NewBiz Alert Reporte sectorial de Florida
August 2026 Utilities new business activity in Florida
Published
Por NewBiz Alert, con base en Florida Division of Corporations filings, Florida Department of Environmental Protection funding notices, and the five water management districts. Cómo lo hicimos.
Florida is rebuilding the systems that carry its water and its power. Hillsborough County cleared borrowing of up to $650 million for a new water campus, the state put more than $74 million into a regional wastewater plant in Newberry and about $47.5 million into new water supply wells in Fort Myers, and JEA is lifting transmission lines 40 feet higher over the St. Johns River so bigger ships can reach Blount Island. At the same time two water management districts are holding drought orders in place across much of north and central Florida. Work on that scale runs through contractors, and new utility-sector businesses are registering with the state to take it.
A newly registered utility business leans on a predictable set of local suppliers. It needs general-liability and workers-comp insurance, performance and payment bonding, bookkeeping and prevailing-wage payroll help, heavy equipment rental, pipe and fitting suppliers, pump and valve distributors, locating and surveying services, materials testing labs, traffic control, and fleet service. Certified plant operators and laboratory testing are a standing cost for any system that treats water. That is why new formations cluster in the regions where treatment plants, mains, and transmission work are heaviest.
The counts below show where new utility businesses are registering, by region, over the last 30, 90, and 365 days. Under them is the recent news utility owners are watching, from a $650 million water campus to a federal order keeping an Orlando generator online, with the specific businesses each one creates work for. The state rules and the official pages live at the bottom, in Utility Resources.
Esta edición se escribió antes de que sus conteos se guardaran junto con ella, así que los números con los que se publicó no están registrados. Los conteos actuales de esta industria están en su página principal.
Las noticias
Recent utility news in Florida
New developments utility owners are watching right now, with the real date of each and the specific businesses it creates work for. This month spans water mains and wastewater plants, a wellfield expansion, transmission and generation, and a $650 million utility financing. Two of the items are water shortage orders, one from each of two water management districts, because a deep rainfall deficit is the single biggest thing shaping Florida water utilities this year.
- Tampa Bay (Gulf Coast)· 2026-07-16
Hillsborough clears up to $650 million in borrowing for its One Water Campus
At its July 15, 2026 meeting, the Hillsborough County Board of County Commissioners adopted a resolution for the issuance of a Utility Revenue Note not to exceed $650,000,000 to finance capital improvement projects for the county's utilities system, specifically the One Water Campus project in South County. The county said the project will improve South County's drinking water supply and pressure. A financing package this size funds years of contract work: underground utility and pipe-laying crews, concrete and rebar, process piping and pump installers, electrical and instrumentation firms, and site work companies. Support businesses take on work too, like equipment rental, hauling, surveying, materials testing, traffic control, and bonding and contractor insurance. Financing the campus now gives fast-growing South Hillsborough a stronger drinking water supply instead of a shortfall later.
- Northeast Florida (First Coast)· 2026-07-27
JEA raises power lines over the St. Johns River so bigger ships can reach Blount Island
On July 27, 2026 JEA said helicopter operations began on the next step of raising the electric transmission lines that span the St. Johns River at Fulton Cut. Crews are installing new wiring between Blount Island on the north side and Reed Island on the south side. The lines go from 185 feet to 225 feet, giving 205 feet of operational clearance. JEA said the added clearance is needed for larger ships to safely reach JAXPORT's Blount Island Marine Terminal. Transmission work of this kind runs through specialized firms: line construction and stringing crews, helicopter and aerial lift services, structural steel and tower erectors, foundation and drilled shaft contractors, high-voltage electricians, and surveying. Support businesses gain too, like rigging, crane service, marine access, safety and flagging, and equipment rental. Higher lines let larger cargo ships reach Jacksonville, protecting port trade that JEA said supports 15,000 regional jobs.
- Northeast Florida (First Coast)· 2026-06-30
JEA board approves electric, water, and sewer rate changes for October 1
On June 30, 2026 the JEA Board of Directors voted to adjust electric, water, and sewer rates to help address rising operating expenses and support infrastructure investments needed to meet Northeast Florida's continued growth. The changes take effect for residential and commercial customers October 1. JEA said the monthly effect depends on usage, ranging from a 1.6% to 3.1% electric increase for residential customers, with typical residential water and sewer bills up between 4.3% and 7.5%. Rate action tied to infrastructure spending signals a bigger capital program ahead, which is what pipeline, plant, and substation contractors bid on. It also raises demand for energy audit and efficiency firms, HVAC and insulation contractors, submetering companies, and plumbing repair shops that customers call to hold their bills down. Funding the system now keeps electric and water service reliable for more than one million customers across four Northeast Florida counties.
