City Commission Meeting of August 25, 2026.
City Commission Meetings · 2026-08-25 · agenda
This document is an agenda for a City Commission meeting scheduled for August 25, 2026, at 4:30 p.m. at 840 West 11th Street. It lists multiple items for consideration, including public hearings, quasi-judicial hearings, consent agenda items, and discussion items. No decisions are recorded in the agenda itself. The document does not include any public comment or stakeholder sentiment. The meeting includes the following items: a public hearing on a proposed Developer Agreement with Zachary Seymour for a property at 101 E 7th Street (Parcel ID 20075-000-000); a public hearing on a proposed Gateway Overlay Special Exception for 1023 E 15th Street (Parcel ID 14450-000-000); the first of two public hearings on Ordinance 3314 amending Ordinance 3305 regarding the Panama City North Community Development District to correct a scrivener's error in legal description; the second and final public hearing on Ordinance 3311 amending the Zoning Map to reflect a zoning designation of Heavy Industrial, HI for a property at 1023 E 15th Street (Parcel ID 14450-000-000); consideration of approval of six firms for Bid PC25-052 Professional Services Contract; consideration and approval of a Task Order for Baskerville-Donovan, Inc. for supplemental mechanical and structural design services for the Tarpon Dock Bridge in the amount of $98,325.25; consideration and approval of a Right-of-Way Use Agreement for the property at 802 E. 8th Court; consideration of approval of Change Order 3 proposed by Emerald Coast Site Construction totaling $181,825.93 for PC25-038 SRF Baker Court Utility & Roadway Improvements; consideration to award a contract for ITB PC26-014 Project STORM Group I to Marshall Brothers in the amount of $1,199,749.00 with authorization for change orders up to $59,987.45; consideration of approval for award of Bid PC26-023 for the Truesdell Clubhouse Exterior Renovations in the amount of $498,797.47 to Art Construction of Northwest Florida LLC with a 10% project budget contingency of $49,879.75; discussion of City Clerk-Treasurer position; consideration of alternative financing option for the construction of Wet Slips at the Downtown Panama City Marina; consideration of award of bid PC26-021 for the construction of 50 wet slips in the western basin of the downtown Panama City Marina; discussion of FY27 Proposed Budget; consideration to approve Budget Amendment Resolution 20260825.1 to transfer $21,000.00 to the Panama City Police Department; consideration to approve resolution 20260825.2 authorizing the City to accept a state funded grant for Frankford Avenue Trail Design in the amount of $425,000.00 and approve budget amendment resolution 20260825.3.
Agenda items
- 052_8.25.26.PDF
- 052_8.25.26.PDF
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 052_8.25.26.PDF
- 052_8.25.26.PDF
- 08.11.2026 MINUTES COMMISSION MEETING.PDF
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 08.11.2026 MINUTES COMMISSION MEETING.PDF
- Real Estate Development
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Appraisal & Inspection
- Engineering & Architecture
- Landscaping & Lawn Service
- 08.11.2026 MINUTES COMMISSION MEETING.PDF
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Legal Services
- Title & Settlement Services
- 08.11.2026 MINUTES COMMISSION MEETING.PDF
- Real Estate Development
- Engineering & Architecture
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Carpentry & Cabinetry
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Building & Industrial Supply
- Title & Settlement Services
- Legal Services
- 1. All uses allowed in the LI zoning category.
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- 1. All uses allowed in the LI zoning category.
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- 1. Conform to the industrial performance standards as specified in chapter 12, article V of the
- 1. Conform to the industrial performance standards as specified in chapter 12, article V of the
- 1. Developments greater than 100,000 square feet shall designate a minimum 100 square foot area on
- Site Prep, Grading & Hardscape
- General Contractor
- Engineering & Architecture
- 1. Developments greater than 100,000 square feet shall designate a minimum 100 square foot area on
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Engineering & Architecture
- 1. Manufacturing and assembly.
- 1. Manufacturing and assembly.
- 1. Opening Prayer with City Attorney Nevin Zimmerman , Elder, First Presbyterian
- 1. Opening Prayer with City Attorney Nevin Zimmerman , Elder, First Presbyterian
- 1. Recitals. The above recitals are true and correct in all material respects, form an integral
- 1. Recitals. The above recitals are true and correct in all material respects, form an integral
- 1. Seasonal sales items shall not occupy any required parking spaces, parking lot aisles, or required
- Legal Services
- Engineering & Architecture
- 1. Seasonal sales items shall not occupy any required parking spaces, parking lot aisles, or required
- 1. The following uses are prohibited in the GO:
- 1. The following uses are prohibited in the GO:
- 1. The impervious surface ratio (ISR) shall be no greater than 0.80 of the total parcel area.
