the upcoming year, and appealed for their entire requested budget. The Board initially asked all departments to reduce their budgets, but the Sheriff's Department requested an increase. The Appeals Panel recommended the Board and Sheriff's Department try to reach an agreement. Commissioner English recommended offering $200,000 from the General Fund plus an additional $300,000 for capital outlay, totaling $500,000. Commissioner Feagle stood by her original decision, noting that everyone else made budget cuts. The motion to allocate $500,000 ($200,000 from General Fund and $300,000 from Small County Surtax) passed by a 4-1 vote, with Commissioner Feagle voting no. The total allocated is still $100,000 less than the previous year's $700,000. Public comment was not provided for non-agenda items.

Board:
Board of Commissioner Special Meeting
Date:
2026-05-26
Type:
Minutes
Decision:
Approved $500,000 budget allocation for Sheriff's Department (4-1 vote)
Address:
201 E. GREEN STREET
Applicant:
Sheriff's Department

Public Notice

NOTICE REGARDING MEMBERS OF THE TAYLOR COUNTY BOARD OF COUNTY COMMISSIONERS' ATTENDANCE AT TAYLOR COUNTY SHERIFF BUDGET APPEAL HEARING. The hearing is scheduled for Wednesday, May 20, 2026, from 10:00 A.M. to 11:00 A.M. at the FDOT Auditorium, 605 Suwannee Street, Tallahassee, FL 32399. This notice is given pursuant to Florida Statutes 286.0105, indicating that more than one county commissioner may be in attendance.

Board:
Multiple Commissioner Attendance
Date:
2026-05-20
Type:
Other
Address:
605 Suwannee Street, Tallahassee, FL 32399

Amended Agenda

[201 E. Green Street, Perry, Florida] Taylor County Board of County Commissioners meeting on May 19, 2026, at 6:00 PM at 201 E. Green Street, Perry, Florida. Agenda includes consideration of final payments for demolition and reconstruction of homes through the HHRP program for Michael Barnes ($75,916.80), Sharon Phelps ($92,506.00), Kristina and Robert Hugger ($93,579.00), and Randolph Copeland ($64,396.80). Also includes consideration of Change Order #1 for rehabilitation of Sadaytril Smith's home ($3,425.00) through the HHRP SHIP program. The Board will review and consider approval of the 2026 Airport Improvement Program Grant Application and the 2026 Airport Infrastructure Grant Application for the taxiway realignment project at Perry Foley Airport. Consideration of award for the Taxiway Realignment Project to Anderson Columbia ($1,731,830.03) is contingent on FAA funding. Other items include award of the McDaniel Road Widening/Resurfacing Project, award of the 13th and Central USACE Floodplain Mitigation Project, review of Big Bend Healthcare Coalition Project submissions, approval of funds for courthouse parking lot improvements ($11,308.00), budget transfer for signage at Hodges Park and Glenn Ratliff Memorial Sports Complex ($10,800), adoption of resolutions for unanticipated and shortfall of monies in various funds, bids for roadside right-of-way mowing, discussion of building permit #30830 for Anthony Wilson at 145 Cedar Island Road, quarterly update from Taylor County Development Authority Director Bob Cate, discussion of speed humps at the end of CR-14, and discussion of solid waste operations. Grant agreements for taxiway realignment phase 2 and a new hangar at Perry-Foley Airport will be reviewed. Cold weather warming center guidelines and budget will be considered. A draft settlement agreement with Ponchos Cantina and Grill and a draft interlocal agreement for distribution of local option gas tax with the City of Perry will be considered.

Board:
Board of Commissioners Meeting
Date:
2026-05-19
Type:
Agenda
Address:
201 E. Green Street, Perry, Florida

