Skip to main content

Sé el Primero, Construye Relaciones Duraderas

Browse City of Apopka civic records

Every published record for City of Apopka, newest first. Filter by board, year, or industry to jump straight to the records you want, and page through to reach the full archive.

1,642 records

1. MDP-24-4 - Floridian Town Center Hotel - Major Development Plan (MDP), 3rd Submittal

Florence Hotel Company LLC is proposing to develop a new hotel on Southfork Drive in Apopka. The project involves constructing a 4-story, approximately 77,081 square foot hotel with 137 rooms. This development will also include associated parking, landscaping, drainage, and utilities on a roughly 2.91-acre site. The Major Development Plan is currently under review, representing an early stage in the project's lifecycle. The work will likely involve site clearing and grading, underground utility installation, paving for parking lots and driveways, building construction including framing and finishes, and final landscaping. Local contractors, trades, suppliers, and service providers are encouraged to engage early to understand the project scope and potentially secure future work before final plans and bids are established.

Board:
Development Review Committee Meeting
Date:
2026-04-29
Type:
Agenda_item
Address:
Southfork Drive
Applicant:
Florence Hotel Company LLC

1. MDP-24-4 - Floridian Town Center Hotel - Major Development Plan (MDP), 3rd Submittal

Florence Hotel Company LLC is proposing the development of a 137-room hotel, identified as MDP-24-4, at Southfork Drive. This Major Development Plan (MDP) is currently undergoing its third submittal for review. The project is in the planning and review stages, indicating early opportunity for interested parties. If approved, this development would likely involve site preparation, including clearing and grading, followed by underground utility work and foundation construction. Subsequent phases would include vertical construction of the hotel structure, installation of mechanical, electrical, and plumbing systems, interior finishing, and exterior site work such as paving and landscaping. Local contractors, trades, suppliers, and service providers are encouraged to engage early to understand the project's scope and potential needs before final plans and permits are issued.

Board:
Development Review Committee Meeting
Date:
2026-04-29
Type:
Agenda_item
Address:
Southfork Drive
Applicant:
Florence Hotel Company LLC

2. Apopka / Altamonte Springs Veterans of Foreign Wars Post 10147 - Tribute to Billy Joel Dinner and Show - Apopka

The Apopka / Altamonte Springs Veterans of Foreign Wars Post 10147 is planning a fundraiser event called "Tribute to Billy Joel Dinner and Show." This event is proposed to take place at the Apopka Community Center / VFW Post 10147, located at 519 South Central Avenue. The event is scheduled for May 16th, 2026, from 5:00 PM to 10:00 PM. This item is currently under review by the Development Review Committee. The project involves event planning, setup, and tear-down, including potential needs for catering, entertainment services, and temporary site amenities. Local contractors, suppliers, and service providers could find opportunities by engaging early with the organizers before final plans and permits are secured.

Board:
Development Review Committee Meeting
Date:
2026-04-29
Type:
Agenda_item
Address:
519 South Central Avenue
Applicant:
Apopka / Altamonte Springs Veterans of Foreign Wars Post 10147

2. Apopka / Altamonte Springs Veterans of Foreign Wars Post 10147 - Tribute to Billy Joel Dinner and Show - Apopka

The Apopka / Altamonte Springs Veterans of Foreign Wars Post 10147 is planning a fundraiser event called "Tribute to Billy Joel Dinner and Show." This event is scheduled for May 16th, 2026, from 5:00 PM to 10:00 PM at the Apopka Community Center / VFW Post 10147, located at 519 South Central Avenue. The event is currently under review by the City of Apopka's Development Review Committee. While this is a single event, the planning and execution will involve coordination for setup and teardown, potentially including temporary structures, catering services, and entertainment logistics. Businesses specializing in event services, catering, and potentially temporary site setup could find opportunities. Engaging early with the applicant, Michael McFadden, or the project manager, Carolyn Ray, before final plans are set could provide a competitive advantage.

