Skip to main content

Sé el Primero, Construye Relaciones Duraderas

Agenda (PDF)

Bicycle Pedestrian Advisory Board · 2026-06-02 · agenda

[RTS Administration Building, 34 S.E 13th Road, Gainesville, Fl 32601 (meeting location); 10 SW 2nd Avenue, Gainesville, FL 32601 (GACTPO office); case 2026-358 (TIP); 2026-283 (SE 8th Avenue Shared Use Path); 2026-284 (UPWP); 2026-285 (TIP Amendment); 2026-286 (Draft TIP)] The document is a meeting agenda and minutes for the City of Gainesville Bicycle Pedestrian Advisory Board (BPAB), along with the final Transportation Improvement Plan (TIP) document. The primary action item is the recommendation for approval of the FY26/27-FY30/31 Transportation Improvement Program (TIP) (File Number 2026-358). The TIP is a five-year plan listing transportation projects within the Alachua County Transportation Management Area (TMA), consistent with the 2050 Long-Range Transportation Plan. The BPAB reviewed a draft at a 21 May 2026 meeting and staff returned with the final draft. The list of projects cannot be changed at this point. The TIP was approved by the GACTPO Board on June 15, 2026. The document also includes minutes from the April 21, 2026 BPAB meeting, which detail a presentation on the SE 8th Avenue Shared Use Path 30% Plans (File Number 2026-283), a recommendation for approval of the Final FY26/28 Unified Planning Work Program (File Number 2026-284), a recommendation for approval of an Amendment to FY26/30 Transportation Improvement Program (File Number 2026-285), and a recommendation for approval of the Draft FY26/27 to FY30/31 Transportation Improvement Program (File Number 2026-286). This document is a portion of the Gainesville Alachua County Transportation Planning Organization (GACTPO) Transportation Improvement Plan (TIP) for fiscal years 2026-2027 to 2030-2031. It lists multiple distinct projects with funding allocations. No single project is described in detail; each is a line item with a project name, type, lead agency, total cost, and funding schedule. No street addresses, parcel numbers, acreages, zoning changes, applicant names, or decisions are stated for any project. The document does not contain any public comment or stakeholder sentiment. The projects listed include: 4293032 - GAINESVILLE REG APT DESIGN & CONST T-HANGARS & TAXILANES (Aviation, Total Cost: $3,036,750); 4438031 - GAINESVILLE REGIONAL APT MAINTENANCE FACILITY PH 1 (Aviation, Lead Agency: Gainesville Alachua County, Total Cost: $1,366,538); 4329582 - GAINESVILLE REGIONAL APT DESIGN & CONSTRUCT TWY E CONNECTOR (Aviation, Total Cost: $1,852,266); 4285112 - GAINESVILLE REG APT GATES, ACCESS CONTROL, & FIBER UPGRADES (Aviation, Total Cost: $800,980); 4290362 - GAINESVILLE REGIONAL APT DESIGN & CONSTRUCT NEW GA TERMINAL (Aviation, Total Cost: $7,976,214); 4365942 - GAINESVILLE REG APT LAND ACQ TO FACILITATE OBSTACLE REMOVAL (Aviation, Total Cost: $4,004,901); 4365945 - GAINESVILLE REGIONAL APT PARKING LOT (Aviation, Total Cost: $1,315,926); 4438011 - GAINESVILLE REGIONAL APT INTERNAL SERVICE RD EXPANSION (Aviation, Lead Agency: Gainesville Alachua County, Total Cost: $290,355); 4400381 - GAINESVILLE REGIONAL APT DESIGN & REHAB GA ACCESS ROAD (Aviation, Lead Agency: Gainesville Regional Airport, Total Cost: $349,226); 4578231 - CARPET AND VINYL TILE REPLACEMENT (Misc, Lead Agency: City Of Gainesville, Total Cost: $196,665); 4512111 - PAINTING/CLEANING - INTERIOR & EXTERIOR (Misc, Lead Agency: City Of Gainesville, Total Cost: $243,199); 4512091 - GLASS WINDOW REPLACEMENTS (Misc, Lead Agency: City Of Gainesville, Total Cost: $66,233); 2094669 - GAINESVILLE MTPO CONTINGENCY - X52 (Other, Lead Agency: City Of Gainesville, Total Cost: $9,207,698); 2094663 - GAINESVILLE MTPO RESERVE X52 (Other, Lead Agency: City Of Gainesville, Total Cost: $4,702,007); 4393187 - GAINESVILLE MPO FY 2028/2029-2029/2030 UPWP (Planning, Total Cost: $1,923,594); 4393186 - GAINESVILLE MPO FY 2026/2027-2027/2028 UPWP (Planning, Total Cost: $1,923,594); 4393188 - GAINESVILLE MPO FY 2030/2031-2031/2032 UPWP (Planning, Total Cost: $961,797); 2075556 - SR235(NW 140TH ST) SOUTH OF PEGGY RD AT RR CROSSING NO. 625870E (Railroad, Lead Agency: City Of Gainesville, Total Cost: $568,670); 2112092 - NW 43RD ST NORTH OF NW16TH BLVD AND NW 23RD AVE (Access Management, Lead Agency: Alachua County Board Of County, Total Cost: $1,370,326); 4470323 - SR222(NW 39TH AVE) FROM SR121(NW 34TH ST) TO SR24(NE WALDO RD) (Landscaping, Lead Agency: City Of Gainesville, Total Cost: $2,569,253); 4436381 - SR24(ARCHER ROAD) FROM SOUTHWEST 16TH AVENUE TO SOUTHWEST 13TH STREET (Landscaping, Lead Agency: City Of Gainesville, Total Cost: $1,740,945); 4470322 - SR222(39TH AVE) FROM W OF I-75 TO SR121(NW 34TH ST) (Landscaping, Lead Agency: City Of Gainesville, Total Cost: $2,273,558); 2076584 - SR25(US441)SE 13TH/MLK JR.HWY FROM NORTH OF NW 23RD AVE TO NW 6TH ST (Landscaping, Lead Agency: City Of Gainesville, Total Cost: $1,499,263); 2076585 - SR25(US441)SANTA FE BLVD FROM SR20(US27) TO N OF NW 242ND ST (Landscaping, Lead Agency: City Of Gainesville, Total Cost: $899,869); 4398082 - SR26(W NEWBERRY RD) FROM NW 98TH ST TO W OF NW 75TH ST (Landscaping, Lead Agency: City Of Gainesville, Total Cost: $1,395,827); 4144031 - LIGHTING AGREEMENTS ALACHUA COUNTY (Lighting, Lead Agency: Alachua County Board Of County, Total Cost: $26,021,271); 2076583 - SR26(W UNIVERSITY AVE) FROM SR26A(SW 2ND AVE) TO SR25(US441)SW 13TH ST (Lighting, Lead Agency: City Of Gainesville, Total Cost: $5,424,438); 2149522 - I-75(SR93) NB ALACHUA COUNTY REST AREA (Rest Area, Lead Agency: City Of Gainesville, Total Cost: $9,803,194); 2078502 - SR26 CORRIDOR FROM GILCHRIST C/L TO CR26A E OF NEWBERRY (Road Lane Capacity, Lead Agency: City Of Gainesville, Total Cost: $93,357,256); 4230713 - I-75(SR93) @ SR121 (Road Lane Capacity, Lead Agency: City Of Gainesville, Total Cost: $10,826,214); 2077126 - SR121(34TH STREET) FROM SR331(SE WILLISTON RD) TO NW 16TH BLVD (State of Good Repair, Lead Agency: City Of Gainesville, Total Cost: $16,554,720); 2143015 - ALACHUA COUNTY DITCH CLEANING (State of Good Repair, Lead Agency: City Of Gainesville, Total Cost: $602,474); 2073553 - SR20(E UNIVERSITY AVE) FM SR24(NE WALDO RD) TO SR26(E UNIVERSITY AVE) (State of Good Repair, Lead Agency: City Of Gainesville, Total Cost: $1,733,938); 4432582 - SR20(SE HAWTHORNE