Amended Agenda Packet

[201 E. GREEN STREET (Administrative Complex), 212 Tippett Drive (Michael Barnes), 17886 Phelps Road (Sharon Phelps), 306 Folsom Place (Kristina and Robert Hugger), 203 Ivy Avenue (Randolph Copeland), Perry Foley Airport] The Taylor County Board of County Commissioners will consider final payments for several home demolition and reconstruction projects funded through the HHRP program. These include projects for Michael Barnes ($75,916.80), Sharon Phelps ($92,506.00), Kristina and Robert Hugger ($93,579.00), and Randolph Copeland ($64,396.80). A change order for $3,425.00 for Sadaytril Smith's home rehabilitation is also on the agenda. Additionally, the board will review and consider approval of grant applications to the FAA for the Taxiway Realignment Project at Perry Foley Airport, including a $1,334,048.53 application for the Airport Improvement Program and a separate grant agreement for Phase 2 of the project. A new hangar construction grant application is also being considered. The board will also consider awarding the McDaniel Road Widening/Resurfacing Project and the 13th and Central USACE Floodplain Mitigation Project. Other items include final payment approval for the Courthouse parking lot improvements ($11,308.00), installation of signs at Hodges Park and Glenn Ratliff Memorial Sports Complex ($10,800), and adoption of resolutions for budget adjustments. Bids for roadside right-of-way mowing will be received. Ray Curtis will discuss building permit #30830 for Anthony Wilson at 145 Cedar Island Road. Bob Cate will provide a quarterly update. The board will discuss speed humps at the end of CR-14 and solid waste operations. [Perry Foley Airport] This document outlines the administrative and certification requirements for airport improvement projects funded by the Federal Aviation Administration (FAA). It details procedures for grant applications, budget information, indirect costs, lobbying certifications, and representations regarding land use, defaults, disabilities, consistency with local plans, consideration of local interests, consultation with users, public hearings, air and water quality, exclusive rights, and land acquisition. It also specifies budget categories for various project expenses, including administration, preliminary expenses, land acquisition, architectural and engineering fees, inspection, land development, relocation, demolition, construction, equipment, and miscellaneous items. The document includes sections on exclusions from federal participation and the proposed method of financing the non-federal share. Furthermore, it requires a program narrative statement detailing objectives, benefits, approach, geographic location, and sponsor's representative. A bid tabulation for Taxiway Realignments at Perry Foley Airport, opened on April 21, 2026, shows bids from Anderson Columbia Co., Inc., Curt's Construction, Inc., and C.W. Roberts Contracting, Inc., with estimated costs ranging from $1,127,550.00 to $2,363,845.75. A Task Order for Bid and Construction Phase Services for these Taxiway Realignments was issued to AVCON, Inc. for $99,800.00, covering bid phase services and construction administration. The document also includes certifications related to drug-free workplaces and equipment and construction contracts, emphasizing compliance with federal procurement standards and labor laws. [Perry Foley Airport] Taylor County Board of County Commissioners is seeking approval for a 2026 Airport Infrastructure Grant application to the FAA for $406,000 to fund the Taxiway Realignment Project at Perry Foley Airport. The total project cost is $427,868.42, with $17,094.74 in FDOT grant funding already secured. An additional $4,273.68 is needed. The realignment is required to comply with current FAA standards and regulations. [Perry Foley Airport, Perry, Florida] Project involves taxiway realignments at Perry Foley Airport in Perry, Florida. The project is for construction only and is part of the Airport Improvement Program. Key dates include bid opening on April 17, 2026, and bid tabulation/recommendation of award on April 29, 2026. The estimated total project cost is $2,363,845.75. AVCON, Inc. is providing bid and construction phase services for a fee of $99,800.00. Taylor County Board of County Commissioners is the sponsor. [Perry Foley Airport] Taylor County Board of County Commissioners is considering awarding the Taxiway Realignments Project at Perry Foley Airport to Anderson Columbia Co., Inc. for $1,731,830.03. This award is contingent on obtaining additional FAA funding. Three bids were received, and Anderson Columbia was the low bidder. The project includes base bid and additive alternate number 1. [McDaniel Road from Wright Road at its South end to Pisgah Road at its North end] Taylor County Board of County Commissioners is considering awarding the McDaniel Road Widening/Resurfacing Project to Anderson Columbia Co., Inc. for $2,395,370.46. This project is part of the FDOT Small County Outreach Program and involves widening and resurfacing approximately 1.3 miles of McDaniel Road. The award is contingent on funding availability, with potential state and local funding sources being explored. Four proposals were received, and Anderson Columbia was the apparent lowest responsive bidder. [13th and Central area, Steinhatchee Community; case 2024-005-OEC] Taylor County Board of County Commissioners is considering awarding the 13th and Central USACE Floodplain Mitigation Project to Anderson Columbia Co., Inc. for $2,157,229.33. This project aims to address flooding in the Steinhatchee Community using American Rescue Plan Act funding and involves drainage improvements and roadway reconstruction. The award is contingent on funding availability. Two proposals were received, and Anderson Columbia was the apparent lowest responsive bidder. [13th and Central area] The Taylor County Board of County Commissioners is considering awarding the 13th and Central USACE Floodplain Mitigation Project to Anderson Columbia Co., Inc. as the apparent lowest responsive bidder for $2,157,229.33. The project involves drainage improvements and roadway reconstruction to lessen flooding severity. Funding of $2,026,848 is available from ARPA Funding for Fiscal Year 2026/27. Bids were opened on April 21, 2026. The meeting date requested for the decision is May 19, 2026. Taylor County Emergency Management is seeking approval for four grant applications for the 2026-2027 Big Bend Healthcare Coalition Projects. The projects include a large messaging sign board, a large-scale mass casualty event preparedness initiative, a teen CERT program, and a health fair expo in multiple locations. The recommended action is to approve these submissions. These are reimbursement grants with no direct fiscal impact or match required. [Courthouse Parking Lot] The Taylor County Board of County Commissioners is considering approving $11,308.00 from the Court Facilities Fund for cleaning, sealing, replacing parking bumpers, and re-striping the Courthouse parking lot. Young Striping and Sealing provided an invoice for this work. The meeting date requested for the decision is May 19, 2026. [Hodges Park and Glenn Ratliff Taylor County Sports Complex] The Taylor County Board of County Commissioners is considering approval of a budget transfer from the General Fund-Contingency for the installation of a sign at Hodges Park and to replace the dedication sign at Glenn Ratliff Taylor County Sports Complex. The combined cost for both signs is $10,800. The sign at Hodges Park is a replacement for one destroyed by Hurricane Helene. The meeting date requested for the decision is May 19, 2026. [Plantation Road from SR-55(US19) to SR-20(US27); case G3K65 (Contract No.)] The Taylor County Board of County Commissioners is considering adopting resolutions to reflect unanticipated monies in various funds, including the SCOP Road Project (Plantation Road). The resolution for the SCOP Road Project Fund for the fiscal year ending September 30, 2026, includes adding $2,505,889 for SCOP Grant Revenue, $340,000 for Professional Services, $2,165,589 for Contractual Services, and $300 for Legal Advertising. A State-Funded Grant Agreement with the Florida Department of Transportation for the SCOP Road Project (Plantation Rd from SR-55(US19) to SR-20(US27)) has a term commencing upon execution and completion by 12/07/2028. The estimated project cost is $2,505,889.00, with the Department participating up to this amount. [case FWC Agreement #25017 (Monitoring), FWC Agreement #25016 (Construction)] The Taylor County Board of County Commissioners is considering adopting resolutions to reflect unanticipated monies in various funds, including the General Fund for the FWC Artificial Reef Monitoring and Construction Grants for the fiscal year ending September 30, 2026. The Artificial Reef Monitoring Grant is for $16,000, and the Artificial Reef Construction Grant is for $60,000. These are part of the Florida Artificial Reef Program. The FWC Agreement #25017 is for monitoring, and FWC Agreement #25016 is for construction. [Perry Foley Airport; case 3-12-0064-023-2025 (FAA AIP Project No.)] The Taylor County Board of County Commissioners is considering adopting resolutions to reflect unanticipated monies in the Airport Fund for FY26. This includes $34,500 for Airport Lease - land, designated for Airport Ops - Capital/Equipment, and $91,922 for FAA/Taxi Realign Design, designated for Contractual Services. An invoice for rental/leased space for 4,000 linear feet of inactive runway space and an access road from April 2025 to April 2026 was for $34,500. The meeting date requested for the decision is May 19, 2026. [case HM 25-10 (Contract #)] The Taylor County Board of County Commissioners is considering adopting resolutions to reflect unanticipated monies in the General Fund for the Volunteer Florida Grant (EM) in the amount of $200,000 for the fiscal year ending September 30, 2026. The grant is for Hurricane Helene and/or Hurricane Milton Recovery, with a contract total of $200,000 and a Grantee Share Total of $107,626. The grant period is December 1, 2025, to November 30, 2026. The budget transfer includes allocations for Salaries/Wages ($8,264), FICA/MED ($750), Petroleum Products ($6,000), Contractual Services ($121,986), Materials ($48,000), and Equipment <$5,000 ($15,000). Taylor County Board of County Commissioners approved budget amendments on May 19, 2026, for various funds. This includes an increase of $90,020 for the 911/PSAP Upgrade Project, an increase of $115,175 for the 911 Rural County Maintenance (Fall) Grant, and an allocation of $2,500 for the Spring Warrior Boat Ramp, including $1,000 for contractual services. Additionally, $5,000 was allocated for the FOOT Vault Generator System, $95,228 for the FDOT AVGAS Fuel Farm Project, and $50,000 for RIF/DOC Stein Coast Park Planning. A significant appropriation of $698,130 for Rehabilitation and $26,308 for Demolition/Construction related to SHIP Disaster - Idalia was approved. The Affordable Housing Fund received $100,000 cash brought forward, with $90,000 for Rehabilitation and $10,000 for Homebuyers Assistance. The Affordable Housing Fund (2022-2023 Grant) received $60,000 cash brought forward for Demolition/Construction. The General Fund budget was amended for Canal Dredging/SA Idalia with $83,533 cash brought forward for Capital/Infrastructure. The Restore Act/Stein BR Bypass and Hodges Pk Rehab received $115,009 for Contractual Services. The DOT/1st Ave & CR 361 Sidewalk Fund received $417,754 in LAP Grant Revenue, with $248,083 allocated for Contractual Services. The MSTU Fund received $7,392 for R&M - Auto. Budget shortfalls were noted for the CDBG Grant Fund ($83,787), Airport Fund ($38,400 for Taxiway design/construction), and General Fund. Taylor County Board of County Commissioners approved a budget amendment on May 19, 2026, adding $90,020 to the GENERAL FUND for the 911/PSAP Upgrade Project, with $90,020 allocated to Capital Outlay - Equipment. The agreement period is from execution or September 15, 2025, whichever is later, to June 30, 2026, with a maximum reimbursement of $90,019.80. Taylor County Board of County Commissioners approved a budget amendment on May 19, 2026, adding $115,175 to the GENERAL FUND for the 911 Rural County Maintenance (Fall) Grant, with $115,175 allocated to Capital Outlay - Equipment. The grant is for the fiscal year ending September 30, 2026. Taylor County Board of County Commissioners approved a budget amendment on May 19, 2026, allocating $2,500 to the Spring Warrior Boat Ramp. This includes $1,000 for Contractual Services, $500 for R&M Building & Grounds, $500 for General Operating Supplies, and $500 for Signs/Materials. This is for the fiscal year ending September 30, 2026. Taylor County Board of County Commissioners approved a budget amendment on May 19, 2026, allocating $5,000 to the Airport Fund for the FOOT Vault Generator System, specifically for Contractual Services. This is for the fiscal year ending September 30, 2026. Taylor County Board of County Commissioners approved a budget