- 1. The impervious surface ratio (ISR) shall be no greater than 0.80 of the total parcel area.
- 1. The impervious surface ratio (ISR) shall be no greater than 0.80 of the total parcel area.
- 1. The impervious surface ratio (ISR) shall be no greater than 0.80 of the total parcel area.
- 1. U.S. Highway 98/15th Street;
- 1. U.S. Highway 98/15th Street;
- 10. Commissioners' Report(s).
- 10. Commissioners' Report(s).
- 11. City Clerk-Treasurer.
- 11. City Clerk-Treasurer.
- 11. Industrial (I)
- 11. Industrial (I)
- 13. Motion to Adjourn.
- General Contractor
- Carpentry & Cabinetry
- Roofing
- Windows, Doors & Glass
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Legal Services
- Lending & Credit
- 13. Motion to Adjourn.
- General Contractor
- Carpentry & Cabinetry
- Roofing
- Windows, Doors & Glass
- Plumbing
- Electrical
- HVAC & Climate Control
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Legal Services
- Landscaping & Lawn Service
- 2. Developer Mitigation. Developer agrees that as soon as practicable after closing on the
- General Contractor
- Restoration & Waterproofing
- Roofing
- Windows, Doors & Glass
- Building & Industrial Supply
- Engineering & Architecture
- Legal Services
- Real Estate Development
- 2. Developer Mitigation. Developer agrees that as soon as practicable after closing on the
- General Contractor
- Restoration & Waterproofing
- Roofing
- Windows, Doors & Glass
- Engineering & Architecture
- Real Estate Development
- 2. Harrison Avenue, from 15th Street (U.S. Highway 98) to the Panama City Marina;
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Concrete & Masonry
- General Contractor
- Building & Industrial Supply
- 2. Harrison Avenue, from 15th Street (U.S. Highway 98) to the Panama City Marina;
- 2. Private and commercial marinas and marine facilities.
- 2. Private and commercial marinas and marine facilities.
- 2. Provide off-street parking as specified in chapter 108.
- 2. Provide off-street parking as specified in chapter 108.
- 2. Scrap processing.
- 2. Scrap processing.
- 2. Special exceptions to prohibited uses: The city commission may by a super majority, on a case -by-case
- 2. Special exceptions to prohibited uses: The city commission may by a super majority, on a case -by-case
- 2. The floor area ratio shall not exceed 0.85.
- 2. The floor area ratio shall not exceed 0.85.
- 2. The floor area ratio shall not exceed 1.0.
- 2. The floor area ratio shall not exceed 1.0.
- 3. Business park.
- 3. Business park.
- 3. Developer Actions for Mitigation. Developer agrees that during the process of
- 3. Developer Actions for Mitigation. Developer agrees that during the process of
- 3. Highway 368/23rd Street;
- 3. Highway 368/23rd Street;
- 3. Landscaping and buffering is required as specified in chapter 107.
- 3. Landscaping and buffering is required as specified in chapter 107.
- 3. No maximum height.
- 3. No maximum height.
- 3. No maximum height.
- 3. No maximum height.
- 3. Recycling centers.
- 3. Recycling centers.
- 4. Additions, Deletions and Modifications.
- 4. Additions, Deletions and Modifications.
- 4. Business U.S. Highway 98;
- 4. Business U.S. Highway 98;
- 4. Code Enforcement Liens . In accordance with Resolution 20200623.3, specifically
- Legal Services
- Accounting & Tax
- Lending & Credit
- Real Estate Development
- Commercial Brokerage
- Residential Brokerage
- Business Consulting
- 4. Code Enforcement Liens . In accordance with Resolution 20200623.3, specifically
- Legal Services
- 4. Complete a compatibility analysis of the proposed use with the existing adjacent uses and the
- Engineering & Architecture
- Real Estate Development
- Site Prep, Grading & Hardscape
- 4. Complete a compatibility analysis of the proposed use with the existing adjacent uses and the
- Engineering & Architecture
- Business Consulting
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Building & Industrial Supply
- 4. Minimum setbacks shall be:
- 4. Minimum setbacks shall be:
- 4. Minimum setbacks shall be:
- 4. Minimum setbacks shall be:
- 4. Vocational trade and industrial education.
