5. FIRST STEP REVIEW (PRE-APPLICATION ITEMS)
Technical Review Committee · 2026-04-23 · agenda_item
Norman Stein is proposing development on two parcels. The first, at 728 S. 9th Street, currently has a structure that will be demolished. The proposal is for a commercial building with two residential units above. The second parcel, a vacant lot at 515 S. 8th Street, is zoned MU-8. Discussions included potential building height, tree mitigation, state road access, and the need for engineered drainage systems. This item is currently under review. The project could involve site clearing, demolition, utility work, foundation, framing, and finish trades for both commercial and residential spaces. Contractors, suppliers, and service providers are encouraged to engage early as plans and permits are still being determined.
- residential units
- 2
- height
- 35 feet
- tree mitigation
- 50 %
- tree pruning
- 20 %
- dwelling units
- 3
- standard height
- 45 feet
- asbestos and led paint
- 1 %
Industries that could win this work
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Roofing
- Drywall & Insulation
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
Follow this across meetings
Applicants and firms
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.
Crea tu cuenta