amendment on May 19, 2026, allocating $95,228 to the Airport Fund for the FDOT AVGAS Fuel Farm Project, specifically for Capital/Infrastructure. This is for the fiscal year ending September 30, 2026. Taylor County Board of County Commissioners approved a budget amendment on May 19, 2026, allocating $50,000 to the GENERAL FUND for RIF/DOC Stein Coast Park Planning. This includes $50,000 for Contractual Services. This is for the fiscal year ending September 30, 2026. Taylor County Board of County Commissioners approved a budget amendment on May 19, 2026, for SHIP Disaster - Idalia within the GENERAL FUND. This includes $698,130 for Rehabilitation and $26,308 for Demolition/Construction. The total amended budget for this item is $2,069,650. This is for the fiscal year ending September 30, 2026. Taylor County Board of County Commissioners approved a budget amendment on May 19, 2026, for the Affordable Housing Fund (2023-2024 Grant). This includes $100,000 cash brought forward, with $90,000 allocated for Rehabilitation and $10,000 for Homebuyers Assistance. This is for the fiscal year ending September 30, 2026. Taylor County Board of County Commissioners approved a budget amendment on May 19, 2026, for the Affordable Housing Fund (2022-2023 Grant). This includes $60,000 cash brought forward, allocated for Demolition/Construction. This is for the fiscal year ending September 30, 2026. Taylor County Board of County Commissioners approved a budget amendment on May 19, 2026, for Canal Dredging/SA Idalia within the GENERAL FUND. This includes $83,533 cash brought forward for Capital/Infrastructure. This is for the fiscal year ending September 30, 2026. Taylor County Board of County Commissioners approved a budget amendment on May 19, 2026, for the Restore Act/Stein BR Bypass and Hodges Park Rehab within the GENERAL FUND. This includes $115,009 for Contractual Services. This is for the fiscal year ending September 30, 2026. [1st Avenue South & CR361; case FPN 435683-3-58-01] Taylor County Board of County Commissioners approved a budget amendment on May 19, 2026, for the DOT/1st Ave & CR 361 Sidewalk Fund. This includes $417,754 in LAP Grant Revenue, with $248,083 allocated for Contractual Services. This is for the fiscal year ending September 30, 2026. A supplemental agreement (Supplemental No. 3, Contract No. G2V95) was executed on May 23, 2025, adding $248,083 for construction to the 1st Avenue South & CR361 Sidewalk project, which is 0.411 miles long. The total project cost is $875,377. [8999 US 19] Taylor County Board of County Commissioners approved a budget amendment on May 19, 2026, for the MSTU Fund, allocating $7,392 for R&M - Auto. This amendment reflects reimbursement received by the BCC for Taylor County Fire Rescue staffing provided at the Iron Horse Mud Ranch from October 9-11, 2025. This is for the fiscal year ending September 30, 2026. Taylor County Board of County Commissioners approved a budget amendment on May 19, 2026, to address a shortfall in the CDBG Grant Fund, reducing the budget by $83,787. This reduction impacts Demolition/Construction. This is for the fiscal year ending September 30, 2026. Taylor County Board of County Commissioners approved a budget amendment on May 19, 2026, to address a shortfall in the Airport Fund, reducing the budget by $38,400 for FOOT Design/Constr Taxiway, specifically for Capital/Infrastructure. This is for the fiscal year ending September 30, 2026. [108 North Jefferson Street, Suite 102, or P.O. Box 620, Perry, Florida 32348 (for bid submission); 201 East Green Street, Perry, Florida 32347 (for bid opening); case PO# 20261071] Taylor County is soliciting sealed bids for roadside right-of-way mowing. Bids are due by 4:00 PM on May 19, 2026, and will be opened at 6:05 PM on the same date. Bid documents can be obtained from the Clerk of Court. The County reserves the right to reject any or all bids. [Perry, Taylor County, Florida] Taylor County Board of Commissioners approved budget changes to amend the General Fund budget for the fiscal period ending September 30, 2026. The changes reflect a shortfall of monies for a particular purpose. The resolution was approved on May 19, 2026. [Perry-Foley Airport; case FDOT Grant Agreement #443552-3-94-26] Taylor County Board of County Commissioners will discuss the Florida Department of Transportation Grant Agreement #443552-3-94-26 and a resolution for the design and construction of the Taxiway Realignment Phase 2 Project at Perry-Foley Airport. The total estimated project cost is $6,250,000, with FDOT funding a maximum of $500,000 or 8% of the total project cost. The FAA requires airports to conform to a standard taxiway alignment system, and Perry-Foley Airport's taxiways are not in compliance with current FAA standards. [Perry-Foley Airport; case PFL0014389] This document is a Public Transportation Grant Agreement between the State of Florida Department of Transportation and Taylor County for the PERRY-FOLEY APT DESIGN & CONSTRUCT TAXIWAY REALIGNMENT PH2 project. The project involves design and construction for taxiway realignment, including various components such as excavation, paving, airfield lighting, signage, and drainage. The total financial assistance awarded is $6,250,000.00, with $5,625,000.00 from FAA funds, $500,000.00 from DPTO funds, and $125,000.00 from LF funds. The agreement outlines extensive terms and conditions for design, construction, insurance, indemnification, environmental compliance, and project management. Key requirements for contractors include being prequalified by the Department for work on state right-of-way, providing payment and performance bonds, and adhering to specific design and construction standards. Construction Engineering Inspection (CEI) services must be provided by a Department-prequalified consultant, separate from the design firm. The agreement specifies insurance requirements, including Commercial General Liability with limits of $1,000,000 per occurrence and $5,000,000 annual aggregate, and potentially Railroad Protective Liability Coverage if applicable. The Agency is responsible for all environmental compliance and obtaining necessary permits. The project must begin expenditures within one year of the agreement date, with potential for a one-year extension. No public comment is mentioned in this section. [Perry-Foley Airport; case 446364-1-94-26] Taylor County Board of County Commissioners is seeking approval for a Public Transportation Grant Agreement with the Florida Department of Transportation (FDOT) for the design and construction of a new hangar at Perry-Foley Airport. The project has an estimated total cost of $1,000,000, with FDOT providing a maximum of $500,000 (50% of the total project cost). The county is responsible for the remaining 50% match, which they are seeking through other grant funding sources due to fiscal constraints. FAA does not provide funding for hangars. The agreement is for the period through June 30, 2029. [Perry-Foley Airport/Perry, FL; case PFL0015721] This document is a Public Transportation Grant Agreement between the State of Florida Department of Transportation and Taylor County for the Design & Construction of a New Hangar at Perry-Foley Airport. The total financial assistance is $1,000,000.00, with $500,000.00 from the State and $500,000.00 in local matching funds. The project scope includes consultant and design fees, survey, geotechnical costs, permitting, construction inspection, material testing, mobilization, maintenance of traffic, erosion control, demolition, pavement work, drainage, utilities, power supplies, building construction (foundation, structure, roof, MEP, drainage, fire prevention), pavement marking, lighting, signage, fencing, landscaping, and security systems. The agreement outlines various terms and conditions related to construction standards, approvals, insurance, indemnification, and compliance with state and federal regulations. It specifies that the Agency (Taylor County) is responsible for hiring qualified consultants and contractors, obtaining necessary permits, and ensuring compliance with all applicable standards and laws. The Department of Transportation will issue a Notice to Proceed for the construction phase. The agreement also details requirements for payment and performance bonds, construction engineering inspection (CEI) services, and the submission of as-built plans and certifications upon completion. Specific clauses address work on the Department's right-of-way, environmental regulations, and hazard removal. The agreement is governed by Florida law, and the Department determines the forum and venue for disputes. The agreement was executed by James M. Knight, P.E., Urban Planning and Modal Administrator for the Department of Transportation, and representatives for Taylor County. This document pertains to a Grant Agreement between the State of Florida Department of Transportation and an unnamed Agency for aviation-related projects. It outlines numerous assurances and conditions the Agency must adhere to, covering areas such as airport zoning, consistency with local plans and airport master plans, financial planning, revenue expenditure, fee structures, public-private partnerships, economic nondiscrimination, air and water quality, operations and maintenance, federal funding eligibility, project implementation timelines, exclusive rights, airfield access, retention of rights and interests, consultant/contractor selection, planning projects, land acquisition, construction projects, and noise mitigation. It also includes program-specific terms for reporting on health care choices, geoengineering, weather modification, and energy policy goals. Additionally, it details contract payment requirements and audit requirements for state financial assistance. [203 Forest Park Dr, Perry, FL 32348; 1013 Riverside Dr, Steinhatchee, FL 32359] Taylor County Board of County Commissioners will consider approving guidelines and a budget for a Cold Weather Warming Center. The center will activate when temperatures drop to 27 degrees Fahrenheit or lower for 4 or more consecutive hours, factoring in wind chill. The primary location is Forest Capital Hall at 203 Forest Park Dr, Perry, FL 32348, with a secondary location in Steinhatchee Community at 1013 Riverside Dr, Steinhatchee, FL 32359. The budget is approximately $30,750 per site, covering deputy pay, county worker pay, background checks, supplies, and meals/snacks. Operations require a deputy and at least one county employee, with volunteers assisting. The center will operate from 6:30 PM with a registration window, closing by 8:30 AM the next morning unless extreme temperatures persist. No pets are allowed, except for service animals. [21239 Keaton Beach Drive, Keaton Beach, Taylor County, Florida] Taylor County Board of County Commissioners will consider approving a draft settlement agreement between the County and Ponchos Cantina & Grille, LLC, Ponchos 76, LLC, and Luis Alfonso Bautista Pulido. The agreement resolves disputes concerning permitting, construction, and operation of a business at 21239 Keaton Beach Drive, Keaton Beach, Taylor County, Florida. The County grants a variance for a setback encroachment of a pole barn structure and a floodplain management variance for restroom facilities to remain at ground level below the base flood elevation, subject to specific construction guidelines. Ponchos must submit engineered plans for floodplain compliance within 60 days and complete construction within 120 days of approval, or elevate/remove the restrooms. The agreement also addresses parking and food truck operations, acknowledging state preemption of certain regulations, and alcohol regulation, confirming the County's limited authority. Ponchos' engineer must certify the structure's design and construction compliance within 60 days. Upon approval of structural certification, Ponchos can commence business operations, including food, beverage, and alcohol service, subject to state law and ABT licensing. Both parties release claims against each other related to the disputes, contingent on the fulfillment of specified conditions within 180 days. [21239 Keaton Beach Drive] This document details a settlement agreement related to Poncho's Cantina & Grille, LLC and Ponchos 76, LLC, including exhibits for an 8COP license, ABT form, and a business operations plan for a property at 21239 Keaton Beach Drive, Keaton Beach, Taylor County, Florida. The business operations plan outlines a site layout with a pole barn, coffee truck, food truck, bar truck, outdoor seating, and restroom facilities. Separately, the Taylor County Board of County Commissioners is considering an Interlocal Agreement with the City of Perry for the distribution of local option gas tax proceeds. The agreement, effective January 1, 2027, and terminating December 31, 2031, allocates 70% of the tax proceeds to Taylor County and 30% to the City of Perry. The Board is recommended to approve this agreement on May 19, 2026. The document also provides general information on Florida's local option fuel tax ordinances and interlocal agreements.