- Central Florida (I-4 Corridor & Space Coast)· 2026-06-05
Federal order keeps an Orlando power plant unit available through the summer
The Orlando Utilities Commission said on June 5, 2026 that the U.S. Department of Energy issued emergency Order No. 202-26-26 on June 4, 2026, under section 202(c) of the Federal Power Act, directing OUC to ensure that Unit 1 at the Stanton Energy Center in Orlando remains available to operate. The order runs from June 4, 2026 through September 1, 2026. OUC said it will not be able to place the unit into extended cold shutdown at this time and will fully comply with the order. Keeping a generating unit available instead of shutting it down extends contracts for plant maintenance and outage crews, boiler and turbine service firms, industrial electricians and instrumentation techs, welders and pipefitters, water treatment chemical suppliers, and fuel handling and hauling companies. Industrial cleaning, scaffolding, and safety services stay on site too. Holding the unit in service protects generating capacity for Central Florida through the highest demand months of the year.
- Central Florida (I-4 Corridor & Space Coast)· anunciado 2026-06-10
More than $7.9 million moves an Orlando neighborhood from septic to sewer
On June 10, 2026 the Florida Department of Environmental Protection said its Division of Water Restoration Assistance provided more than $7.9 million toward a North Pine Hills Road project in Orlando, through the Wastewater Grant Program and the Springs and Watershed Restoration Program. About 95 properties are converted to central sanitary sewer, which is expected to reduce nitrogen loading to the Wekiwa Spring and Rock Springs Basin Management Action Plan area. A septic-to-sewer conversion is direct work for underground utility contractors, sewer lateral and tie-in crews, directional drilling firms, septic tank abandonment and pumping companies, plumbers, restoration and paving contractors, and landscape and sod crews. Surveying, locating, and traffic control firms support every block of it. Taking 95 septic systems offline cuts nitrogen reaching Wekiwa Spring, one of Central Florida's best known springs.
- Central Florida (I-4 Corridor & Space Coast)· anunciado 2026-07-31
Water district finishes rebuilding the Wysong-Coogler structure on the Withlacoochee River
The Southwest Florida Water Management District announced on July 31, 2026 that it completed improvements to the Wysong-Coogler structure on the Withlacoochee River between Citrus and Sumter counties. The work replaced the structure's air bladders, installed larger air flow pipes, and added several other enhancements to streamline future maintenance. The self-service boat lock, which had been out of operation for several years, has reopened and now operates much faster. Water control structure work is a niche that new firms can enter: mechanical and hydraulic system installers, welders and fabricators, marine and in-water construction crews, concrete repair specialists, coatings and corrosion contractors, and controls and telemetry technicians. Diving, dewatering, and crane services support the job. A working structure and boat lock restore river navigation and give the district better control of flows during a deep rainfall deficit.
- North Central Florida (Gainesville & Ocala)· anunciado 2026-06-18
State puts more than $74 million into a regional wastewater plant in Newberry
On June 18, 2026 the Florida Department of Environmental Protection said it helped fund the Newberry regional wastewater treatment plant with more than $74 million through the Clean Water State Revolving Fund and the Water Quality Improvement Grant program. DEP said the project advances wastewater treatment and helps meet the environmental goals of the Santa Fe Basin Management Action Plan area. Florida State Senator Stan McClain, Congressman Chad Johnson, Newberry Mayor Tim Marden, and Archer Mayor Fletcher J. Hope attended. A regional treatment plant is a multi-year job for process mechanical contractors, concrete and structural crews, pump and blower installers, electrical and SCADA integrators, pipe fitters, and force main and collection system builders. Once it runs, it needs certified plant operators, laboratory testing, chemical supply, and biosolids hauling on a standing basis. Regional treatment replaces older systems in the Santa Fe basin and gives small north Florida towns capacity to grow.