- 4. Vocational trade and industrial education.
- 5. CRA Grant/Impact Fees. The Developer may apply for the TIF Rebate Grant Program
- Real Estate Development
- Engineering & Architecture
- Building & Industrial Supply
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Roofing
- Drywall & Insulation
- Commercial & Business Insurance
- Legal Services
- Accounting & Tax
- 5. Community Announcements.
- 5. Community Announcements.
- 5. Highway 390;
- 5. Highway 390;
- 6. General Provisions.
- 6. General Provisions.
- 6. Highway 77;
- 6. Highway 77;
- 6. Public Hearings.
- Engineering & Architecture
- Real Estate Development
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Landscaping & Lawn Service
- 6. Public Hearings.
- Engineering & Architecture
- Real Estate Development
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- 6. Towing establishments and yards.
- 6. Towing establishments and yards.
- 7. Quasi-Judicial Hearings.
- General Contractor
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Roofing
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Real Estate Development
- Building & Industrial Supply
- 7. Quasi-Judicial Hearings.
- Real Estate Development
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- 7. U.S. Highway 231, from 23rd Street to 15th Street; and
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Construction (Other)
- General Contractor
- Lighting & Low-Voltage Systems
- Utilities (Sub)
- Building & Industrial Supply
- Engineering & Architecture
- Landscaping & Lawn Service
- 7. U.S. Highway 231, from 23rd Street to 15th Street; and
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Concrete & Masonry
- General Contractor
- Building & Industrial Supply
- 8. 11th Street, from Lisenby Avenue to Beck Avenue
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Roofing
- Drywall & Insulation
- Carpentry & Cabinetry
- Windows, Doors & Glass
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Landscaping & Lawn Service
- 8. 11th Street, from Lisenby Avenue to Beck Avenue
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Roofing
- Drywall & Insulation
- Carpentry & Cabinetry
- Windows, Doors & Glass
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- 840 WEST 11TH STREET
- 840 WEST 11TH STREET
- 840 WEST 11TH STREET
- 840 WEST 11TH STREET
- 9. Consent Agenda.
- 9. Consent Agenda.
- Lending & Credit
- Payment Processing & Merchant Services
- Accounting & Tax
- Business Consulting
- A. Purpose. The purpose of the Gateway Overlay (GO) is to promote the general health, safety and welfare of
- Site Prep, Grading & Hardscape
- General Contractor
- Engineering & Architecture
- Real Estate Development
- Building & Industrial Supply
- Landscaping & Lawn Service
- A. Purpose. The purpose of the Gateway Overlay (GO) is to promote the general health, safety and welfare of
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- Real Estate Development
- A. The following bulk regulations shall apply to property zoned as HI.
- A. The following bulk regulations shall apply to property zoned as HI.
- A. The following bulk regulations shall apply to property zoned as LI:
- A. The following bulk regulations shall apply to property zoned as LI:
- AGENDA ITEM - CONTINUING SERVICES CONTRACT PC25
- AGENDA ITEM - CONTINUING SERVICES CONTRACT PC25
- AGENDA ITEM - CONTINUING SERVICES CONTRACT PC25
- AGENDA ITEM - CONTINUING SERVICES CONTRACT PC25
- AGENDA ITEM - FDOT FRANKFORD AVE TRAIL GRANT.PDF
- AGENDA ITEM - FDOT FRANKFORD AVE TRAIL GRANT.PDF
- AGENDA ITEM - RIGHT OF WAY USE - HOLY TEMPLE COG.PDF
- AGENDA ITEM - RIGHT OF WAY USE - HOLY TEMPLE COG.PDF
- AGENDA ITEM - RIGHT OF WAY USE - HOLY TEMPLE COG.PDF
- AGENDA ITEM - RIGHT OF WAY USE - HOLY TEMPLE COG.PDF
- AGENDA ITEM - TARPON DOCK MECHANICAL SUPPLEMENT 082526.PDF
- AGENDA ITEM - TARPON DOCK MECHANICAL SUPPLEMENT 082526.PDF
- AGENDA ITEM - TARPON DOCK MECHANICAL SUPPLEMENT 082526.PDF
- AGENDA ITEM - TARPON DOCK MECHANICAL SUPPLEMENT 082526.PDF