Board:
Development Review Committee Meeting
Date:
2026-04-29
Type:
Agenda_item
Address:
519 South Central Avenue
Applicant:
Apopka / Altamonte Springs Veterans of Foreign Wars Post 10147

DRC Agenda 04/29/2026

The Apopka Development Review Committee agenda for April 29, 2026, includes several items relevant to contractors. Project 1 is a Special Event: E-26-1, a workout/exercise event at the Northwest Recreation Complex, 3710 Jason Dwelley Parkway, on May 23rd, 2026, proposed by Andrew Reyes. Project 2 is another Special Event: a Tribute to Billy Joel Dinner and Show at the Apopka Community Center / VFW Post 10147, 519 S Central Avenue, on May 16th, 2026, proposed by Michael McFadden. Under Annexation, AN-26-3, 'Kelly Park Road Commercial', involves the annexation of the property at 3603 West Kelly Park Road by Effie Road Holdings LLC, represented by 1882 Engineering. Under Site Plan, there is a Major Development Plan, MDP-24-4, 'Floridian Town Center Hotel', proposing a 137-room hotel at Southfork Drive, with Florence Hotel Company LLC as the owner and Jason Searl, Esq. as the applicant. The document does not state any public comment or stakeholder sentiment.

Board:
Development Review Committee Meeting
Date:
2026-04-29
Type:
Agenda
Address:
3710 Jason Dwelley Parkway; 519 S Central Avenue; 3603 West Kelly Park Road; Southfork Drive
Applicant:
Andrew Reyes; Michael McFadden; 1882 Engineering - Luke Classon; Jason Searl, Esq.

DRC Agenda Packet 04/29/2026

The Apopka Development Review Committee Agenda for April 29, 2026, lists several items. Item 1, E-26-1, concerns the 'Murph - Northwest Recreation Complex' event at 3710 Jason Dwelley Parkway on May 23rd, 2026, a workout/exercise event. Item 2, Apopka / Altamonte Springs Veterans of Foreign Wars Post 10147, details a 'Tribute to Billy Joel Dinner and Show' at the Community Center / VFW Post 10147, 529 South Central Avenue, on May 16th, 2026, a fundraiser. Under ANNEXATION, item 1, AN-26-3, is the 'Kelly Park Road Commercial - Annexation (AN), 1st Submittal' for property at 3603 West Kelly Park Road, proposed to be annexed into the City of Apopka. Under SITE PLAN, item 1, MDP-24-4, is the 'Floridian Town Center Hotel - Major Development Plan (MDP), 3rd Submittal' for property on Southfork Drive, proposing a 137-room hotel. The agenda also includes a DISCUSSION section. The document also contains detailed applications and supporting documents for these items, including a Special Event Permit Application for the 'Murph' event and a Special Event Permit Application for the VFW Tribute to Billy Joel Dinner and Show, along with associated insurance, licensing, and site plans for the Floridian Town Center Hotel.

Board:
Development Review Committee Meeting
Date:
2026-04-29
Type:
Agenda_packet
Address:
3710 Jason Dwelley Parkway; 529 South Central Avenue; 3603 West Kelly Park Road; Southfork Drive
Applicant:
The Oak; Apopka / Altamonte Springs Veterans of Foreign Wars Post 10147; 1882 Engineering - Luke Classon; Florence Hotel Company LLC

1. CSP-26-16 - Cold Link Construction Site Plan (CSP), 1st Submittal

A new 150,000 square foot building is proposed for the property at 2560 West Orange Blossom Trail. The owner is MG88 Central Florida, and Kimley-Horn, represented by Joshua Enot, is the applicant. This project is currently in its first submittal phase and is under review by the Development Review Committee. The scope of work would likely involve site preparation, grading, underground utilities, concrete work, building construction including framing, electrical, plumbing, and HVAC systems, and final finishes. Contractors, suppliers, and service providers in site prep, general construction, and all building trades should consider reaching out to the applicant early. Engaging before site plans, bids, and permits are finalized offers the best opportunity to compete for work on this planned development.

