June 3, 2026 Board of Adjustment Meeting Agenda
Board of Adjustment · 2026-06-03 · agenda
The East Pass Bridge Committee agenda for June 3, 2026, lists two variance requests. Project PZ-2026-48 at 35000 Emerald Coast Parkway and Project PZ-2026-69 at 751 Harbor Blvd. The agenda includes sections for Call to Order, Agenda Approval, Approval of Minutes (May 6, 2026 BOA Minutes), Current Business, Public Comments, and Next Meeting Date (July 1, 2026). No decisions on the variance requests are stated in this document. Public comment is a scheduled agenda item, but no specific comments or sentiments are recorded in this document. The document notes that individuals needing assistance for the meeting should contact the City Clerk's Office.
Agenda items
- 1. ALL PLANTING IN VISIBILITY TRIANGLE MUST ADHERE TO THE CITY OF DESTIN LDC 8.03.06(A).2. NO PLANTING SHALL BE ALLOWED TO GROW IN SUCH A MANNER AS TO MATERIALLY IMPEDE VISION BETWEEN A HEIGHT OF 2' AND 8.5' ABOVE THE GRADE, MEASURED AT THE CENTERLINE OF THE INTERSECTION, AND NO FOLIAGE BETWEEN 2' AND 10' AT MATURITY.3. PRESERVED OR PROTECTED TREES SHALL BE ALLOWED TO REMAIN IN A CLEAR VISIBILITY TRIANGLE PROVIDED ALL BRANCHES AND FOLIAGE IS REMOVED BETWEEN A HEIGHT OF 2' AND 8.5' ABOVE THE GRADE.
- Site Prep, Grading & Hardscape
- Carpentry & Cabinetry
- General Contractor
- Engineering & Architecture
- 1. Link to Strategic Goals /Objectives: N/A
- 1. Link to Strategic Goals /Objectives: N/A
- 1. Proof of Ownership
- 1. Proof of Ownership
- 2. Effect on Budget (EOB): N/A
- 2. Effect on Budget (EOB): N/A
- 2. Letter of Request
- 2. Letter of Request
- 3. Level of Service (LOS): N/A
- 3. Level of Service (LOS): N/A
- 3. Property Posting Affidavit
- 3. Property Posting Affidavit
- 4. AGENDA APPROVAL:
- 4. CURRENT BUSINESS
- 4. CURRENT BUSINESS
- 4. Posting Photo
- 4. Property Posting Photo
- 5. Abutter Notice
- 5. Abutter Notice
- 6. NEW BUSINESS:
- General Contractor
- Carpentry & Cabinetry
- Drywall & Insulation
- Painting & Flooring
- Plumbing
- HVAC & Climate Control
- Electrical
- Lighting & Low-Voltage Systems
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 6. Proposed Site Plan
- 6. Proposed Site Plan
- 7. Agent Affidavit
- 7. Agent Affidavit
- 8. Fire Support Letter
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- A. May 6, 2026 BOA Minutes
- A. May 6, 2026 BOA Minutes
- A. PZ-2026-48 - 35000 Emerald Coast Parkway Variance Request
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- A. PZ-2026-48 - 35000 Emerald Coast Parkway Variance Request
- General Contractor
- Engineering & Architecture
- Real Estate Development
- A. That special conditions or circumstances exist which are peculiar to the
- A. That special conditions or circumstances exist which are peculiar to the land,
- B. PZ-2026-69 - 751 Harbor Blvd. Variance Request
- General Contractor
- Engineering & Architecture
- Real Estate Development
- B. PZ-2026-69 - 751 Harbor Blvd. Variance Request
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Legal Services
- Landscaping & Lawn Service
- B. That special conditions and circumstances do not result from the actions of
- B. That special conditions and circumstances do not result from the actions of
- C. That granting the requested variance will not confer on the Applicant any
- C. That granting the requested variance will not confer on the Applicant any
- Cc: Tina Deater, Community Development Director
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- D. That literal interpretation of the provisions of any zoning ordinance would
- D. That literal interpretation of the provisions of any zoning ordinance would
- E. The variance granted is the minimum variance that will make possible the
- E. The variance granted is the minimum variance that will make possible the
- F. That the granting of the variance will be in harmony with the general
- F. That the granting of the variance will be in harmony with the general
- Legal Services
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Building & Industrial Supply
- Real Estate Development
- I. BACKGROUND:
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Landscaping & Lawn Service
- I. BACKGROUND: First Security Bank Inc. is proposing to redevelop the site at 35000
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Landscaping & Lawn Service
- Signage & Printing
- II. DISCUSSION:
- Engineering & Architecture
- Real Estate Development
- General Contractor
- Building & Industrial Supply
- Legal Services
- II. DISCUSSION:
- General Contractor
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- III. RECOMMENDATIONS:
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Waste Management
- III. RECOMMENDATIONS: First Security Bank Inc. is proposing to redevelop the site
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- IV. RECOMMENDED MOTION:
- IV. RECOMMENDED MOTION:
- i. Front setback. For properties that front U.S. Highway 98, 16 feet minimum to 26
- Engineering & Architecture
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Commercial Brokerage
- Commercial & Business Insurance
- Legal Services
- i. Front setback. For properties that front U.S. Highway 98, 16 feet minimum to 26 feet
- o. 321.234.2880
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Utilities (Sub)
- Building & Industrial Supply
- Engineering & Architecture
- Accounting & Tax
- Real Estate Development
- Landscaping & Lawn Service
Follow this across meetings
Board
Board of AdjustmentMira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.
Crea tu cuenta