3: Sheeler Avenue & Access Driveway/Dunbridge Street

Apopka Planning Commission Meeting · 2026-04-14 · agenda_item

A traffic study for the intersection of Sheeler Avenue and Dunbridge Street is currently under review. This study, identified as 25053.01.01 Sheeler Park Synchro 12 Report, analyzes traffic volume and delay at the intersection. The analysis indicates current traffic volumes are projected to remain the same in the future. The review is early in the public process, meaning potential improvements or changes are being considered. This project could involve site clearing, grading, and utility work, followed by paving and traffic signal installation. Contractors specializing in site preparation, civil engineering, paving, and traffic control could find opportunities. Engaging with the process now, before specific plans are finalized, offers a chance to understand potential needs.

Intersection Delay
1.8 s/veh
Traffic Volume
32 veh/h
Traffic Volume
0 veh/h
Traffic Volume
11 veh/h
Traffic Volume
10 veh/h
Traffic Volume
308 veh/h
Traffic Volume
3 veh/h
Traffic Volume
6 veh/h
Traffic Volume
294 veh/h
Future Volume
32 veh/h
Future Volume
0 veh/h
Future Volume
11 veh/h
Future Volume
10 veh/h
Future Volume
308 veh/h
Future Volume
3 veh/h
Future Volume
6 veh/h
Future Volume
294 veh/h
Conflicting Peds
0 /hr
Storage Length
240
Storage Length
220
Veh in Median Storage
0 #
Grade
0 %
Peak Hour Factor
94
Heavy Vehicles
0 %
Mvmt Flow
34
Mvmt Flow
0
Mvmt Flow
12
Mvmt Flow
11
Mvmt Flow
328
Mvmt Flow
3
Mvmt Flow
6
Mvmt Flow
313
Conflicting Flow
680
Conflicting Flow
684
Conflicting Flow
319
Conflicting Flow
676
Conflicting Flow
688
Conflicting Flow
329
Conflicting Flow
324
Conflicting Flow
0
Conflicting Flow
331
Stage 1
331
Stage 1
351
Stage 2
349
Stage 2
352
Stage 2
326
Stage 2
337
Critical Hdwy
7.1
Critical Hdwy
6.5
Critical Hdwy
6.2
Critical Hdwy
4.1
Critical Hdwy Stg 1
6.1
Critical Hdwy Stg 1
5.5
Critical Hdwy Stg 2
6.1
Critical Hdwy Stg 2
5.5
Follow-up Hdwy
3.5
Follow-up Hdwy
4
Follow-up Hdwy
3.3
Follow-up Hdwy
2.2
Pot Cap-1 Maneuver
368
Pot Cap-1 Maneuver
374
Pot Cap-1 Maneuver
727
Pot Cap-1 Maneuver
370
Pot Cap-1 Maneuver
372
Pot Cap-1 Maneuver
717
Pot Cap-1 Maneuver
1247
Pot Cap-1 Maneuver
1240
Stage 1
686
Stage 1
648
Stage 1
670
Stage 1
636
Stage 2
671
Stage 2
635
Stage 2
691
Stage 2
645
Mov Cap-1 Maneuver
357
Mov Cap-1 Maneuver
369
Mov Cap-1 Maneuver
727
Mov Cap-1 Maneuver
348
Mov Cap-1 Maneuver
367
Mov Cap-1 Maneuver
717
Mov Cap-1 Maneuver
1247
Mov Cap-1 Maneuver
1240
Mov Cap-2 Maneuver
357
Mov Cap-2 Maneuver
369
Mov Cap-2 Maneuver
348
Mov Cap-2 Maneuver
367
Stage 1
683
Stage 1
645
Stage 1
664
Stage 1
631
Stage 2
655
Stage 2
630
Stage 2
641
HCM Ctrl Dly
13.77 s/v
HCM Ctrl Dly
13.09 s/v
HCM Ctrl Dly
0.25 s/v
HCM Ctrl Dly
0.15 s/v
Capacity
1247 veh/h
Capacity
478 veh/h
Capacity
468 veh/h
Capacity
1240 veh/h
HCM Lane V/C Ratio
0.009
HCM Lane V/C Ratio
0.142
HCM Lane V/C Ratio
0.050
HCM Lane V/C Ratio
0.005
HCM Ctrl Dly
7.9 s/v
HCM Ctrl Dly
13.8 s/v
HCM Ctrl Dly
13.1 s/v
HCM 95th %tile Q
0 veh
HCM 95th %tile Q
0.5 veh
HCM 95th %tile Q
0.2 veh

Industries that could win this work

  • Engineering & Architecture
  • Site Prep, Grading & Hardscape
  • Concrete & Masonry
  • Painting & Flooring
  • Utilities (Sub)
  • Waste Management