Board:
Development Review Committee Meeting
Date:
2026-04-22
Type:
Agenda_item
Address:
2560 West Orange Blossom Trail
Applicant:
MG88 Central Florida

1. CSP-26-16 - Cold Link Construction Site Plan (CSP), 1st Submittal

A new 150,000 square foot building is proposed for the property at 2560 West Orange Blossom Trail. The owner is MG88 Central Florida, and the applicant is Kimley-Horn, represented by Joshua Enot. This project is currently in its first submittal phase and is under review by the City of Apopka's Development Review Committee. The development is expected to involve significant site preparation, including clearing and grading, followed by underground utility work and construction of the building's foundation and structure. Subsequent phases will likely include mechanical, electrical, and plumbing installations, interior finishing, roofing, and exterior work, concluding with landscaping. Contractors, suppliers, and service providers in areas such as site work, concrete, framing, electrical, plumbing, HVAC, roofing, and landscaping may find opportunities. Engaging early, before final plans and permits are issued, allows businesses to understand the project's scope and prepare for potential bids.

Board:
Development Review Committee Meeting
Date:
2026-04-22
Type:
Agenda_item
Address:
2560 West Orange Blossom Trail
Applicant:
MG88 Central Florida

1. FLU-26-3 Kelly Park Road Commercial - Future Land Use (FLU), 1st Submittal

A proposal is under review to change the future land use for three properties located at 3595, 3603, and 6311 West Kelly Park Road. The current land use is Residential and FLU-IP9. The proposed change is to Mixed Use. This item is a first submittal and is currently planned for review. The project involves a plat, which typically includes site preparation, grading, and utility work. Following this, construction could involve building vertical structures, and then interior and exterior finishing trades. Local contractors, suppliers, and service providers should consider reaching out to the applicant or project manager early. Engaging before site plans, bids, and permits are finalized offers the best opportunity to compete for work on this developing project.

Board:
Development Review Committee Meeting
Date:
2026-04-22
Type:
Agenda_item
Address:
3595 West Kelly Park Road
Applicant:
Effie Road Holdings LLC

1. FLU-26-3 Kelly Park Road Commercial - Future Land Use (FLU), 1st Submittal

A proposal is under review to change the future land use for three properties located at 3595, 3603, and 6311 West Kelly Park Road. The current land use is Residential and FLU-IP9. The proposed change is to Mixed Use. This item is currently in the planning stages, having received its first submittal. If approved, this project would likely involve site preparation, grading, and utility work, followed by construction of mixed-use buildings. The project could then move into interior and exterior finishing trades, and finally landscaping. Local contractors, suppliers, and service providers are encouraged to learn more about this project early in the process. Understanding the project details before final site plans, bids, and permits are established can provide a competitive advantage for securing future work.

Board:
Development Review Committee Meeting
Date:
2026-04-22
Type:
Agenda_item
Address:
3595 West Kelly Park Road
Applicant:
Effie Road Holdings LLC

1. MDP-26-1 - Paulucci Acres - Pod 1A/B & 4 - Major Development Plan (MDP), 2nd Submittal

A Major Development Plan for Paulucci Acres, Pod 1A/B & 4, is currently under review by the City of Apopka's Development Review Committee. This project, proposed by Paulucci Acres LLC and applied for by 1828 Engineering LLC, plans to create a residential subdivision with 502 individual single-family lots. The development is located at 2213 Vick Road, along Vick Road and West Ponkan Road. This early stage means that site clearing, grading, and underground utility work would likely be among the first phases of construction. Following this, road and driveway paving, vertical construction, and final landscaping would occur. Contractors, suppliers, and service providers in residential construction, site preparation, utilities, and related trades can explore opportunities by engaging early, before final site plans, bids, and permits are issued. Understanding the project scope now offers a chance to prepare for potential future work.

