Skip to main content

Sé el Primero, Construye Relaciones Duraderas

f. Reclaimed Water Distribution System Evaluation

6:00 pm City Commission Meeting · 2026-07-16 · agenda_item

The City of Cocoa Beach is planning improvements to its Reclaimed Water Distribution System. The total conceptual cost for these recommended improvements is approximately $31,638,000. The project involves upgrades to the Water Reclamation Facility (WRF), including clarifier rehabilitation, grit removal system replacement, generator replacement, and various equipment replacements and inspections. It also includes an I/I (Inflow and Infiltration) Abatement Study and Implementation, which involves manhole inspections, flow monitoring, smoke testing, and sanitary sewer lining. Additionally, the project includes collection system and reuse transmission improvements such as lift station upgrades and force main work. This agenda item is currently under review by the City Commission. The scope of work will likely involve site clearing and grading, underground utility work, concrete and paving, mechanical and electrical systems, and final landscaping. Local contractors, trades, suppliers, and service providers are encouraged to reach out early to understand the project details before formal bidding and permitting processes begin, as this can provide a competitive advantage.

total conceptual cost
31,638,000 $
Clarifier Rehabilitation
2,000,000 $
Grit Removal System Replacement
600,000 $
Generator Replacement
1,500,000 $
Injection Well, Monitoring Wells Cleaning and Inspection/Replacement
100,000 $
Reuse GST Inspection and Repairs
100,000 $
Reuse Transfer Pump Evaluation/Replacement
600,000 $
Drum Screen Replacements
750,000 $
WRF Valve Replacements
200,000 $
Disc Filter Replacement
1,000,000 $
WRF Subtotal
6,850,000 $
WRF Contingency
1,370,000 $
WRF Total
8,220,000 $
Manhole Inspections, Flow Monitoring, and Smoke Testing
800,000 $
Sanitary Sewer Lining
4,800,000 $
Sanitary Sewer Lining quantity
80,000 LF
Lateral Sewer Lining
5,000,000 $
Lateral Sewer Lining quantity
1,000 EA
Manhole Rehabilitation
1,920,000 $
Manhole Rehabilitation quantity
200 EA
I/I Abatement Subtotal
12,520,000 $
I/I Abatement Contingency
1,252,000 $
I/I Abatement CEI Services
1,252,000 $
I/I Abatement Total
15,024,000 $
Lift Station Upgrades
3,516,000 $
A1A Gravity Sewer Crossover
900,000 $
Lift Station #5 Odor Control
600,000 $
Port Canaveral Sewage Force Main
293,000 $
PAFB and LS5 Sewage Force Main
810,000 $
Reclaimed Transmission Valve Replacement
516,000 $
Reclaimed Water Distribution System Evaluation
360,000 $
Collection System Subtotal
6,995,000 $
Collection System Contingency
1,399,000 $
Collection System Total
8,394,000 $
wastewater customers
4,400
rated capacity of the water reclamation facility
6.0 MGD
Phase III cost
1,020,000 $
Phase III piping
50,000 feet
Phase III connections
1,500 residential connections
Phase IV cost
2,841,000 $
Phase IV piping
12,000 linear feet
Phase IV storage tank
5 MG
Phase V cost
1,898,000 $
Phase V piping
55,000 linear feet
Phase V connections
1,250 service connections
chlorine injection upgrade
2000
chlorine contact chamber walkway
2001
biological process conversion
2012
reclaimed water ASR construction
2013
ASR well capacity
2.0 MGD
sanitary sewer rehabilitation study
2014-2016
water reclamation facility filter conversion
2019/2020
City has provided reclaimed water distribution services for
30 years
City of Cocoa Beach collection system customers
4,150 residential and commercial customers
Gravity Sewer Pipe
55 miles
Sanitary Manholes
1,069
Force Mains
14 miles
Lift Stations
17
sewage by gravity flow
40 %
influent structure bar screens replaced
3 years ago
clarifier drives replaced
2012
gravity bypass installed
3 years ago
cloth media diamond filters
2
Discfilters
2
cloth media diamond filters age
3 years old
Discfilters age
16 years old
chlorine contact chamber canopy installed
2020
chlorine feed piping upgraded
2020
waste sludge production
60,000 gallons per day
sludge solids content
3 %
drum thickeners replaced
2020
aerobic holding system basin volume
210,000 gallons
aerobic holding system detention
7 days
dewatering solids content
16 %
biosolids composting greenhouse constructed
2012
ground storage tanks
4
ground storage tanks capacity
15 million gallons

Industries that could win this work

  • General Contractor
  • Site Prep, Grading & Hardscape
  • Concrete & Masonry
  • Electrical
  • HVAC & Climate Control
  • Plumbing
  • Restoration & Waterproofing
  • Construction (Other)
  • Utilities (Sub)
  • Building & Industrial Supply
  • Engineering & Architecture
  • Real Estate Development
  • Landscaping & Lawn Service

Follow this across meetings

Applicants and firms

Mira los negocios reales detrás de estos números

Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.

Crea tu cuenta