4. Proposed Wastewater and Reclaimed System Improvements ............................................... 18
6:00 pm City Commission Meeting · 2026-07-16 · agenda_item
The City of Cocoa Beach is reviewing plans for significant upgrades to its wastewater and reclaimed water systems. This includes improvements to multiple lift stations, the A1A gravity sewer crossover, and odor control at Lift Station #5. The project also involves work on the Port Canaveral and Patrick Air Force Base sewage force mains. Further planned improvements at the Wastewater Treatment Plant (WWTP) include rehabilitation of clarifiers, potential replacement of grit removal systems, generator upgrades, and work on injection wells. Additionally, there are plans for inspecting and repairing reuse ground storage tanks, evaluating and potentially replacing pumps, and replacing drum screens, disc filters, and various valves within the reclaimed transmission and distribution systems. An inflow and infiltration abatement program is also under review. This comprehensive project is currently under review and represents an early opportunity for contractors, suppliers, and service providers. The scope of work will likely involve site clearing, underground utility work, pipe installation, concrete and masonry, mechanical and electrical systems, and potentially odor control system installation. Businesses specializing in civil construction, utility work, heavy equipment, plumbing, electrical, HVAC, and material supply should consider reaching out to learn more about this upcoming infrastructure development.
Industries that could win this work
- Utilities (Sub)
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
Follow this across meetings
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.
Crea tu cuenta