a. The proposed development will be connected to
City Commission · 2026-05-11 · agenda_item
A proposal is under review to amend the Comprehensive Plan and rezone land to Mobile Home Park (MHP) zoning. The development is planned to connect to central water and sewer utilities. The proposed RV park is considered a commercial use and will not produce students, thus not impacting school concurrency. The conceptual plan appears to comply with Land Development Regulations, including standards for Floor to Area ratio, open space, and setbacks. An environmental assessment found no floodplains, wetlands, or protected species on the site. This project is currently under review by the City Commission. The development would likely involve site preparation, utility connections, and construction of resort residential units. Contractors, suppliers, and service providers are encouraged to engage early to understand the project scope as plans develop before bids and permits are finalized.
- Floor to Area ratio
- 0.3
- Open Space Dedication
- 15 %
- Front setback
- 25 feet
- Rear setback
- 15 feet
- Side setback
- 10 feet
- Site topography high
- 68 ’
- Site topography low
- 50 ’
Industries that could win this work
- General Contractor
- Site Prep, Grading & Hardscape
- Plumbing
- Electrical
- HVAC & Climate Control
- Utilities (Sub)
- Engineering & Architecture
- Real Estate Development
- Building & Industrial Supply
Follow this across meetings
Board
City CommissionApplicants and firms
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.
Crea tu cuenta