- North Central Florida (Gainesville & Ocala)· 2026-07-14
North Central Florida water district extends its watering limits to the end of the year
The Suwannee River Water Management District governing board voted on Tuesday, July 14, 2026 to extend its Modified Phase II Water Shortage Order, Board Order 26-004, until December 31, 2026, and the district announced it the next day, July 15. Established lawns stay on a one-day per week landscape irrigation schedule, and irrigation shall not occur between 10 a.m. and 4 p.m. The district said the rainfall deficit was slightly more than 18 inches at the end of June and groundwater conditions hover around the 12th percentile. There are no irrigation restrictions for microsprays, drip irrigation, hand watering, or use of reclaimed water. The exemptions point the work: irrigation contractors converting spray zones to drip and microspray, reclaimed water hookup crews, leak detection and meter service firms, well drillers and pump repair shops, and rainwater and cistern installers. Landscape companies that replant with low-water species gain steady jobs. Holding irrigation to one day a week protects the aquifer and the spring flows that north Florida communities and farms depend on.
- Northwest Florida (Panhandle & Capital)· anunciado 2026-05-21
Pensacola area utility starts a new water main on Perdido Key Drive
The Emerald Coast Utilities Authority said on May 21, 2026 that construction would begin Tuesday, May 26, 2026 on the installation of a 12 inch ductile iron water main within the south right-of-way of Perdido Key Drive, starting about 1,300 feet east of the Flora-Bama. Roberson Underground is the contractor. ECUA expected the work to finish before the July 4 weekend, using shoulder closures with no roadway closures anticipated. A main installation is bread-and-butter work for new underground utility contractors: pipe-laying and tapping crews, ductile iron and fitting suppliers, boring and open-cut firms, hydrostatic testing and disinfection services, and driveway and asphalt restoration crews. Traffic control, locating, surveying, and equipment rental businesses support the job. A larger main improves water pressure and fire flow on a barrier island that fills with visitors every summer.
- Northwest Florida (Panhandle & Capital)· anunciado 2026-07-15
Florida municipal utilities take the 2026 public power reliability awards
The Florida Municipal Power Agency announced on July 15, 2026 that 18 municipal electric utilities received Florida Public Power Reliability Awards, honoring their achievements in delivering reliable electricity to their customers. The City of Tallahassee Electric and Gas Utility took a Duration Award, given for cutting outage time by 10% or more. Beaches Energy Services, JEA, Gainesville Regional Utilities, Kissimmee Utility Authority, and the Orlando Utilities Commission were among the other named winners. Reliability results come from spending: vegetation management and line clearing crews, pole inspection and replacement contractors, underground conversion and cable injection firms, smart meter and sensor installers, and outage management software vendors. New tree service, line construction, and utility locating firms bid this work every year. Shorter outages keep Panhandle homes and businesses running through storm season and lower the cost of every service interruption.
- Southwest Florida· anunciado 2026-05-13
Fort Myers gets about $47.5 million to add up to 12 new water supply wells
On May 13, 2026 the Florida Department of Environmental Protection said it provided approximately $47.5 million toward a Fort Myers wellfield expansion. The funding includes $34.8 million from the Drinking Water State Revolving Fund supplemental appropriation for Hurricanes Fiona and Ian and $12.7 million from the Resilient Florida program. The project installs up to 12 new source water wells with backup power generation systems, to enhance resiliency and reliability during weather emergencies. A wellfield expansion is direct work for well drillers, pump and motor installers, raw water main and transmission pipe crews, generator and switchgear contractors, electrical and controls integrators, and site and access road builders. Hydrogeology consultants, water quality labs, and permitting help are needed before the first well is drilled. Backup power on new wells keeps Fort Myers drinking water flowing through the storms that knocked the system out before.
- Tampa Bay (Gulf Coast)· 2026-06-23
Extreme water shortage limits across the Tampa Bay region hold through October
On June 23, 2026 the Southwest Florida Water Management District extended its Modified Phase III "Extreme" Water Shortage through Oct. 1, 2026. The restrictions apply to all of Citrus, DeSoto, Hardee, Hernando, Hillsborough, Manatee, Pasco, Pinellas, Polk, Sarasota and Sumter counties, plus portions of Charlotte, Highlands and Lake counties. All residents, including those on private wells, stay on one-day-per-week watering with strict watering hours, and aesthetic fountains are limited to four hours a day. The district reported a 13.7 inch regional rainfall deficit when Modified Phase III was declared. A long shortage order moves utility and property-owner money toward leak detection and line repair crews, meter and AMI installers, irrigation retrofit and controller companies, reclaimed water connection contractors, and backflow testers. Landscape firms that convert turf to low-volume irrigation, and well and pump repair shops, pick up steady work. Coordinated limits across 11 counties stretch a shrinking supply through the dry season instead of draining it early.