RD) FROM WEST OF SE 211TH ST TO WEST OF NE 5TH ST (State of Good Repair, Lead Agency: City Of Gainesville, Total Cost: $6,495,883); 2075805 - SR26(UNIVERSITY AVE) FROM SR20(SE HAWTHORNE RD) TO SE 31ST STREET (State of Good Repair, Lead Agency: Alachua County Board Of County, Total Cost: $3,419,079); 4355582 - SR26(W UNIVERSITY AVE) FROM GALE LEMERAND DR TO SR24(NE WALDO RD) (State of Good Repair, Lead Agency: City Of Gainesville, Total Cost: $7,434,665); 2077565 - SR200(US301) FROM N OF SR26 TO SR24(NE WALDO RD) (State of Good Repair, Lead Agency: City Of Gainesville, Total Cost: $22,747,858); 4389053 - HERBICIDE IN ALACHUA COUNTY (State of Good Repair, Lead Agency: City Of Gainesville, Total Cost: $312,730); 2078175 - SR26(W UNIVERSITY AVE) FROM SW 38TH ST TO GALE LEMERAND DR (State of Good Repair, Lead Agency: City Of Gainesville, Total Cost: $6,423,088); 2077988 - SR45(US27) FROM SR24(ARCHER RD) TO SOUTH OF SR26(W NEWBERRY RD) (State of Good Repair, Lead Agency: City Of Gainesville, Total Cost: $9,524,692); 2075554 - SR24A/SR226(SW16TH AVE) FROM SR24(ARCHER RD) TO SR331(SE WILLISTON RD) (State of Good Repair, Lead Agency: City Of Gainesville, Total Cost: $5,290,363); 2143014 - ALACHUA (State of Good Repair, Lead Agency: City Of Gainesville, Total Cost: $38,938,176); 4389052 - CONCRETE REPAIRS IN ALACHUA COUNTY (State of Good Repair, Lead Agency: City Of Gainesville, Total Cost: $939,249); 4559731 - TARGETED OPEN GRADE FRICTION COURSE PROGRAM CONTINGENCY (State of Good Repair, Lead Agency: City Of Gainesville, Total Cost: $11,510,394); 4472031 - SR24(KENNARD ST) IN WALDO FROM NE 148TH AVE TO NE 144TH AVE (State of Good Repair, Lead Agency: City Of Gainesville, Total Cost: $8,564,827); 2149384 - ALACHUA COUNTY ROUTINE MAINTENANCE - INTERSTATE (State of Good Repair, Lead Agency: City Of Gainesville, Total Cost: $3,918,619); 2077902 - SR26A(SW 2ND AVE) FROM SR26(UNIVERSITY AVE) TO SR26(UNIVERSITY AVE) (State of Good Repair, Lead Agency: City Of Gainesville, Total Cost: $4,099,818); 4288053 - I-75(SR93) FROM NORTH OF CR234 TO SOUTH OF SE WACAHOOTA RD (State of Good Repair, Lead Agency: City Of Gainesville, Total Cost: $4,341,452); 2075804 - SR26(UNIVERSITY AVE) FROM 31ST ST TO SR222(NE 39TH BLVD) (State of Good Repair, Lead Agency: City Of Gainesville, Total Cost: $9,232,876); 4404914 - I-75(SR93) ALACHUA COUNTY ASSET MAINTENANCE (CONTRACTOR) (State of Good Repair, Lead Agency: City Of Gainesville, Total Cost: $33,984,636); 2077944 - SR200(US301) AT SE 57TH AVE (TSMO, Lead Agency: City Of Gainesville, Total Cost: $1,747,214); 4135171 - D2-ALACHUA COUNTY TRAFFIC SIGNAL MAINTENANCE AGREEMENT (TSMO, Lead Agency: Town Of Micanopy, Total Cost: $16,598,523); 4358901 - SR331 AT SE 4TH AVE, SE 2ND AVE, SR26, NE 16TH AVE, SR120 (TSMO, Lead Agency: City Of Gainesville, Total Cost: $6,522,194); 4498441 - SR24(SW ARCHER RD) AT SR121(SW34TH ST) (TSMO, Lead Agency: City Of Gainesville, Total Cost: $1,950,930); 4559861 - D-2 ALACHUA COUNTY TRAFFIC SIGNAL MAINTENANCE AGREEMENT (TSMO, Total Cost: $5,989,107); 4358891 - SR120(NW 23 AVE) & SR25(US441)(NW 13 ST) (TSMO, Lead Agency: City Of Gainesville, Total Cost: $2,966,662); 4553991 - I-75(SR93) SAFETY