Board:
Board of Commissioners Meeting
Date:
2026-05-19
Type:
Agenda_packet
Decision:
Consideration for approval of final payments, change order, grant applications, project awards, budget transfers, resolutions, and bid reception.
Address:
201 E. GREEN STREET (Administrative Complex), 212 Tippett Drive (Michael Barnes), 17886 Phelps Road (Sharon Phelps), 306 Folsom Place (Kristina and Robert Hugger), 203 Ivy Avenue (Randolph Copeland), Perry Foley Airport
Applicant:
Taylor County Board of County Commissioners, Michael Barnes, Sharon Phelps, Kristina and Robert Hugger, Randolph Copeland, Sadaytril Smith, Anderson Columbia, Jerry Walters Construction, Inc., JG Parker Enterprises, Inc.

Minutes

[106 El Dorado Drive, Perry, FL 32347 (Sadaytril Smith's home)] Taylor County Board of County Commissioners approved final payments for demolition and reconstruction of homes through the HHRP Program. Projects include Michael Barnes ($75,916.80), Sharon Phelps ($92,506.00), Kristina and Robert Hugger ($93,579.00), and Randolph Copeland ($64,396.80). A change order for rehabilitation of Sadaytril Smith's home was approved for $3,425.00. The board also approved the 2026 Airport Improvement Program and Airport Infrastructure Grant applications for the taxiway realignment project at Perry Foley Airport and recommended awarding the project to Anderson Columbia for $1,731,830.03, contingent on FAA funding. The McDaniel Road widening/resurfacing project and the 13th and Central USACE floodplain mitigation project were considered for award. Final payment for the courthouse parking lot cleaning, sealing, and restriping was approved for $11,308.00. Budget transfers for signs at Hodges Park and Glenn Ratliff Memorial Sports Complex were considered. Resolutions for unanticipated and shortfall monies in various funds were adopted. Bids for roadside right-of-way mowing were received. A public request regarding building permit #30830 was tabled. A quarterly update from the Taylor County Development Authority was provided. The board discussed recognition of service for Shirley Garvin and appointed three individuals to the Doctor Memorial Hospital Board of Directors. A request for speed humps at the end of CR-14 was discussed. Solid waste operations were discussed due to a full roll-off site. The board approved grant agreements and resolutions for the taxiway realignment phase 2 project and a new hangar at Perry-Foley Airport. A draft settlement agreement with Ponchos Cantina and Grill was approved. A draft interlocal agreement for the distribution of the 6-cent local option gas tax with the City of Perry was approved. [Perry Foley Airport, Perry, Florida] Taylor County Board of County Commissioners is seeking federal assistance for taxiway realignments at the Perry Foley Airport in Perry, Florida. The project is estimated to cost $1,404,261.61, with $1,334,048.53 in federal funding requested. The proposed project start date is July 1, 2026, and the end date is November 30, 2026. The application is for construction only. [108 Industrial Park Drive, Perry, FL 32347] Taylor County Board of County Commissioners is undertaking taxiway realignments at Perry Foley Airport, located at 108 Industrial Park Drive, Perry, FL 32347. The project involves removal of asphalt and base, grading, drainage, new base and asphalt, pavement markings, taxiway edge lighting, sodding, erosion control, and maintenance of traffic. The total project cost is estimated at $1,404,262, with $1,334,049 requested as Federal Share. The project will be publicly advertised and awarded to the lowest responsive bidder. AVCON, Inc. is providing bid and construction phase services for a fee of $99,800. A geotechnical subconsultant will provide material acceptance testing for $12,000, and a surveyor will provide an as-built survey for $8,000. The construction duration is estimated at 150 days to substantial completion and 180 days to final completion. [Perry Foley Airport] Taylor County Board of County Commissioners is applying for $406,000.00 in Airport Improvement Program (AIP) funds for Taxiway Realignments - Construction Only at Perry Foley Airport. The project is scheduled to start on July 1, 2026, and end on November 30, 2026. The application includes certifications regarding conflicts of interest and lobbying. No public comment is mentioned in this document. [108 Industrial Park Drive, Perry, FL 32347] This document outlines the application and approval process for federal assistance for airport improvement projects, specifically focusing on the Taxiway Realignments project at Perry Foley Airport. It details the project schedule, budget, and certifications required by the sponsor, Taylor County. The project involves the removal of asphalt and base, grading, drainage, installation of new base and asphalt, pavement markings, taxiway edge lighting, sodding, erosion control, and traffic maintenance. The total project cost is estimated at $427,368, with $406,000 in Federal Share requested and $21,368 in other shares. AVCON, Inc. is providing bid and construction phase services for a fee of $99,800, which includes subconsultant services for material testing and surveying. The project is scheduled for bid advertisement on March 18, 2026, bid opening on April 17, 2026, and award recommendation on April 29, 2026. Construction completion is estimated to be 180 days following the Notice to Proceed. [Perry Foley Airport] Taylor County Board of County Commissioners is seeking to undertake taxiway realignments at Perry Foley Airport. This project is part of the Airport Improvement Program (AIP). The project involves construction only. The sponsor has certified compliance with federal standards for project plans, specifications, procurement, and conflict of interest. Key dates and specific project numbers are not stated. [1st Avenue South & CR 361; case FPN 435683-3-58-01] Taylor County Board of County Commissioners is amending the budget for the DOT/1st Ave & CR 361 Sidewalk Fund for the fiscal year ending September 30, 2026. This amendment includes additional funding of $417,754 for LAP Grant Revenue and $412,534 for Contractual Services. The project involves the construction of a sidewalk on 1st Avenue South & CR 361, spanning 0.411 miles. A supplemental agreement #3 was executed on May 23, 2025, for this project, adding $248,083 in funding. The project is identified as FPN 435683-3-58-01. Taylor County Board of County Commissioners is amending the General Fund budget for the fiscal year ending September 30, 2026, to reflect unanticipated monies for the Restore Act/Stein BR Bypass project. This amendment includes $115,009 in revenue and $115,009 for Contractual Services. The project is related to Restore Act/Hodges Pk Rehab. Taylor County Board of County Commissioners is amending the General Fund budget for the fiscal year ending September 30, 2026, to reflect unanticipated monies for Canal Dredging/SA Idalia. This amendment includes $83,533 in revenue and $83,533 for Capital/Infrastructure and Rehabilitation. The project involves canal dredging. Taylor County Board of County Commissioners is amending the Affordable Housing Fund (2022-2023 Grant) budget for the fiscal year ending September 30, 2026. This amendment includes $60,000 in revenue and $60,000 for Demolition/Construction. The project is related to the SHIP Grant. Taylor County Board of County Commissioners is amending the Affordable Housing Fund (2023-2024 Grant) budget for the fiscal year ending September 30, 2026. This amendment includes $100,000 in revenue and $90,000 for Rehabilitation and $10,000 for Homebuyers Assistance. The project is related to the SHIP Grant. Taylor County Board of County Commissioners is amending the General Fund budget for the fiscal year ending September 30, 2026, for the SHIP Disaster - Idalia project. This amendment includes $724,438 in revenue and $698,130 for Rehabilitation and $26,308 for Demolition/Construction. The project is related to SHIP Disaster - Idalia. [Stein Coast Park] Taylor County Board of County Commissioners is amending the General Fund budget for the fiscal year ending September 30, 2026, for the RIF/DOC Stein Coast Pk Planning project. This amendment includes $50,000 in revenue and $50,000 for Contractual Services. The project is related to RIF/DOC Stein Coast Pk Planning. Taylor County Board of County Commissioners is amending the Airport Fund budget for the fiscal year ending September 30, 2026, for the FDOT AVGAS Fuel Farm Project. This amendment includes $95,228 for Capital/Infrastructure. The project is related to the FDOT AVGAS Fuel Farm Project. Taylor County Board of Commissioners approved budget amendments for the fiscal period ending September 30, 2026. These amendments involve adjustments to various funds, including the Airport Fund, General Fund, and CDBG Grant Fund, reflecting unanticipated monies or shortfalls for specific purposes. Specific projects include FDOT-AVGAS Fuel Farm improvements, FDOT-Vault Generator System, Spring Warrior Boat Ramp, 911/PSAP Upgrade Project, FAA/Taxi Realign Design, Airport Lease, FWC Artificial Reef Construction and Monitoring Grants, SCOP Road Project Plantation Road, and CDBG Housing Demolition/Construction. The total budget adjustments across these funds are not explicitly aggregated into a single figure but are detailed within their respective accounts. Taylor County Board of Commissioners approved a resolution to amend the budget for the fiscal period ending September 30, 2026, to include $5,000 for the FOOT Vault Generator System and $5,000 for Contractual Services related to it. This amendment affects the Airport Fund. Taylor County Board of Commissioners approved a resolution to amend the budget for the fiscal period ending September 30, 2026, to transfer funds for the Spring Warrior Boat Ramp project. This includes $2,500 for Contractual Services, $500 for R&M Bldg & Grounds, $500 for Gen Oper. Supplies, and $500 for Signs/Materials. This amendment affects the General Fund. Taylor County Board of Commissioners approved a resolution to amend the budget for the fiscal period ending September 30, 2026, to include $115,175 for the 911 Rural County Maintenance (Fall) Grant, specifically for Capital Outlay - Equipment. This amendment affects the General Fund. Taylor County Board of Commissioners approved a resolution to amend the budget for the fiscal period