- Southeast Florida (Gold Coast, Treasure Coast & Keys)· 2026-07-30
Construction finishes on a stormwater treatment area for the St. Lucie River and Indian River Lagoon
On July 30, 2026 the South Florida Water Management District marked completion of construction on the Indian River Lagoon-South C-23/C-24 Stormwater Treatment Area, part of the Comprehensive Everglades Restoration Plan. It covers over 2,560 acres with 4,750 acre-feet of storage, 43,900 feet of perimeter levee and 13,200 feet of interior levee, and 19 individual culverts within the treatment area. It treats water flowing to the St. Lucie River Estuary and the southern portion of the Indian River Lagoon. Treatment areas at this scale need earthwork and levee builders, culvert and water control structure installers, pump station mechanical and electrical crews, telemetry and monitoring technicians, and aquatic vegetation planting and maintenance firms. Surveying, geotechnical testing, and environmental monitoring companies stay engaged for years. Cleaner water reaching the St. Lucie Estuary protects the Indian River Lagoon, home to more than 4,300 species of plants and animals.
- Southeast Florida (Gold Coast, Treasure Coast & Keys)· 2026-07-21
State and Army Corps sign an agreement to speed Everglades reservoir work
On July 21, 2026 the South Florida Water Management District and the U.S. Army Corps of Engineers signed a first-of-a-kind agreement to advance construction of key Everglades restoration projects in South Florida. The district said the agreement ensures federal funding will go to the state for projects that line up with completion of the Everglades Agricultural Area Reservoir in 2029, and that those projects include state construction of the final EAA Reservoir component, a seepage management pump station, and the Blue Shanty Flow Way Project. Pump station and flow way construction runs through heavy civil contractors, large-diameter pipe and gate installers, structural concrete crews, industrial electrical and controls firms, and dewatering and earthmoving companies. Materials testing, surveying, and environmental compliance consultants are needed on every phase. Storing and cleaning water south of Lake Okeechobee reduces damaging discharges to the estuaries and sends more water toward Florida Bay.
Y entonces
Qué significa para ti
New utility businesses form where the systems are being built and rebuilt. The projects on the news list, from the One Water Campus in south Hillsborough to the Newberry wastewater plant, the Fort Myers wellfield, and the Fulton Cut transmission crossing, are years of contract work for pipe crews, pump and process mechanical firms, high-voltage electricians, and the labs and testing companies behind them. As those jobs go out to bid, new firms register to take them, and each one buys insurance, bonding, bookkeeping, and equipment on day one.
The drought is the other half of the story. Two water management districts are holding shortage orders into the fall across much of north and central Florida, and both carve out microsprays, drip irrigation, hand watering, and reclaimed water. That pushes money toward leak detection, meter work, irrigation retrofits, and reclaimed water hookups instead of new lawn systems. Demand for those services tends to show up right after a district extends an order, in the counties the order names.
Metodología
Cómo contamos
- We count each business by the date it registered with the state, so this shows new business formation, not the current number of utility businesses.
- State records post about 2 weeks behind, so the last week or two will keep rising as more filings arrive.
- This industry is a narrow slice on purpose. It covers the businesses that supply and operate water, wastewater, electric, and gas systems, not the general construction firms that sometimes work on them.
- Water and wastewater treatment plant operators are certified by the state, and public water systems are regulated by Florida DEP, so a system that starts serving customers is traceable soon after it forms.
- Counts cover active Florida businesses and update daily.
Fuente de licencias estatales: Florida DEP, Division of Water Resource Management.
Preguntas frecuentes
- Where are the most new utility businesses forming in Florida?
- This report ranks every Florida region by new utility businesses and shows if activity is heating up or slowing down.
- Who regulates water and wastewater systems in Florida?
- Florida DEP regulates public water systems that serve 25 or more people for at least 60 days a year, or 15 or more service connections, and its Domestic Wastewater Program works with wastewater utilities on treatment. The five water management districts issue the water use and environmental resource permits.
- Why do this month's items include water shortage orders?
