III. PROPOSED IMPROVEMENTS
Board of Adjustment Meeting · 2026-05-20 · agenda_item
The applicant plans to build a second-story addition to an existing house. This addition will include a part that sticks out about seven feet over the current driveway. Because the front of the property has a curved line, the addition will go into the required front setback area. This project is currently under review by the Board of Adjustment. The work would involve construction trades for the addition, including framing, roofing, and finishing. Contractors and suppliers for building materials could be involved. Reaching out to the applicant early could provide an advantage before final plans and permits are set.
- cantilevered architectural feature extension
- 7 feet
Industries that could win this work
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Windows, Doors & Glass
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
Follow this across meetings
Applicants and firms
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.
Crea tu cuenta