Board:
Development Review Committee Meeting
Date:
2026-04-22
Type:
Agenda_item
Address:
2213 Vick Road
Applicant:
Paulucci Acres LLC

1. MDP-26-1 - Paulucci Acres - Pod 1A/B & 4 - Major Development Plan (MDP), 2nd Submittal

A Major Development Plan (MDP) for Paulucci Acres, Pod 1A/B & 4, is under review by the City of Apopka's Development Review Committee. This project proposes a new residential subdivision with 502 individual single-family lots. The location is described as 2213 Vick Road, Vick Road, and West Ponkan Road. This second submittal indicates the project is planned for future construction phases. The work would likely involve initial site clearing and grading, followed by underground utility installation, road and driveway paving, and then the vertical construction of homes. Finally, landscaping and finishing trades would complete the development. Contractors, suppliers, and service providers in residential construction, site preparation, utilities, and related trades can explore opportunities by engaging early in the process before final plans and bids are set.

Board:
Development Review Committee Meeting
Date:
2026-04-22
Type:
Agenda_item
Address:
2213 Vick Road
Applicant:
Paulucci Acres LLC

1. SECTION SHOWN IS BASED ON AN ANTICIPATED CBR OF 1255 & 1277 PER THEPLYMOUTH SORRENTO RD IMPROVEMENTS PLANS PREPARED BY BOHLERENGINEERING FL, LLC.NOTE:

A project is planned to improve Plymouth Sorrento Road, located in Apopka, Florida. The work involves widening the road and resurfacing existing asphalt with new layers of asphalt and a compacted stone base. This project is currently under review by the Development Review Committee. The scope of work will include site clearing and grading, installation of underground utilities and stormwater systems, paving of new and existing road surfaces, and final landscaping. Contractors specializing in road construction, paving, grading, utility work, and material supply are encouraged to learn more about this project. Early engagement before final bid and permit stages could provide a competitive advantage.

Board:
Development Review Committee Meeting
Date:
2026-04-22
Type:
Agenda_item
Address:
1829 Plymouth Sorrento Rd, Apopka, FL 32712

2. CSP-25-46 - Apopka K-8 Charter School - Construction Site Plan (CSP), 3rd Submittal

A new K-8 charter school is planned for 1839 Plymouth Sorrento Road in Apopka. The project, proposed by Bohler Engineering FL LLC, involves the construction of a school facility. This item is currently under review by the Development Review Committee. The project will likely involve site clearing and grading, underground utility work, paving for access roads and parking, building construction including framing, mechanical, electrical, and plumbing, and final landscaping. Local contractors, trades, suppliers, and service providers should consider engaging with the applicant early to understand project needs before final plans and permits are issued. This early engagement can provide a competitive advantage for future work.

Board:
Development Review Committee Meeting
Date:
2026-04-22
Type:
Agenda_item
Address:
1839 Plymouth Sorrento Road
Applicant:
Scott Woodrey

2. CSP-25-46 - Apopka K-8 Charter School - Construction Site Plan (CSP), 3rd Submittal

A Construction Site Plan (CSP) for the Apopka K-8 Charter School is currently under review. The project is located at 1839 Plymouth Sorrento Road and is proposed as a K-8 charter school. This project is in the discussion phase with the Development Review Committee. The development would likely involve site clearing and grading, underground utility work, paving for access and parking, building construction including framing and finishes, and final landscaping. Contractors, suppliers, and service providers in construction, engineering, and related trades should consider reaching out early to learn more about potential opportunities as plans develop, before bids and permits are finalized.

