f. Reclaimed Water Distribution System Evaluation
6:00 pm City Commission Meeting · 2026-07-16 · agenda_item
The City of Cocoa Beach is planning improvements to its Reclaimed Water Distribution System. The total conceptual cost for these recommended improvements is approximately $31,638,000. The project involves upgrades to the Water Reclamation Facility (WRF), including clarifier rehabilitation, grit removal system replacement, generator replacement, and various equipment replacements and inspections. It also includes an I/I (Inflow and Infiltration) Abatement Study and Implementation, which involves manhole inspections, flow monitoring, smoke testing, and sanitary sewer lining. Additionally, the project includes collection system and reuse transmission improvements such as lift station upgrades and force main work. This agenda item is currently under review by the City Commission. The scope of work will likely involve site clearing and grading, underground utility work, concrete and paving, mechanical and electrical systems, and final landscaping. Local contractors, trades, suppliers, and service providers are encouraged to reach out early to understand the project details before formal bidding and permitting processes begin, as this can provide a competitive advantage.
- total conceptual cost
- 31,638,000 $
- Clarifier Rehabilitation
- 2,000,000 $
- Grit Removal System Replacement
- 600,000 $
- Generator Replacement
- 1,500,000 $
- Injection Well, Monitoring Wells Cleaning and Inspection/Replacement
- 100,000 $
- Reuse GST Inspection and Repairs
- 100,000 $
- Reuse Transfer Pump Evaluation/Replacement
- 600,000 $
- Drum Screen Replacements
- 750,000 $
- WRF Valve Replacements
- 200,000 $
- Disc Filter Replacement
- 1,000,000 $
- WRF Subtotal
- 6,850,000 $
- WRF Contingency
- 1,370,000 $
- WRF Total
- 8,220,000 $
- Manhole Inspections, Flow Monitoring, and Smoke Testing
- 800,000 $
- Sanitary Sewer Lining
- 4,800,000 $
- Sanitary Sewer Lining quantity
- 80,000 LF
- Lateral Sewer Lining
- 5,000,000 $
- Lateral Sewer Lining quantity
- 1,000 EA
- Manhole Rehabilitation
- 1,920,000 $
- Manhole Rehabilitation quantity
- 200 EA
- I/I Abatement Subtotal
- 12,520,000 $
- I/I Abatement Contingency
- 1,252,000 $
- I/I Abatement CEI Services
- 1,252,000 $
- I/I Abatement Total
- 15,024,000 $
- Lift Station Upgrades
- 3,516,000 $
- A1A Gravity Sewer Crossover
- 900,000 $
- Lift Station #5 Odor Control
- 600,000 $
- Port Canaveral Sewage Force Main
- 293,000 $
- PAFB and LS5 Sewage Force Main
- 810,000 $
- Reclaimed Transmission Valve Replacement
- 516,000 $
- Reclaimed Water Distribution System Evaluation
- 360,000 $
- Collection System Subtotal
- 6,995,000 $
- Collection System Contingency
- 1,399,000 $
- Collection System Total
- 8,394,000 $
- wastewater customers
- 4,400
- rated capacity of the water reclamation facility
- 6.0 MGD
- Phase III cost
- 1,020,000 $
- Phase III piping
- 50,000 feet
- Phase III connections
- 1,500 residential connections
- Phase IV cost
- 2,841,000 $
- Phase IV piping
- 12,000 linear feet
- Phase IV storage tank
- 5 MG
- Phase V cost
- 1,898,000 $
- Phase V piping
- 55,000 linear feet
- Phase V connections
- 1,250 service connections
- chlorine injection upgrade
- 2000
- chlorine contact chamber walkway
- 2001
- biological process conversion
- 2012
- reclaimed water ASR construction
- 2013
- ASR well capacity
- 2.0 MGD
- sanitary sewer rehabilitation study
- 2014-2016
- water reclamation facility filter conversion
- 2019/2020
- City has provided reclaimed water distribution services for
- 30 years
- City of Cocoa Beach collection system customers
- 4,150 residential and commercial customers
- Gravity Sewer Pipe
- 55 miles
- Sanitary Manholes
- 1,069
- Force Mains
- 14 miles
- Lift Stations
- 17
- sewage by gravity flow
- 40 %
- influent structure bar screens replaced
- 3 years ago
- clarifier drives replaced
- 2012
- gravity bypass installed
- 3 years ago
- cloth media diamond filters
- 2
- Discfilters
- 2
- cloth media diamond filters age
- 3 years old
- Discfilters age
- 16 years old
- chlorine contact chamber canopy installed
- 2020
- chlorine feed piping upgraded
- 2020
- waste sludge production
- 60,000 gallons per day
- sludge solids content
- 3 %
- drum thickeners replaced
- 2020
- aerobic holding system basin volume
- 210,000 gallons
- aerobic holding system detention
- 7 days
- dewatering solids content
- 16 %
- biosolids composting greenhouse constructed
- 2012
- ground storage tanks
- 4
- ground storage tanks capacity
- 15 million gallons
Industries that could win this work
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Restoration & Waterproofing
- Construction (Other)
- Utilities (Sub)
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Landscaping & Lawn Service
Follow this across meetings
Applicants and firms
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.
Crea tu cuenta