- Two water management districts extended water shortage orders through the summer and fall of 2026, covering much of north and central Florida. Those orders change what utilities and property owners spend money on, so they matter to the businesses that serve them.
- Do I have to call before digging on a utility job?
- Sunshine 811 is the statewide notification center. Contact it before digging and member utility companies mark their lines, pipes, or cables near the job site at no cost. Underground lines are hit about 100 times a day in Florida.
- Where does this data come from?
- The formation counts come from official Florida business-registration records. We pull every new filing, sort it by industry and region, and update daily. We count a business by the date it registered with the state.
- Can I see the actual businesses?
- Yes. You get the real filings, with business names, addresses, and officers, free for 7 days, with no credit card required. Start a free 7 day trial to see them.
Referencia
Utility Resources
The standing resources that govern Florida utilities, starting with the statewide programs and associations, then the local utility, authority, cooperative, and water management district for each region. This is the rulebook, not the news. Check it to see the resources a new utility business uses, or send a new operator here.
A nivel estatal
Statewide rule: Florida DEP regulates any public water system that provides water to 25 or more people for at least 60 days each year, or that serves 15 or more service connections, through its Source and Drinking Water Program. Its Domestic Wastewater Program works with wastewater utilities on treatment. A small system that crosses those thresholds needs certified operators, laboratory testing, monitoring and reporting help, and engineering support, which is standing work for the firms that serve them.
Statewide practice: before any digging in Florida, contact Sunshine 811 and member utility companies will mark their lines, pipes, or cables near the job site. It is a free service. Every underground utility, landscape, fence, pool, and site work business builds the locate request into its schedule, and private utility locating firms handle the lines a public locate does not cover.
- LicenciasFlorida DEP, Division of Water Resource Management
DEP water and wastewater programs
The state division responsible for implementing the laws that protect the quality of Florida's drinking water, ground water, rivers, lakes, estuaries, and wetlands. It runs the Source and Drinking Water Program for public water systems and the Domestic Wastewater Program.
- AsociaciónFlorida Rural Water Association (FRWA)
Florida Rural Water Association
A nonprofit, non-regulatory professional association formed for the benefit of small water and wastewater systems throughout Florida, now serving all systems, large and small. Members include counties, municipalities, districts, mobile home parks, schools, and authorities.
- AsociaciónFlorida Municipal Electric Association (FMEA)
Florida Municipal Electric Association
The statewide association representing Florida's 33 municipal electric utilities, with 150+ associate member companies. It provides government relations, mutual aid coordination, communications, education, and networking.
- AsociaciónFlorida's Electric Cooperatives (FECA)
Florida's Electric Cooperatives
The Tallahassee-based statewide organization representing Florida's member-owned electric cooperatives, which serve large rural areas the investor-owned and municipal utilities do not.
- ProgramaSunshine 811
Sunshine 811 call before you dig
The statewide damage prevention notification center. Contact it before digging and member utility companies mark their lines, pipes, or cables near the job site. It is a free service, and Florida's underground lines are hit about 100 times a day.
Northwest Florida
- ProgramaNorthwest Florida Water Management District
Northwest Florida Water Management District
One of five water management districts created by the Water Resources Act of 1972, covering 16 Panhandle and Capital counties from Escambia to Jefferson across 11,305 square miles and about 1.5 million residents. Where a Panhandle project gets its water use and environmental resource permits.
- ProgramaEmerald Coast Utilities Authority (ECUA)
Emerald Coast Utilities Authority (Pensacola)
The Pensacola area water, wastewater, and sanitation utility. It posts construction advisories, discharge permit public notices, and service updates, so a new contractor or supplier can see the work coming.
- ProgramaTalquin Electric Cooperative
Talquin Electric Cooperative (Tallahassee area)
A member-owned electric, water, and wastewater cooperative with offices in Bradfordville, Crawfordville, Hosford, Lake Jackson, and Quincy, serving about 57,700 electric accounts, 26,400 water accounts, and 5,600 wastewater accounts.
North Central Florida
- ProgramaSuwannee River Water Management District
Suwannee River Water Management District
The Live Oak based district that manages water and related natural resources in north central Florida, with water quality and quantity monitoring, research, regulation, land acquisition and management, and flood protection. It issues the region's water shortage orders and permits.