Board:
Development Review Committee Meeting
Date:
2026-04-22
Type:
Agenda_item
Address:
1839 Plymouth Sorrento Road
Applicant:
Scott Woodrey

DRC Agenda 04/22/2026

[3595 West Kelly Park Road, 3603 West Kelly Park Road, 6311 West Kelly Park Road; case FLU-26-3] Future Land Use Amendment: Effie Road Holdings LLC, applicant 1828 Engineering Inc, proposes to change future land use from Residential (County)/FLU-IP9 (City) to Mixed Use (MU) at 3595, 3603, and 6311 West Kelly Park Road. Case number FLU-26-3. [2260, 2404 Plymouth Sorrento Road, 2244 Sorrento Avenue; case PL-25-10] Plat Application: TPG AG EHC III (LEN) Multi State 5 LLC, applicant G L Summitt Engineering Inc, seeks approval for Ridgebrook Plat to create 88 single family homes at 2260, 2404 Plymouth Sorrento Road, and 2244 Sorrento Avenue. Case number PL-25-10. [2213 Vick Road, Vick Road, West Ponkan Road; case MDP-26-1] Major Development Plan: Paulucci Acres LLC, applicant 1828 Engineering LLC, proposes a residential subdivision with 502 individual single family lots at 2213 Vick Road, Vick Road, and West Ponkan Road. Case number MDP-26-1. [2560 West Orange Blossom Trail; case CSP-26-16] Construction Site Plan: MG88 Central Florida, applicant Kimley-Horn, proposes to add an additional 150,000 SF building on the property at 2560 West Orange Blossom Trail. Case number CSP-26-16. [1839 Plymouth Sorrento Road; case CSP-25-46] Construction Site Plan: Scott Woodrey, applicant Bohler Engineering FL LLC, proposes a K-8 Charter School at 1839 Plymouth Sorrento Road. Case number CSP-25-46.

Board:
Development Review Committee Meeting
Date:
2026-04-22
Type:
Agenda
Address:
3595 West Kelly Park Road, 3603 West Kelly Park Road, 6311 West Kelly Park Road
Applicant:
1828 Engineering Inc - Luke Classon

DRC Agenda Packet 04/22/2026

[3595 West Kelly Park Road, 3603 West Kelly Park Road, 6311 West Kelly Park Road; case FLU-26-3] Future Land Use Amendment: Effie Road Holdings LLC, represented by 1828 Engineering Inc, seeks to change the future land use from Residential (County)/FLU-IP9 (City) to Mixed Use (MU) at 3595, 3603, and 6311 West Kelly Park Road. Case number FLU-26-3. This is the 1st submittal. [2260, 2404 Plymouth Sorrento Road, 2244 Sorrento Avenue; case PL-25-10] Plat Application: TPG AG EHC III (LEN) Multi State 5 LLC, represented by G L Summitt Engineering Inc, is applying for the Ridgebrook Plat, proposing 88 single-family homes. This is the 2nd submittal. The property is located at 2260 and 2404 Plymouth Sorrento Road, and 2244 Sorrento Avenue. The legal description covers approximately 40.71 acres (1,773,225 square feet) within Section 25, Township 20 South, Range 27 East and Section 30, Township 20 South, Range 28 East, City of Apopka, Orange County, Florida. [2213 Vick Road, Vick Road, West Ponkan Road; case MDP-26-1] Major Development Plan: Paulucci Acres LLC, represented by 1828 Engineering LLC, is seeking approval for Pod 1A/B & 4 of the Paulucci Acres development, proposing a residential subdivision with 502 individual single-family lots. This is the 2nd submittal. The location is 2213 Vick Road, Vick Road, and West Ponkan Road. [2560 West Orange Blossom Trail; case CSP-26-16] Construction Site Plan: MG88 Central Florida, represented by Kimley-Horn, is proposing to add an additional 150,000 SF building on the property at 2560 West Orange Blossom Trail. This is the 1st submittal. [1839 Plymouth Sorrento Road; case CSP-25-46] Construction Site Plan: Scott Woodrey, represented by Bohler Engineering FL LLC, is seeking approval for a K-8 Charter School at 1839 Plymouth Sorrento Road. This is the 3rd submittal.