ending September 30, 2026, to include $90,020 for the 911/PSAP Upgrade Project, specifically for Capital Outlay - Equipment. This amendment affects the General Fund. Taylor County Board of Commissioners approved a resolution to amend the budget for the fiscal period ending September 30, 2026, to include $91,922 for FAA/Taxi Realign Design, specifically for Contractual Services. This amendment affects the Airport Fund. Taylor County Board of Commissioners approved a resolution to amend the budget for the fiscal period ending September 30, 2026, to include $200,000 for the Volunteer Florida Grant (EM), $8,264 for Salaries/Wages, $750 for FICA/MED, $6,000 for Petroleum Products, $121,986 for Contractual Services, $48,000 for Materials, and $15,000 for Equipment <$5,000. This amendment affects the General Fund. Taylor County Board of Commissioners approved a resolution to amend the budget for the fiscal period ending September 30, 2026, to include $34,500 for Airport Lease - land and $34,500 for Airport Ops - Capital/Equipment. This amendment affects the Airport Fund. Taylor County Board of Commissioners approved a resolution to amend the budget for the fiscal period ending September 30, 2026, to include $60,000 for FWC Artificial Reef Construction Grant, specifically for Contractual Services. This amendment affects the General Fund. Taylor County Board of Commissioners approved a resolution to amend the budget for the fiscal period ending September 30, 2026, to include $16,000 for FWC Artificial Reef Monitoring Grant, specifically for Contractual Services. This amendment affects the General Fund. [Plantation Rd from SR-55(US 19) to SR-20(US27)] Taylor County Board of Commissioners approved a resolution to amend the budget for the fiscal period ending September 30, 2026, for the SCOP Road Project Plantation Road. This includes $2,505,889 for SCOP Grant - Revenue, $340,000 for Professional Services, $2,165,589 for Contractual Services, and $300 for Legal Advertising. The project involves design, construction, and CEI for widening/resurfacing Plantation Road from SR-55 (US 19) to SR-20 (US 27). The total estimated project cost is $2,505,889.00. Taylor County Board of Commissioners approved a resolution to amend the budget for the fiscal period ending September 30, 2026, to reduce the CDBG Grant Fund budget by $83,787 for Housing Demolition/Construction. This amendment affects the CDBG Grant Fund. [case PO# 20261071] Taylor County Board of Commissioners is soliciting sealed bids for Roadside Right-of-Way Mowing. Qualified firms or individuals must submit bids by May 19, 2026, to the Clerk of Court. Bids will be opened on May 19, 2026. Bid documents can be obtained from the Clerk of Court. The County reserves the right to reject any or all bids and is not bound to award based on the lowest price. A local business preference of five percent may be assigned. [Perry Foley Airport; case Financial Management Project No: 443552-3-94-26] Taylor County Board of County Commissioners and the State of Florida Department of Transportation (FDOT) have entered into a Public Transportation Grant Agreement for the Perry Foley Airport Taxiway Realignment Project Phase 2. The project has an estimated cost of $6,250,000, with FDOT contributing a maximum of $500,000 (8% of eligible costs). The agreement covers the design and construction of the taxiway realignment. The term of the agreement is from the effective date through March 31, 2029. The document outlines detailed terms and conditions for financial assistance, project responsibilities, payment, auditing, and contract requirements. [Perry-Foley Airport; case PFL0014389] This document outlines the terms and conditions of a Public Transportation Grant Agreement between the State of Florida Department of Transportation and an unnamed Agency. It details requirements for contractors and subcontractors, including prohibitions on using discriminatory vendors, ensuring contractor responsibility, and prohibiting lobbying with grant funds. It also mandates the use of E-Verify for employment eligibility verification. A specific project is described: PERRY-FOLEY APT DESIGN & CONSTRUCT TAXIWAY REALIGNMENT PH2, located at Perry-Foley Airport in Perry, Florida. The project scope includes various construction elements for taxiway rehabilitation/reconstruction, such as excavation, pavement work, lighting systems, signage, and drainage. The total financial assistance for this project is $6,250,000.00, comprising $500,000.00 in State funds, $125,000.00 in Local funds, and $5,625,000.00 in Federal funds. The agreement specifies requirements for design and construction, including the need for a Notice to Proceed before construction begins, contractor prequalification, and the provision of Construction Engineering Inspection (CEI) services by a Department-prequalified consultant. It also details insurance requirements, indemnification clauses, and environmental compliance responsibilities. The Agency is responsible for obtaining permits and ensuring compliance with various federal, state, and local regulations, as well as Department standards. [Perry Foley Airport; case 446364-J-94-26] Taylor County Board of County Commissioners and the State of Florida Department of Transportation (FDOT) have formalized an agreement for the Design & Construction of a New Hangar at Perry Foley Airport. The project has an estimated cost of $1,000,000, with FDOT funding a maximum of $500,000 (50% of eligible costs). The agreement is for the period from the Effective Date through June 30, 2029. The project involves aviation grant program funding. [Perry-Foley Airport; case PFL0015721] This document is a Public Transportation Grant Agreement between the State of Florida Department of Transportation and an Agency for the Design & Construction of a New Hangar (PFL0015721) at Perry-Foley Airport in Perry, FL. The total financial assistance awarded is $1,000,000.00, with $500,000.00 allocated for Environmental/Design/Construction phases. The agreement outlines various terms and conditions, including audit requirements, restrictions on convicted or discriminatory vendors, prohibitions on lobbying with funds, and requirements for E-Verify employment eligibility checks. It also details indemnification, insurance requirements, and specific terms for construction, including design standards, right-of-way usage, and inspection services. The Agency is responsible for compliance with all applicable laws and regulations, including environmental and safety standards. The project scope includes consultant and design fees, survey, permitting, construction inspection, demolition, pavement, drainage, utilities, building construction, and security systems. [21239 Keaton Beach Drive, Keaton Beach, Taylor County, Florida; case Poncho's v. Taylor County] This document outlines a settlement agreement between Taylor County and Ponchos Cantina & Grille, LLC, Ponchos 76, LLC, and Luis Alfonso Bautista Pulido regarding property at 21239 Keaton Beach Drive, Keaton Beach, Taylor County, Florida. The agreement grants a variance for a setback encroachment of a structure and a floodplain management variance for restroom facilities, subject to specific construction guidelines and engineer-certified plans. It also addresses parking and food truck operations, acknowledging state preemption of certain regulations, and confirms the county's lack of ordinances prohibiting alcohol sales. The county agrees to certify that no zoning ordinance prohibits alcohol sales in the Mixed Use Urban Development zoning district. Ponchos must provide structural certification for the building. Upon county approval of structural certification, Ponchos can commence business operations, including food, beverage, and alcohol service, regardless of pending floodplain compliance measures. The agreement includes mutual releases of claims related to past disputes, with conditions precedent for the releases to take effect. This document is an Interlocal Agreement between Taylor County, Florida, and the City of Perry, Florida, establishing a distribution formula for the proceeds of a local option gas tax. The agreement specifies that Taylor County will receive 70% of the tax proceeds, and the City of Perry will receive 30%. This agreement is set to take effect on January 1, 2027, and will terminate on December 31, 2032. It also outlines requirements for providing distribution proportions to the State of Florida Department of Revenue and filing the agreement with the Clerk of the Circuit Court. [Webb Lane in the Sugar Hill Estates area, Taylor County, Florida; case K & L Investments, LLC v. Taylor County] This document is a settlement agreement between Taylor County, Florida, and K & L INVESTMENTS, LLC, concerning Parcel 09595-850 located on Webb Lane in the Sugar Hill Estates area, Taylor County, Florida. The dispute centers on road frontage requirements imposed by Taylor County Ordinance 2006-14, which K & L contends should not apply to their property that predates the ordinance. The agreement requires the County to execute and record a 'Notice of Vested Rights' declaring that the property has vested rights to residential development and is not subject to the road frontage requirements. Upon recording, the County will process building permit applications for the property without regard to these requirements, provided other regulations are met. The agreement includes mutual releases of claims, with conditions precedent for the releases to become effective, including the County's execution of the notice and K & L's recording of it within 60 days. [Webb Lane] This document is a Notice of Vested Rights related to a Settlement Agreement between K & L Investments, LLC and Taylor County. The property in question, Parcel 09595-850 on Webb Lane in the Sugar Hill Estates area, has a vested right to residential development that predates Taylor County Ordinance 2006-14, which imposed road frontage requirements. Therefore, these requirements will not be applied to this property, and a building permit will not be denied solely on that basis. This vested right runs with the land for K & L Investments, LLC and its successors. The settlement agreement also states that the prevailing party in any enforcement action is entitled to recover attorney's fees and costs. The agreement itself is confidential except as required by law or court order.

