3: Sheeler Avenue & Access Driveway/Dunbridge Street
Apopka Planning Commission Meeting · 2026-04-14 · agenda_item
A traffic study for the intersection of Sheeler Avenue and Dunbridge Street is currently under review. This study, identified as 25053.01.01 Sheeler Park Synchro 12 Report, analyzes traffic volume and delay at the intersection. The analysis indicates current traffic volumes are projected to remain the same in the future. The review is early in the public process, meaning potential improvements or changes are being considered. This project could involve site clearing, grading, and utility work, followed by paving and traffic signal installation. Contractors specializing in site preparation, civil engineering, paving, and traffic control could find opportunities. Engaging with the process now, before specific plans are finalized, offers a chance to understand potential needs.
- Intersection Delay
- 1.8 s/veh
- Traffic Volume
- 32 veh/h
- Traffic Volume
- 0 veh/h
- Traffic Volume
- 11 veh/h
- Traffic Volume
- 10 veh/h
- Traffic Volume
- 308 veh/h
- Traffic Volume
- 3 veh/h
- Traffic Volume
- 6 veh/h
- Traffic Volume
- 294 veh/h
- Future Volume
- 32 veh/h
- Future Volume
- 0 veh/h
- Future Volume
- 11 veh/h
- Future Volume
- 10 veh/h
- Future Volume
- 308 veh/h
- Future Volume
- 3 veh/h
- Future Volume
- 6 veh/h
- Future Volume
- 294 veh/h
- Conflicting Peds
- 0 /hr
- Storage Length
- 240
- Storage Length
- 220
- Veh in Median Storage
- 0 #
- Grade
- 0 %
- Peak Hour Factor
- 94
- Heavy Vehicles
- 0 %
- Mvmt Flow
- 34
- Mvmt Flow
- 0
- Mvmt Flow
- 12
- Mvmt Flow
- 11
- Mvmt Flow
- 328
- Mvmt Flow
- 3
- Mvmt Flow
- 6
- Mvmt Flow
- 313
- Conflicting Flow
- 680
- Conflicting Flow
- 684
- Conflicting Flow
- 319
- Conflicting Flow
- 676
- Conflicting Flow
- 688
- Conflicting Flow
- 329
- Conflicting Flow
- 324
- Conflicting Flow
- 0
- Conflicting Flow
- 331
- Stage 1
- 331
- Stage 1
- 351
- Stage 2
- 349
- Stage 2
- 352
- Stage 2
- 326
- Stage 2
- 337
- Critical Hdwy
- 7.1
- Critical Hdwy
- 6.5
- Critical Hdwy
- 6.2
- Critical Hdwy
- 4.1
- Critical Hdwy Stg 1
- 6.1
- Critical Hdwy Stg 1
- 5.5
- Critical Hdwy Stg 2
- 6.1
- Critical Hdwy Stg 2
- 5.5
- Follow-up Hdwy
- 3.5
- Follow-up Hdwy
- 4
- Follow-up Hdwy
- 3.3
- Follow-up Hdwy
- 2.2
- Pot Cap-1 Maneuver
- 368
- Pot Cap-1 Maneuver
- 374
- Pot Cap-1 Maneuver
- 727
- Pot Cap-1 Maneuver
- 370
- Pot Cap-1 Maneuver
- 372
- Pot Cap-1 Maneuver
- 717
- Pot Cap-1 Maneuver
- 1247
- Pot Cap-1 Maneuver
- 1240
- Stage 1
- 686
- Stage 1
- 648
- Stage 1
- 670
- Stage 1
- 636
- Stage 2
- 671
- Stage 2
- 635
- Stage 2
- 691
- Stage 2
- 645
- Mov Cap-1 Maneuver
- 357
- Mov Cap-1 Maneuver
- 369
- Mov Cap-1 Maneuver
- 727
- Mov Cap-1 Maneuver
- 348
- Mov Cap-1 Maneuver
- 367
- Mov Cap-1 Maneuver
- 717
- Mov Cap-1 Maneuver
- 1247
- Mov Cap-1 Maneuver
- 1240
- Mov Cap-2 Maneuver
- 357
- Mov Cap-2 Maneuver
- 369
- Mov Cap-2 Maneuver
- 348
- Mov Cap-2 Maneuver
- 367
- Stage 1
- 683
- Stage 1
- 645
- Stage 1
- 664
- Stage 1
- 631
- Stage 2
- 655
- Stage 2
- 630
- Stage 2
- 641
- HCM Ctrl Dly
- 13.77 s/v
- HCM Ctrl Dly
- 13.09 s/v
- HCM Ctrl Dly
- 0.25 s/v
- HCM Ctrl Dly
- 0.15 s/v
- Capacity
- 1247 veh/h
- Capacity
- 478 veh/h
- Capacity
- 468 veh/h
- Capacity
- 1240 veh/h
- HCM Lane V/C Ratio
- 0.009
- HCM Lane V/C Ratio
- 0.142
- HCM Lane V/C Ratio
- 0.050
- HCM Lane V/C Ratio
- 0.005
- HCM Ctrl Dly
- 7.9 s/v
- HCM Ctrl Dly
- 13.8 s/v
- HCM Ctrl Dly
- 13.1 s/v
- HCM 95th %tile Q
- 0 veh
- HCM 95th %tile Q
- 0.5 veh
- HCM 95th %tile Q
- 0.2 veh
Industries that could win this work
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Painting & Flooring
- Utilities (Sub)
- Waste Management
Follow this across meetings
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.
Crea tu cuenta