Board:
Development Review Committee Meeting
Date:
2026-04-22
Type:
Agenda_packet
Address:
3595 West Kelly Park Road, 3603 West Kelly Park Road, 6311 West Kelly Park Road
Applicant:
1828 Engineering Inc - Luke Classon

W. PONKAN ROAD

A new development is planned for an area near W. Ponkan Road, Jason Dwelley Parkway, Vick Road, Ponkan Summit Drive, Rogers Road, and Pittman Road. The specific details of this project, including its size, current use, or proposed use, are not provided in the posted record. The item is currently under review by the Development Review Committee. This review process will likely involve initial site assessments, planning, and design phases. Local contractors, suppliers, and service providers are encouraged to monitor this project's progress as it moves through the review process. Early engagement could provide opportunities to understand project needs as they develop.

Board:
Development Review Committee Meeting
Date:
2026-04-22
Type:
Agenda_item
Address:
W. PONKAN ROAD

W. PONKAN ROAD

A new K-8 charter school is planned for development at the southeast corner of West Lester Road and Plymouth Sorrento Road in Apopka, Florida. The project includes a 55,653 square foot school building, associated parking, stormwater management systems, and utility infrastructure, with an additional 1.58 acres designated for future development. The site is currently vacant or agricultural land and will be rezoned to a Planned Development/Community Commercial designation. This project is currently under review by the City of Apopka and Orange County. The development will involve site clearing and grading, underground utility work, paving for access roads and parking lots, building construction, and final landscaping. Local contractors, trades, suppliers, and service providers are encouraged to engage early to understand the project scope and potential opportunities before final plans and bids are established.

Board:
Development Review Committee Meeting
Date:
2026-04-22
Type:
Agenda_item
Address:
1829 Plymouth Sorrento Rd, Apopka, FL 32712
Applicant:
Red Apple Development

1. ALL SITE WORK CONSTRUCTION TESTING SHALL BE PERFORMED BY A CERTIFIED / LICENSED2. ALL SITE WORK CONSTRUCTION TESTING SHALL BE CONDUCTED IN ACCORDANCE WITH THE PROJECT'S GEOTECHNICAL REPORT AND / OR THE TESTING PARAMETERS OF THE LOCAL MUNICIPALITY / AGENCY HAVING JURISDICTION OVER THE SITE WORK. THE MORE STRINGENT3. COPIES OF PASSING TEST RESULTS SHALL BE PROVIDED TO THE DEVELOPER, ENGINEER OF RECORD, CONTRACTOR AND LOCAL MUNICIPALITY / AGENCY FOR PURPOSES, SUCH AS BUT4. THE SERVICES OF A CONSTRUCTION TESTING GEOTECHNICAL FIRM SHALL BE RETAINED BY THE DEVELOPER, UNLESS OTHERWISE SPECIFIED IN THE BID DOCUMENTS.5. S.A.I. WILL NOT BE RESPONSIBLE FOR SCHEDULING, COORDINATION OR EVALUATION OF THE SOILS TESTING AND CERTIFICATIONS. IT SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO MAKE THE NECESSARY ARRANGEMENTS DIRECTLY WITH THE SOILS TESTING LABORATORY / GEOTECHNICAL FIRM AND THE SITE CONTRACTOR.

The City of Apopka's Development Review Committee is reviewing requirements for site work construction testing and utility line installations. This review includes standards for soil testing, water system pressure testing, and chlorination sampling. It also details separation requirements for reclaimed water lines, potable water mains, and sanitary sewers, including specific rules for pipe crossings and parallel installations. The project is currently under review, indicating an early stage in the planning process. This review will set the stage for future construction activities, likely involving site clearing, grading, underground utility work for water and sewer systems, and potentially paving. Contractors specializing in geotechnical testing, utility installation, and site preparation could find opportunities. Engaging early allows businesses to understand the project's specific testing and installation requirements before bids and permits are finalized.

Board:
Development Review Committee Meeting
Date:
2026-04-15
Type:
Agenda_item

Mira los negocios reales detrás de estos números

Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.

Crea tu cuenta