Board:
Board of Commissioners Meeting
Date:
2026-05-19
Type:
Minutes
Decision:
Approved (final payments, change order, grant applications, project award recommendation, courthouse parking lot improvements, budget transfers, resolutions, settlement agreement, interlocal agreement), Considered (McDaniel Road widening/resurfacing, 13th and Central USACE floodplain mitigation, sign installation), Received Bids (roadside right-of-way mowing), Tabled (building permit #30830, cold weather warming center guidelines), Discussed (solid waste operations, speed humps at CR-14)
Address:
106 El Dorado Drive, Perry, FL 32347 (Sadaytril Smith's home)
Applicant:
Michael Barnes, Sharon Phelps, Kristina and Robert Hugger, Randolph Copeland, Sadaytril Smith, Anderson Columbia, not stated (McDaniel Road widening/resurfacing), not stated (13th and Central USACE floodplain mitigation), not stated (Hodges Park and Glenn Ratliff Memorial Sports Complex), not stated (Perry Foley Airport taxiway realignment phase 2), not stated (Perry Foley Airport new hangar), Ponchos Cantina and Grill, City of Perry

Amended Agenda

This document is a suggested agenda for the Taylor County Board of County Commissioners meeting on May 4, 2026. It outlines various items for consideration, including grant applications, contract extensions, budget amendments, and public hearings for specific projects. Key business opportunities for contractors include a milling project on Bethea Road, bids for McDaniel Road widening/resurfacing, and a Request for Proposals (RFP) for the Taylor County Community Transportation Coordinator. Additionally, there is a proposal modification with WSP for the Dekle Beach Canal System dredging design and a notice of site dedication for the Taylor County Sports Complex rehabilitation. The agenda also includes a request to replace two air handler units at the County Jail and consideration of a final development order and mining permit for Alan Roberts Mine.

Board:
Board of Commissioners Meeting
Date:
2026-05-04
Type:
Agenda
Address:
201 E. GREEN STREET, PERRY, FLORIDA

Amended Agenda Packet

[201 E. Green Street, Perry, Florida] Taylor County Board of County Commissioners meeting on May 4, 2026, at 6:00 PM at 201 E. Green Street, Perry, Florida. Agenda items include approval of grant applications, budget amendments, contract extensions for debris cleanup and management, and consideration of various proposals and appointments. Key items for contractors include bids for McDaniel Road widening/resurfacing and a Request for Proposals (RFP) for the Taylor County Community Transportation Coordinator.

Board:
Board of Commissioners Meeting
Date:
2026-05-04
Type:
Agenda_packet
Address:
201 E. Green Street, Perry, Florida

Minutes

This document contains minutes from the Taylor County Board of County Commissioners meeting on Monday, May 4, 2026. Key actions included approving the agenda, minutes, and invoices. Several agenda items involved contract extensions and budget approvals. A significant portion of the meeting focused on a proposed one-half cent sales surtax for school capital outlay, which was approved for a referendum. The board also reviewed and approved grant applications and contract renewals. The meeting concluded with adjournments.

Board:
Board of Commissioners Meeting
Date:
2026-05-04
Type:
Minutes
Decision:
Approved
Address:
201 E. GREEN STREET

Agenda

This document is a suggested workshop agenda for the Taylor County Board of County Commissioners meeting on Tuesday, April 28, 2026, at 6:00 PM, held at the Taylor County Administrative Complex, 201 E. Green Street, Perry, Florida. The agenda includes discussions on group health insurance, the GP/Foley draft permit, Hodges Park, and budget priorities. It also provides instructions for public comment, including how to join the meeting via conference line and procedures for addressing the board. Information on accessibility accommodations and public record inspection is also included.

Board:
Board of Commissioners Workshop
Date:
2026-04-28
Type:
Agenda
Address:
201 E. GREEN STREET, PERRY, FLORIDA

Agenda Packet

Taylor County Board of County Commissioners meeting on April 28, 2026, at 6:00 PM at 201 E. Green Street, Taylor County Administrative Complex. The agenda includes discussions on the Group Health Insurance Plan, the GP/Foley Draft Permit, Hodges Park, and Budget Priorities. Public comment is allowed for 3 minutes per agenda item. A notice is given regarding the need for a verbatim record for appeals. The meeting will be accessible via conference line 1-917-900-1022 with access code 32347#. Agenda Item 1: THE BOARD TO DISCUSS GROUP HEALTH INSURANCE PLAN. Submitted by LaWanda Pemberton, County Administrator. Attachment: 2026 TCB OCC Board Meeting. Agenda Item 2: THE BOARD TO DISCUSS THE GP/FOLEY DRAFT PERMIT. Submitted by LaWanda Pemberton, County Administrator. Attachments: None. Agenda Item 3: THE BOARD TO DISCUSS HODGES PARK. Submitted by COMMISSIONER FEAGLE. Attachment: Hodges Park Rehabilitation Project Timeline April 18. Agenda Item 4: THE BOARD TO DISCUSS BUDGET PRIORITIES. Submitted by LaWanda Pemberton, County Administrator. Attachments: None.

Board:
Board of Commissioners Workshop
Date:
2026-04-28
Type:
Agenda_packet
Address:
201 E. GREEN STREET, TAYLOR COUNTY ADMINISTRATIVE COMPLEX

Minutes

This document contains minutes from a Taylor County Board of County Commissioners meeting on April 28, 2026, and related presentations. Key discussions included the Group Health Insurance Plan renewal, a draft permit for Foley Cellulose LLC, the status of Hodges Park, and budget priorities. The meeting also covered a presentation on insurance plan options by Acentria, including a recommended dual-option plan and an HRA plan. Additionally, the document includes a timeline for the Hodges Park project and a discussion on funding and delays. A separate letter from the Taylor County Board of County Commissioners to the Florida Department of Environmental Protection provides comments on the Foley Cellulose LLC draft permit, requesting a comprehensive closure plan and a startup plan for the wastewater treatment system. The Board also recommended a stormwater management plan for hurricane season. The document also details the timeline and funding issues for the Hodges Park project, highlighting significant delays and multiple amendment requests for extensions and budget increases.

Board:
Board of Commissioners Workshop
Date:
2026-04-28
Type:
Minutes
Decision:
Meeting was held, discussions and recommendations were made.
Address:
201 E. GREEN STREET, TAYLOR COUNTY ADMINISTRATIVE COMPLEX
Applicant:
Taylor County Board of County Commissioners

NOTICE

Notice regarding Taylor County Board of County Commissioners' attendance at a Florida Department of Environmental Protection public meeting concerning the Georgia-Pacific/Foley Cellulose Industrial Wastewater Permit. The meeting will be held at Forest Capital Hall, 203 Forest Park Drive, Perry, FL 32348, on April 23, 2026, from 4:00 PM to 7:00 PM. No official board action will be taken at this event. Additionally, notice is given pursuant to Florida Statutes 286.0105 that more than one county commissioner may be in attendance at the 2022 Florida Association of Counties Legislative and Innovation Day in Tallahassee, Florida.

Board:
Multiple Commissioner Attendance
Date:
2026-04-23
Type:
Other
Address:
203 Forest Park Drive, Perry, FL 32348
Applicant:
Florida Department of Environmental Protection

Amended Agenda

This document is a suggested agenda for the Taylor County Board of County Commissioners meeting on Tuesday, April 21, 2026, at 6:00 PM, located at 201 E. Green Street, Taylor County Administrative Complex. The agenda includes multiple items relevant to contractors and trades, such as awarding construction contracts, approving design contracts, extending grant agreements for renovations, considering proposals for grant administration, approving generator installation, advertising for mosquito control services, reviewing development applications, and receiving bids for airport and flood mitigation projects. Specific projects include the Artificial Reefs Construction Project, Safety Complex Building architectural design, Hodges Park renovation, Perry-Foley Airport taxiway realignments and a new hangar, McDaniel Road Reconstruction & Resurfacing Project, and a USACE Floodplain Mitigation Drainage Project in the Steinhatchee Community. The agenda also includes a public hearing for a school capital outlay sales surtax referendum and discussions on various county services and agreements. Public comment is permitted for three minutes per agenda item.

