Skip to main content

Be First, Build Lasting Relationships

5. FIRST STEP REVIEW (PRE-APPLICATION ITEMS)

Technical Review Committee · 2026-04-23 · agenda_item

Norman Stein is proposing development on two parcels. The first, at 728 S. 9th Street, currently has a structure that will be demolished. The proposal is for a commercial building with two residential units above. The second parcel, a vacant lot at 515 S. 8th Street, is zoned MU-8. Discussions included potential building height, tree mitigation, state road access, and the need for engineered drainage systems. This item is currently under review. The project could involve site clearing, demolition, utility work, foundation, framing, and finish trades for both commercial and residential spaces. Contractors, suppliers, and service providers are encouraged to engage early as plans and permits are still being determined.

residential units
2
height
35 feet
tree mitigation
50 %
tree pruning
20 %
dwelling units
3
standard height
45 feet
asbestos and led paint
1 %

Industries that could win this work

  • General Contractor
  • Site Prep, Grading & Hardscape
  • Concrete & Masonry
  • Electrical
  • Plumbing
  • HVAC & Climate Control
  • Painting & Flooring
  • Roofing
  • Drywall & Insulation
  • Building & Industrial Supply
  • Real Estate Development
  • Engineering & Architecture
  • Landscaping & Lawn Service

Follow this across meetings

Applicants and firms

See the actual businesses behind these numbers

Get the real filings, with addresses and officers, backed by a 14-day money-back guarantee.

Create your account