- ProgramaGainesville Regional Utilities (GRU)
Gainesville Regional Utilities
The multi-service municipal utility for the Gainesville area, carrying electric, natural gas, water, wastewater, reclaimed water, and GRUCom fiber. A single local buyer for a wide range of utility trades.
- AsociaciónClay Electric Cooperative
An incorporated, member-owned, not-for-profit electric power supplier founded in 1937 and controlled by those it serves, with district offices in Gainesville, Lake City, Orange Park, Salt Springs, Keystone Heights, and Palatka.
Northeast Florida
- ProgramaJEA
The community-owned electric, water, and sewer utility for Jacksonville, serving more than one million customers across four Northeast Florida counties. Its media relations page carries the capital projects and rate actions that set the region's workload.
- ProgramaClay County Utility Authority
The Middleburg based authority providing drinking water, wastewater, and reclaimed water throughout Clay County, Florida. It says its service area is expanding, with projects from transmission mains to lift station and plant upgrades.
- ProgramaSt. Johns River Water Management District
St. Johns River Water Management District
The district covering the St. Johns basin, with core missions in water supply, water quality, flood protection, and enhancement of natural systems. It administers the permitting a First Coast utility project needs.
Central Florida
- ProgramaOrlando Utilities Commission (OUC)
The Orlando area municipal electric and water utility, which also runs solar options, electric vehicle charging, efficiency rebates and audits, and business development services. A major local buyer of utility construction and maintenance work.
- ProgramaToho Water Authority
Toho Water Authority (Kissimmee and Osceola County)
The Kissimmee based water utility, distributing about 51.6 million gallons of potable water a day and processing about 34.3 million gallons of wastewater into reuse water for irrigation and industrial use, with roughly 600 employees.
- ProgramaKissimmee Utility Authority (KUA)
A community-owned electric utility based at 1701 W. Carroll Street in Kissimmee, with new service connections, conservation programs, electric vehicle charging, and storm and outage resources for its service territory.
Tampa Bay
- ProgramaTampa Bay Water
The regional wholesale water utility supplying more than 2.6 million people. Its members are Hillsborough County, Pasco County, Pinellas County, and the cities of New Port Richey, St. Petersburg, and Tampa, which also sit on its board.
- ProgramaSouthwest Florida Water Management District
Southwest Florida Water Management District
The Brooksville based district covering Citrus, DeSoto, Hardee, Hernando, Hillsborough, Manatee, Pasco, Pinellas, Polk, Sarasota, and Sumter counties plus parts of Charlotte, Highlands, and Lake. It sets the region's watering restrictions and issues its water use permits.
Southwest Florida
- ProgramaPeace River Manasota Regional Water Supply Authority
Peace River Manasota Regional Water Supply Authority
A regional wholesale drinking water supplier serving more than 900,000 people across Charlotte, DeSoto, Manatee, and Sarasota counties, delivering an average of 26 million gallons a day to its member governments.
- ProgramaBonita Springs Utilities
A not-for-profit water and wastewater utility cooperative founded by local citizens in 1970, serving the City of Bonita Springs, the Village of Estero, and unincorporated south Lee County, with 135 employees and 34,968 member connections.
- AsociaciónLee County Electric Cooperative (LCEC)
Lee County Electric Cooperative
The member-owned electric cooperative for the Cape Coral, Lehigh Acres, and wider Southwest Florida service area, with a newsroom and media contact for the projects and outage work it puts out to contractors.
Southeast Florida
- ProgramaSouth Florida Water Management District
South Florida Water Management District
The oldest and largest of the five water management districts, managing water resources in a 16 county region that stretches from Orlando to the Florida Keys and serves 9 million people. It runs the Everglades restoration construction program.
- ProgramaMiami-Dade Water and Sewer Department (WASD)
Miami-Dade Water and Sewer Department
The county utility serving about 2.4 million residents and visitors, maintaining more than 8,500 miles of water lines and about 4,100 miles of sewer lines. It reviews and approves plans for new construction and renovations and runs a capital improvement program.
- ProgramaFlorida Keys Aqueduct Authority (FKAA)
Florida Keys Aqueduct Authority
The Key West based water authority for the Florida Keys, at 1100 Kennedy Drive. It posts its projects in progress and its press releases, which is where Keys utility work is announced.
See Florida's new utility businesses
Obtén los registros reales, con direcciones y directivos, gratis por 7 días. Sin tarjeta de crédito.
Comienza tu prueba gratis