Board:
Board of Commissioners Meeting
Date:
2026-04-21
Type:
Agenda
Address:
201 E. GREEN STREET, PERRY, FLORIDA

Amended Agenda Packet

Taylor County Board of County Commissioners is considering awarding a contract to Walter Marine for the Artificial Reefs Construction Project. The project involves the fabrication, transport, and deployment of 36 marine matrix reef concrete modules, each 5'x5'x5'. Walter Marine submitted the sole bid of $59,998.92. The project is 100% funded by a $60,000 grant from the Florida Fish and Wildlife Conservation Commission (FWC) under Agreement No. 25016. Walter Marine has extensive experience in artificial reef construction and holds multiple patents. The company addressed concerns regarding workers' compensation insurance by stating they will not use subcontractors and their existing P&I/Jones Act and general liability insurance covers all project activities, as has been accepted by other Florida counties. The Bid Review Committee recommends awarding the contract to Walter Marine as a cost-effective, responsive bidder. [201 East Green Street, Perry, FL 32347 (for Taylor County Board of County Commissioners); case Agreement No. LW719, Amendment No. 3] Taylor County Board of County Commissioners is seeking approval for Amendment No. 3 to Agreement No. LW719 with the Florida Department of Environmental Protection. This amendment extends the grant agreement for the renovation of Hodges Park to November 1, 2026, with all close-out documents due by December 31, 2026. The original grant amount was $200,000, funded through the FDEP Land and Water Conservation Fund Program and a Restore Act POT 3 Grant. The renovation scope includes restrooms, picnic pavilions, a new parking area with permeable pavers, a playground with shade coverings, beach improvements, and a sand volleyball area. Grants staff are working on design/build bid documents with The Balmoral Group. The amendment also updates several attachments related to terms and conditions, work plans, and audit requirements. [21275 Keaton Beach Dr., Perry, FL 32348-0119; case LW719] This document outlines the special terms and conditions for the Hodges Park at Keaton Beach Renovation project, funded by the Land and Water Conservation Fund Program (LWCF). The project is a development project located at 21275 Keaton Beach Dr., Perry, FL 32348-0119. The total estimated project cost is $400,000, with a maximum grant award of $200,000 and a required grantee match of $200,000 (50%). The project completion date is November 1, 2026. Key tasks include developing commencement documentation and a cost analysis, followed by the renovation of playground facilities, beach access, restrooms, parking, a picnic facility, sand volleyball court, nature study signage, security lighting, a fishing pier boardwalk, sidewalk, and native landscaping. The agreement is cost reimbursement, with invoicing occurring after deliverable approval. Advance pay is not authorized. Equipment purchases and land acquisition are not funded. Retainage of up to 10% is permitted. The Grantee may subcontract work without prior consent, except for fixed-price subcontracts. The work will not be performed on State-owned land. The document also details various compliance requirements, including those related to unauthorized employment, convicted vendors, discriminatory vendors, antitrust violators, lobbying, record keeping, audits, conflict of interest, and compliance with federal, state, and local laws. It also specifies insurance requirements for the Grantee, including Commercial General Liability, Commercial Automobile, and Workers’ Compensation. [108 North Jefferson Street, Suite 102, Perry, Florida 32347; case I0183 (CDBG-MIT), MS045 (CDBG-DR), MS047 (CDBG-DR)] Taylor County Board of County Commissioners is seeking proposals for Grant Administration services for three Community Development Block Grant (CDBG) projects: DMH Hardening of Facility ($2,500,000), Steinhatchee Road Paving Project ($1,050,000), and Public Safety Complex-Emergency Shelter Project ($4,969,425). The services include environmental reviews and permitting. The administrative fees will be paid 100% from CDBG grant funds, with up to 5% of grant funds allowed for these services. This document outlines the Request for Proposals (RFP) process for Taylor County, Florida, specifically for Grant Administration Services. It details the timeline for proposal submission, evaluation, and award by the County Commission. Key requirements for respondents include adherence to legal and insurance stipulations, such as Errors and Omissions insurance ($2,000,000), Commercial General Liability ($1,000,000/$2,000,000 aggregate), Comprehensive Automobile Liability ($500,000), Worker's Compensation, and Umbrella/Excess Liability ($5,000,000). The document also covers terms related to public records, equal opportunity, non-collusion, drug-free workplace, indemnification, and domestic preference. It emphasizes that all awarded firms must comply with federal, state, and local laws, and that the County reserves the right to reject any or all responses. The document does not specify a particular project, address, or size, but rather the general procurement process for grant administration services. [Perry-Foley Airport; case G2V39] Taylor County Board of County Commissioners is considering an extension to Grant Contract G2V39 for Ready Power, LLC, to complete the installation of an 80KW generator for the electrical vault at Perry-Foley Airport. The contract is extended to December 30, 2026, due to long lead times for the generator and transfer switches. Preliminary site work is complete, with transfer switches scheduled to ship May 20, 2026, and the generator on August 25, 2026. The project is 100% grant funded by a FDOT Aviation Grant. [Taylor County, Florida; case RFP-Mosquito Control Services] Taylor County Board of County Commissioners is soliciting bids for comprehensive integrated mosquito management (IMM) services countywide. Services include adulticiding, larviciding, mosquito surveillance and monitoring, and public education and outreach. The contract term is one year with options to renew for two additional one-year periods. Bids are due by 4:00 PM on a date to be determined, and will be opened at the Taylor County Administrative Complex. The County reserves the right to reject any or all bids and award to the bidder offering the best overall service. Taylor County is an AA/EOE employer and requires compliance with Executive Order 11246. The County Administrator is LaWanda Pemberton, and Gary Wambolt is the Environmental Services Director. [Taylor County, Florida; case Task Assignment 2026-1] Taylor County Board of County Commissioners is considering a Task Work Order with North Florida Professional Services (NFPS) for development/engineering review of development applications and plans. This is under a Continuing Professional Services Agreement dated March 24, 2026. NFPS will review land development applications for consistency with the County's Comprehensive Plan and Land Development Code, coordinate additional professional reviews, conduct research, prepare reports, and attend meetings. Compensation is based on a flat fee schedule detailed in Exhibit A, which includes fees for DRI reviews, Comprehensive Plan amendments, zoning amendments, special exceptions, conditional use permits, variances, and subdivision/platting. The County Administrator is LaWanda Pemberton. [McDaniel Road from Wright Road at its South end to Pisgah Road at its North end] Taylor County Board of County Commissioners is considering a proposal from North Florida Professional Services, Inc. (NFPS) for Construction Engineering and Inspection (CEI) services for the McDaniel Road Reconstruction & Resurfacing Project. The project involves widening and resurfacing approximately 1.3 miles of McDaniel Road from Wright Road to Pisgah Road, including safety modifications, drainage improvements, pavement markings, and signage. The anticipated project duration is 220 days. Funding is from a FDOT Reimbursement Agreement. There is a concern that remaining funding may be insufficient to complete the project as proposed. The Board is recommended to approve NFPS's proposal for CEI services. [Perry-Foley Airport] Taylor County Board of County Commissioners will receive bids for the Taxiway Realignments Project at Perry-Foley Airport. The project has an estimated cost of $3,500,000, with $3,325,000 anticipated from the FAA and $175,000 from FDOT. The County will proceed once FAA funding is received. The realignment is a requirement of the FAA. [Taylor County; case Ordinance No. 2026-] Taylor County Board of County Commissioners will hold a public hearing on the passage of a proposed ordinance to call a referendum election for the approval of a one-half cent School Capital Outlay Sales Surtax. The referendum election is scheduled for November 3, 2026, in conjunction with the general election. If approved by voters, the surtax will be levied for ten years, from January 1, 2027, to December 31, 2036, to fund school facilities, safety, security, and technology infrastructure. [Steinhatchee Community, Taylor County, Florida] Taylor County Board of County Commissioners will receive bids for the USACE Floodplain Mitigation Drainage Project in the Steinhatchee Community, Taylor County, Florida. Tonya Benziger, Cast and Company, will discuss a benefit performance with the Board, scheduled for May 9, 2026. [Within the County] Taylor County Board of County Commissioners will consider approval of License and Hold Harmless Agreements for polling locations for the 2026 Election Cycle. [Taylor County] The Supervisor of Elections will inform Board Members of a special legislative session to redraw state congressional lines, which may affect Taylor County's congressional district representation and number, and could involve redistricting costs. [Taylor County] Taylor County Board of County Commissioners will consider the renewal of the agreement with Nabors, Giblin and Nickerson for Planning Board Attorney services. The current agreement has expired and has an allowance for a one-year extension. The agreement covers attending Planning Board meetings, advising on Land Development Regulations and the Comprehensive Plan, and researching planning questions. The renewal term would be through March 21, 2027. [Taylor County] Taylor County Board of County Commissioners will discuss the Sheriff's Office budget. [Steinhachee Community, Taylor County, Florida] Taylor County Board of County Commissioners will receive an update on the USACE Floodplain Mitigation Drainage Project - Steinhachee Community, Taylor County, Florida. The update is from Chet Thompson, Due Diligence Associates, regarding draft permit recommendations. [Former Georgia-Pacific Foley Mill site, Taylor County, Florida] The Board will receive a Foley Cellulose Draft Permit Update and Public Meeting Recommendations from Chet Thompson, Due Diligence Associates. The update concerns the permitting review and progress for the former Georgia-Pacific mill site. Key points include a draft permit to limit maximum daily discharge to 12 million gallons, potential use of D-002 if pipeline easement issues are resolved, and additional expertise engaged for groundwater protection and water quality impact evaluation. Public comments are due by April 30, 2026. The permit renewal is for a five-year period and involves expanded groundwater monitoring and ambient monitoring in the Fenholloway River. The closure and decommissioning activities are anticipated to take three to five years. Public input is encouraged through oral and written comments. [Perry-Foley Airport; case 443552-3-94-26] Taylor County Board of County Commissioners will consider approval of a Public Transportation Grant Agreement with the Florida Department of Transportation (FDOT) for $500,000. This grant is for the design and construction of the Taxiways Realignment Phase 2 Project at Perry-Foley Airport. The total estimated project cost is $6,250,000, with funding anticipated from the FAA ($5,625,000) and FDOT ($500,000). The county will be responsible for the remaining $125,000. The agreement term is from the effective date through March 31, 2029. [Perry-Foley Airport/Perry, FL; case PFL0014389] This document is a Public Transportation Grant Agreement between the State of Florida Department of Transportation and Taylor County for the PERRY-FOLEY APT DESIGN & CONSTRUCT TAXIWAY REALIGNMENT PH2 project. The project involves design and construction for taxiway realignment at the Perry-Foley Airport in Perry, FL. The total financial assistance awarded is $6,250,000.00, with $5,625,000.00 from FAA funds. The scope of work includes consultant and design fees, survey, geotechnical costs, permitting, construction inspection, material testing, mobilization, maintenance of traffic, erosion control, demolition, excavation, embankment, subgrade preparation, base course, surface course, joint construction, pavement enhancement/reconstruction, airfield lighting, signage, drainage, stormwater structures, fencing, gates, and sodding. The Agency is responsible for hiring qualified consultants and contractors, ensuring compliance with all applicable standards and regulations, and obtaining necessary permits. Construction on Department right-of-way requires specific procedures, including Department prequalified contractors and CEI services. The Agency must obtain a Notice to Proceed for the construction phase before commencing work. Public comment is not mentioned in this section of the document. [Perry-Foley Airport; case 446364-1-94-26] Taylor County Board of County Commissioners approved a Public Transportation Grant Agreement with the State of Florida Department of Transportation for the Design and Construction of a New Hangar at Perry-Foley Airport. The project has an estimated cost of $1,000,000, with FDOT providing a $500,000 grant and Taylor County providing a 50% match of $500,000. The agreement is for the period ending June 30, 2029. [Perry Foley Airport; case 443552-3-94-26] The Taylor County Board of County Commissioners adopted a resolution to enter into a Public Transportation Grant Agreement with the State of Florida Department of Transportation for the Design & Construction of the Taxiway Realignment Phase 2 at Perry-Foley Airport. The project has an estimated cost of $6,250,000, with FDOT funding a maximum of $500,000, and Taylor County eligible for 8% funding. The resolution authorizes the Chairman to execute the agreement. [Perry-Foley Airport; case PFL0015721] This document is a Public Transportation Grant Agreement between the State of Florida Department of Transportation and Taylor County for the Design & Construction of a New Hangar PFL0015721 at Perry-Foley Airport in Perry, FL. The total financial assistance awarded is $1,000,000.00, with $500,000.00 from the State and $500,000.00 in local matching funds. The project scope includes design and construction elements such as consultant fees, survey, geotechnical costs, permitting, construction inspection, demolition, pavement, drainage, utilities, building structure, MEP, fire prevention, pavement marking, lighting, signage, fencing, gates, landscaping, and security systems. The agreement outlines various terms and conditions for contractors, including prohibitions on using funds for lobbying, requirements for E-Verify, and insurance stipulations. It also details responsibilities for design, construction, and maintenance, including the need for a Notice to Proceed before construction begins. The agreement specifies that the Agency must hire a Department-prequalified contractor for construction on Department right-of-way and that Construction Engineering Inspection (CEI) services will be provided by a Department-prequalified consultant firm. The project must adhere to various state and federal standards, including the Florida Green Book and MUTCD. The agreement also includes provisions for indemnification, environmental regulations, and the use of state funds. [Perry Foley Airport; case 446364-1-94-26] Taylor County Board of County Commissioners is entering into a Public Transportation Grant Agreement with the State of Florida Department of Transportation for the Design & Construction of a New Hangar at the Perry Foley Airport. The project has an estimated cost of $1,000,000, with FDOT funding a maximum of $500,000. The agreement formalizes the arrangement between the parties. [Ash Street from Jefferson Street to Johnson Stripling Road, and along Johnson Stripling Road to the School network sidewalk.; case 435683-5-58-01, 435683-5-68-02] Taylor County Board of County Commissioners is considering approval of a Local Agency Program (LAP) Agreement with the Florida Department of Transportation (FDOT) for project oversight and construction of a sidewalk along Ash Street and Johnson Stripling Road. The project is funded by FDOT through the Transportation Alternatives Program, with $789,084 for construction and $11,836 for administration. The construction contractor is to be selected by December 8, 2026, and the project is to be completed by July 30, 2028. The agreement has no financial obligations for Taylor County. [CR136(ASH ST) FROM N. JEFFERSON ST TO CR2130(JOHNSON STRIPLING RD) AND CR2130(JOHNSON STRIPLING RD) FROM E ASH ST TO HIGH SCHOOL ENTRANCE; case 435683-5-58-01 & 435683-5-68-02] This document is a Local Agency Program Agreement between the State of Florida Department of Transportation and Taylor County for a sidewalk project. The project involves constructing sidewalks on CR136 (Ash St) from N. Jefferson St to CR2130 (Johnson Stripling Rd) and on CR2130 (Johnson Stripling Rd) from E Ash St to the High School Entrance. The total project cost is $800,920.00, with $789,084.00 allocated for construction and $11,836.00 for Construction Engineering and Inspection (CEI). Federal funds are the primary source of funding for construction and CEI. Taylor County is responsible for managing a CEI contract procured by the Department. Key dates include: Right-of-Way certification by 06/08/2026, construction contract letting by 12/08/2026, and construction completion by 06/30/2028. The agreement outlines various requirements for contractors, including compliance with federal and state laws, nondiscrimination policies (Title VI, ADA), insurance requirements, and indemnification clauses. Disadvantaged Business Enterprises (DBEs) are to be provided opportunities to participate. The agreement also details termination, suspension, and payment procedures. Taylor County will manage a CEI contract procured by the Department.