MEDIAN BARRIER INITIATIVE (Misc Safety, Lead Agency: City Of Gainesville, Total Cost: $4,199,016); 2155462 - GAINESVILLE RTS SECTION 5307 FORMULA GRANT OPERATING ASSISTANCE (Transit, Lead Agency: Gainesville, Total Cost: $43,000,000); 4272501 - ALACHUA COUNTY FED SEC 5311 RURAL TRANSIT FUNDING (Transit, Lead Agency: Alachua County, Total Cost: $7,895,806); 4474453 - COMPASS TRANSIT SERVICE GAINESVILLE RTS (Transit, Lead Agency: Gainesville, Total Cost: $10,222,848); 4117571 - GAINESVILLE RTS STATE BLOCK GRANT OPERATING FUNDS (Transit, Lead Agency: Gainesville, Total Cost: $96,073,685); 4040261 - GAINESVILLE RTS SEC 5307 FORMULA GRANT MISC CAPITAL PURCHASES (Transit, Lead Agency: Gainesville, Total Cost: $70,511,782); 4330762 - GAINESVILLE RTS NORTH MOBILITY-ON-DEMAND (Transit, Lead Agency: Gainesville, Total Cost: $1,029,732); 4415201 - ALACHUA CO RTS TRANSIT IMPROVEMENT SECTION 5339 (Transit, Lead Agency: Alachua County, Total Cost: $7,167,579). [SE 8th Avenue between SE 15th Street and SE Hawthorne Road, Gainesville, FL] The document is a compilation of appendices for the Gainesville & Alachua County Transportation Planning Organization (GACTPO) Transportation Improvement Plan Fiscal Years 2026-2027 to 2030-2031. It includes a Transportation Performance Measures Consensus Planning Document, a TIP Revision Log template, and a project update memorandum for the SE 8th Avenue Multiuse Trail (SE 15th St – SE Hawthorne Rd). The memorandum states the project is in design, with 30% plans presented to the Bicycle Pedestrian Advisory Board on April 21, 2026. A rest area with a shaded bench will be included; a bike repair station will not. Signage will direct trail users to the RTS Eastside Transfer Station, which will include public restrooms and water fountains. A community engagement session for the 60% plan set is scheduled for late July. Shade trees will be planted using tree mitigation funding. Crosswalks are planned at the south entrance to the Eastside Health and Economic Development Initiative (EHEDI) development and RTS Eastside Transfer Station, near SE 19th Terrace. A potential additional crosswalk will be evaluated based on neighbor feedback. Alachua County Public Works has been notified of a request for a crosswalk on the north side of the SE 15th Street/SE 8th Avenue intersection. Design and permitting are anticipated to be completed in late 2026, with construction beginning in Spring 2027. The construction plans show the project begins at station 00+00 and ends at station 36+87, with an exception beginning at station 29+61 and ending at station 34+59. The engineer of record is Elizabeth D. Waite, PE No. 78469, City of Gainesville, 306 NE 6th Ave, Gainesville, FL 32601. The document does not state a decision (approved/denied/deferred/recommended) for the trail project, nor does it state a case number, parcel/folio, acreage, or zoning/use change. The document does not state any public comment sentiment beyond the BPAB comments listed in the memorandum.

Agenda items

Follow this across meetings

Mira los negocios reales detrás de estos números

Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.

Crea tu cuenta