Board:
Board of Commissioners Meeting
Date:
2026-04-21
Type:
Agenda_packet
Decision:
Recommended for award
Address:
201 East Green Street, Perry, FL 32347 (for Taylor County Board of County Commissioners)
Applicant:
Walter Marine

Minutes

Taylor County Board of County Commissioners approved the awarding of the Artificial Reefs Construction Project contract to Walter Marine for a sum not to exceed $59,998.92. The contract is effective upon execution and terminates August 30, 2026. [Site of the current Supervisor of Elections Building] Taylor County Board of County Commissioners approved the architectural design contract with Clemons Rutherford & Associates, Inc. for the New Taylor County Public Safety Complex. The project is located on the site of the current Supervisor of Elections Building and has an initial budget of $9,000,000. The scope includes a Special Needs Building, Vehicle and Equipment Storage Building, and Fleet Maintenance. [Hodges Park; case LW719] Taylor County Board of County Commissioners approved Amendment No. 3 to Agreement No. LW719 between Florida Department of Environmental Protection and Taylor County to extend the grant agreement for the renovation of Hodges Park. The extension is until November 1, 2026, with all close-out documents due by December 31, 2026. [case CDBG] Taylor County Board of County Commissioners approved the Request for Proposals (RFP) for Community Development Block Grant (CDBG) MIT and DR Grant Administration. This administration will include the preparation of environmental reviews and permitting documents. [Perry-Foley Airport; case G2V39] Taylor County Board of County Commissioners approved the extension to Grant Contract G2V39 for the construction and installation of an 80KW generator for the electrical vault at Perry-Foley Airport. The contract is extended to December 30, 2026. Taylor County Board of County Commissioners approved the proposal package and advertisement for Mosquito Control Services. Taylor County Board of County Commissioners approved a task work order with North Florida Professional Services for development/engineering review of development applications and plans. [McDaniel Road] Taylor County Board of County Commissioners approved a construction engineering and inspection services proposal from North Florida Professional Services, Inc. for the McDaniel Road Reconstruction & Resurfacing Project. [Perry-Foley Airport] Taylor County Board of County Commissioners received bids for the Taxiway Realignments Project at Perry-Foley Airport. Bids received: Anderson Columbia ($1,406,191.55 base, $325,638.48 alternate 1), Curt's Construction ($1,651,542.62 base, $291,725.00 alternate), and CW Roberts Contracting ($1,941,365.75 base, $409,880.00 alternate). A bid committee was appointed to study the bids and make recommendations. [case 26-01] Taylor County Board of County Commissioners held a public hearing and adopted Ordinance 26-01 to call a referendum election for a one-half cent school capital outlay sales surtax. Public comment included support for the surtax from David Paulk, opposition due to burden on citizens from Dan Simmons, and clarification on the tax amount from Lacey Moneyhan. The board voted to put the referendum on the ballot for public vote. [Steinhatchee Community, Taylor County, Florida; case USACE] Taylor County Board of County Commissioners received bids for the USACE Floodplain Mitigation Drainage Project in Steinhatchee Community. Bids received: Extreme Land Restoration ($2,213,902.79) and Anderson Columbia ($2,157,229.33). A bid committee was appointed to study the bids and make recommendations. [Forest Capital Hall] Tonya Benzinger of Cast and Company invited the Board to a fundraiser event on May 9, 2026, at Forest Capital Hall for 'Punchlines for Property Lines' to raise money for a new building. [Not stated (Polling locations)] Taylor County Board of County Commissioners approved license and hold harmless agreements for polling locations for the 2026 election cycle. Two polling locations changed: Blue Creek moved to Taylor Water and Sewer Office, and United Steel Workers moved to New Home Baptist Church. Dana Southerland, Supervisor of Elections, informed the Board of a special legislative session to redraw state congressional lines. If new lines are drawn, new voter registration cards will need to be sent, potentially costing $1,300.00. Taylor County Board of County Commissioners decided to readvertise for a Planning Board Attorney after discussion. Mike Hunter, Planning Board Member, suggested the attorney only be needed on an as-needed basis to save money. Taylor County Board of County Commissioners discussed the Sheriff's Office budget. Commissioner Newman noted the budget was 54% expended by the end of March and suggested negotiating with the Sheriff's Office. Commissioners Feagle, Moody, and Demps favored sticking to the original decision. Chairman English suggested the spending might be reckless. Thomas Edwards II, Pisgah Road, commented on the undersheriff's vehicle request and questioned the need for an undersheriff. Taylor County Board of County Commissioners received a draft permit update and public meeting recommendations for Foley Cellulose from Chet Thompson, Due Diligence Associates. Final comments are due by April 30, 2026. Taylor County Board of County Commissioners discussed current wildfires and county preparedness. Dan Cassel, County Fire Chief, reported a drought index of 600 on a scale of 700-750, 12 wildfire calls this year, and no need for a burn ban at this time due to community responsibility. The Board motioned to authorize the County Fire Chief to declare a burn ban if needed. [Perry-Foley Airport; case 443552-3-94-26] Taylor County Board of County Commissioners approved the Florida Department of Transportation (FDOT) Public Transportation Grant Agreement and Resolution for $500,000 for the design and construction of the Taxiways Realignment Phase 2 Project at Perry-Foley Airport. Financial Project Number: 443552-3-94-26. [Perry-Foley Airport; case 446364-1-94-26] Taylor County Board of County Commissioners approved the Florida Department of Transportation (FDOT) Public Transportation Grant Agreement and Resolution for $500,000 for the design and construction of a new hangar at Perry-Foley Airport. Funds are not expected until 2028, and a match is required. Financial Project Number: 446364-1-94-26. [Ash Street and Johnson Stripling Road] Taylor County Board of County Commissioners approved the FDOT Construction Phase Local Agency Program Agreement to construct a sidewalk along Ash Street and Johnson Stripling Road. Taylor County Board of County Commissioners discussed informational items: Grant Coordinator out until June, Purchasing Agent transferred to Building Department, Code Enforcement position open, softball field completed, and canal cleanup started. Mark Viola, on behalf of the newspaper, presented the Board with a progress addition of the newspaper on Taylor County. [201 East Green Street, Perry, FL 32347 (for Taylor County Board of County Commissioners); case LW719] This document contains two distinct agreements related to public works projects in Taylor County, Florida. The first is an Owner-Architect Agreement between Clemons, Rutherford & Associates, Inc. and an unnamed Owner, detailing compensation structures and services for a project located in Taylor County, Florida. The second is a Continuation of a Standard Grant Agreement (Agreement No. LW719) between the Florida Department of Environmental Protection and Taylor County Board of County Commissioners for the Hodges Park at Keaton Beach Renovation project. This grant agreement has been amended to extend the project completion date to November 1, 2026, and the expiration date to December 31, 2026. The scope of the renovation includes playground with shade covering, beach access, restroom facilities, parking, a new picnic facility, sand volleyball court, nature study area, security lighting, fishing pier, boardwalk, sidewalk, and native landscaping. [case LW719] This document outlines the terms and conditions for a cost reimbursement agreement, specifically detailing requirements for documentation, cost eligibility, insurance, termination, and compliance with federal and state laws. It specifies that no equipment purchases or land acquisitions will be funded under this agreement. A key requirement is a fifty percent (50%) non-federal match from the Grantee, totaling $200,000.00. The project is identified as the Hodges Park at Keaton Beach Renovation. The agreement also details provisions for subcontractors, including insurance requirements and compliance with various federal acts like the Build America, Buy America Act (BABA) if applicable. It emphasizes the importance of proper record-keeping, audits, and adherence to laws regarding unauthorized employment and scrutinized companies. [21275 Keaton Beach Dr., Perry, FL 32348-0119; case LW719] Taylor County Board of Commissioners is undertaking the Hodges Park at Keaton Beach Renovation project, located at 21275 Keaton Beach Dr., Perry, FL 32348-0119. The project involves the renovation of a playground with shade covering, beach access, restroom facilities, parking, installation of a new picnic facility, sand volleyball court, nature study signage, security lighting, fishing pier boardwalk, sidewalk, and native landscaping. The total estimated project cost is $400,000.00, with a maximum grant award of $200,000.00 and a required grantee match of $200,000.00. The project completion date is November 1, 2026. The project is funded through the Land and Water Conservation Fund Program (LWCF). [Perry-Foley Airport; case G2V39 / 436767-2] Taylor County is seeking an amendment to a Public Transportation Grant Agreement (Contract Number: G2V39, Financial Management Number: 436767-2) with the Florida Department of Transportation to extend the agreement end date from September 30, 2026, to December 31, 2026. The extension is requested due to long lead times for a generator and transfer switches for the installation of a new airfield backup generator for the Vault at Perry-Foley Airport. [case TASK ASSIGNMENT 2026-1] Taylor County has entered into a Task Assignment (2026-1) with North Florida Professional Services Inc. for professional planning services related to the review and evaluation of land development applications. This is pursuant to a Continuing Professional Services Agreement dated March 24, 2026. The services include ensuring consistency with the County's Comprehensive Plan and Land Development Code, reviewing application materials, coordinating professional reviews, conducting research, preparing reports, and attending meetings. The compensation is based on lump sum fees outlined in Exhibit A. [McDaniel Road; case CEI25 NFPS-01] Taylor County has issued a Task Order (CEI25 NFPS-01) to North Florida Professional Services, Inc. for Construction Engineering and Inspection (CEI) services for the McDaniel Road Widening and Resurfacing project. The work is authorized under an Agreement dated March 18, 2025. The compensation is on a Time Basis Method with a Not-to-Exceed amount of $186,300.00. The completion time is 220 calendar days from execution. [McDaniel Road] Taylor County has entered into a Task Order with North Florida Professional Services, Inc. for Construction Engineering Inspection (CEI) services for the resurfacing of McDaniel Road. The contract amount for these services is $186,300.00, with an estimated total project cost of $2,835,000.00 for CEI. The contract duration is 1210 calendar days. [case Ordinance No. 2026-___] Taylor County Board of County Commissioners has called for a referendum election on November 3, 2026, to approve a one-half cent School Capital Outlay Sales Surtax. If approved, the surtax will be levied for ten years, from January 1, 2027, to December 31, 2036, to fund school facility acquisition, construction, reconstruction, renovation, remodeling, and improvements, including safety, security, and technology infrastructure. Proceeds must remain in Taylor County and be shared with eligible charter schools. The surtax will be subject to independent citizens' oversight and audits. [Perry-Foley Airport; case Financial Project No: 443552-3-94-26] Taylor County Board of County Commissioners and the State of Florida Department of Transportation (FDOT) have entered into a Public Transportation Grant Agreement for the Design & Construction of the Taxiway Realignment Phase 2 at Perry-Foley Airport. The estimated total project cost is $6,250,000, with FDOT funding a maximum of $500,000 (8% of eligible cost). The agreement term is through March 31, 2029. The financial project number is 443552-3-94-26. [Perry-Foley Airport; case PFL0014389] This document outlines the terms and conditions of a Public Transportation Grant Agreement between the State of Florida Department of Transportation and Taylor County for the PERRY-FOLEY APT DESIGN & CONSTRUCT TAXIWAY REALIGNMENT PH2 project. The project involves design and construction for taxiway realignment at the Perry-Foley Airport. The total financial assistance awarded is $6,250,000.00, with $500,000.00 from State funds, $125,000.00 from Local funds, and $5,625,000.00 from Federal funds. The scope of work includes design fees, survey, geotechnical costs, permitting, construction inspection, material testing, mobilization, maintenance of traffic, erosion control, demolition, excavation, embankment, subgrade preparation, base course, surface course, pavement enhancement or reconstruction, pavement markings, airfield lighting system, signage improvements, drainage, stormwater structures, fencing and gates, and sodding. The agreement details requirements for procurement, E-Verify, indemnification, insurance (including Commercial General Liability and Railroad Protective Liability if applicable), environmental regulations, and contractor/subcontractor obligations. Specific construction requirements include adherence to Department standards, obtaining a Notice to Proceed for construction, and the use of Department-prequalified contractors and consultants for design and inspection services. The Agency is responsible for all project costs not covered by the grant and for ensuring compliance with all applicable laws and regulations. [Perry-Foley Airport; case PFL0015721] Taylor County Board of County Commissioners has adopted a resolution to enter into a Public Transportation Grant Agreement with the State of Florida Department of Transportation (FDOT) for the Design & Construction of a New Hangar at Perry-Foley Airport. The estimated project cost is $1,000,000, with FDOT funding a maximum of $500,000 (50% eligible cost). The agreement term is through June 30, 2029. [Perry-Foley Airport] This document is a Public Transportation Grant Agreement between the State of Florida Department of Transportation and an unnamed Agency for the Design & Construction of a New Hangar at Perry-Foley Airport (PFL0015721). The total financial assistance awarded is $1,000,000.00, allocated to Environmental/Design/Construction phases, with $500,000.00 from State funds and $500,000.00 from Local funds. The project scope includes consultant and design fees, survey, geotechnical costs, permitting, construction inspection, material testing, mobilization, maintenance of traffic, erosion control, demolition, pavement, drainage, utilities, power supplies, building construction, pavement marking, lighting, signage, fencing, landscaping, and security systems. The agreement details extensive requirements for audits, financial reporting, contractor qualifications, insurance, indemnification, and compliance with various state and federal regulations. It also specifies that construction work must be performed by a Department-qualified contractor and that Construction Engineering Inspection (CEI) services will be provided by a Department-qualified consultant firm, which cannot be the same as the Engineer of Record. The project is located at Perry-Foley Airport in Perry, Florida. [Ash Street from Jefferson Street to Taylor County High School, and Johnson Stripling Road from Ash Street to the high school entrance; case FPN: 435683-5-58-01, FPN: 435683-5-68-02] Taylor County Board of County Commissioners authorized the Chairperson to enter into a Local Agency Program Agreement for the Ash Street and Johnson Stripling Road Sidewalk Project. This agreement involves project oversight and construction of a sidewalk along Ash Street from Jefferson Street to Taylor County High School, and along Johnson Stripling Road from Ash Street to the high school entrance. The agreement has no financial obligations for Taylor County. The project is estimated to cost $789,084, with the Department of Transportation participating up to this amount, including Federal-aid funds. The project completion deadline is June 30, 2028. [CR136(ASH ST) FROM N. JEFFERSON ST TO CR2130(JOHNSON STRIPLING RD) AND CR2130(JOHNSON STRIPLING RD) FROM EASH ST TO HIGH SCHOOL ENTRANCE; case 435683-5-58-01 & 435683-5-68-02] This document is a Local Agency Program Agreement between the State of Florida Department of Transportation and Taylor County for a sidewalk project. The project involves constructing sidewalks along CR136 (Ash St) from N. Jefferson St to CR2130 (Johnson Stripling Rd) and along CR2130 (Johnson Stripling Rd) from Ash St to the High School Entrance. The total construction cost is $789,084.00, with an additional $11,836.00 for Construction Engineering and Inspection (CEI), totaling $800,920.00. The project is funded by federal-aid highway funds (CFDA No. 20.205). Key dates include: Right-of-Way certification by 06/08/2026, construction contract letting by 12/08/2026, and construction completion by 06/30/2028. The agreement outlines various compliance requirements for the Recipient (Taylor County) and its contractors, including audit requirements, nondiscrimination policies (Title VI, ADA), public records compliance, and insurance mandates. Contractors must comply with FHWA Form 1273 and are subject to specific restrictions regarding convicted or discriminatory vendors. The agreement also details maintenance obligations for the constructed improvements.

Board:
Board of Commissioners Meeting
Date:
2026-04-21
Type:
Minutes
Decision:
Approved
Address:
Site of the current Supervisor of Elections Building
Applicant:
Walter Marine (Contractor)

Mira los negocios reales detrás de estos números

Obtén los registros reales, con direcciones y directivos, gratis por 7 días. Sin tarjeta de crédito.

Comienza tu prueba gratis