- Construction (Other)
- General Contractor
- Electrical
- Plumbing
- HVAC & Climate Control
- Building & Industrial Supply
- Engineering & Architecture
- Government Authority
- AGENDA ITEM REQUES POLICE DEPT TRAINING.PDF
- AGENDA ITEM REQUES POLICE DEPT TRAINING.PDF
- AGENDA ITEM REQUEST ALTERNATIVE FUNDING OPTION FOR
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Windows, Doors & Glass
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- AGENDA ITEM REQUEST ALTERNATIVE FUNDING OPTION FOR
- AGENDA ITEM REQUEST ALTERNATIVE FUNDING OPTION FOR
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- AGENDA ITEM REQUEST ALTERNATIVE FUNDING OPTION FOR
- AGENDA ITEM REQUEST BAKER COURT CHANGE ORDER 3.PDF
- AGENDA ITEM REQUEST BAKER COURT CHANGE ORDER 3.PDF
- AGENDA ITEM REQUEST BAKER COURT CHANGE ORDER 3.PDF
- AGENDA ITEM REQUEST BAKER COURT CHANGE ORDER 3.PDF
- AGENDA ITEM REQUEST DOWNTOWN MARINA FIRST 50 WET
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Plumbing
- Electrical
- Construction (Other)
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Waste Management
- AGENDA ITEM REQUEST DOWNTOWN MARINA FIRST 50 WET
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Plumbing
- Electrical
- Construction (Other)
- Utilities (Sub)
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- AGENDA ITEM REQUEST DOWNTOWN MARINA FIRST 50 WET
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- AGENDA ITEM REQUEST DOWNTOWN MARINA FIRST 50 WET
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- Construction (Other)
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- AGENDA ITEM REQUEST TRUESDELL EXTERIOR - 2026 08 17.PDF
- AGENDA ITEM REQUEST TRUESDELL EXTERIOR - 2026 08 17.PDF
- AGENDA ITEM REQUEST TRUESDELL EXTERIOR - 2026 08 17.PDF
- AGENDA ITEM REQUEST TRUESDELL EXTERIOR - 2026 08 17.PDF
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- AGENDA PACKET_1023 E 15TH ST_GATEWAY OVERLAY
- Real Estate Development
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Windows, Doors & Glass
- Building & Industrial Supply
- Engineering & Architecture
- Landscaping & Lawn Service
- AGENDA PACKET_1023 E 15TH ST_GATEWAY OVERLAY
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- AGENDA REQUEST 3311_1023 E 15TH STREET_REZONING.PDF
- Legal Services
- Engineering & Architecture
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Carpentry & Cabinetry
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Building & Industrial Supply
- Real Estate Development
- AGENDA REQUEST 3311_1023 E 15TH STREET_REZONING.PDF
- AGENDA REQUEST 3311_1023 E 15TH STREET_REZONING.PDF
- Engineering & Architecture
- Business Consulting
- Legal Services
- Accounting & Tax
- Professional Services (Other)
- AGENDA REQUEST 3311_1023 E 15TH STREET_REZONING.PDF
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- AGREEMENT.PDF
- AGREEMENT.PDF
- AGREEMENT_TRUESDELL_FINAL.PDF
- General Contractor
- Concrete & Masonry
- Electrical
- Plumbing
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Government Authority
- AGREEMENT_TRUESDELL_FINAL.PDF
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- Construction (Other)
- Utilities (Sub)
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- AGREEMENT_TRUESDELL_FINAL.PDF
- General Contractor
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Engineering & Architecture
- Real Estate Development
- Building & Industrial Supply
- Commercial & Business Insurance
- Lending & Credit
- Government Authority
- AGREEMENT_TRUESDELL_FINAL.PDF
- General Contractor
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- AIR - PROJECT STORM GROUP I.PDF
- AIR - PROJECT STORM GROUP I.PDF
- AIR - PROJECT STORM GROUP I.PDF
- AIR - PROJECT STORM GROUP I.PDF
- ATTACHMENT A - FDEP LETTER OF EXEMPTION - FIRST FIFTY SLIPS DT
- ATTACHMENT A - FDEP LETTER OF EXEMPTION - FIRST FIFTY SLIPS DT
- ATTACHMENT A - FDEP LETTER OF EXEMPTION - FIRST FIFTY SLIPS DT
- ATTACHMENT A - FDEP LETTER OF EXEMPTION - FIRST FIFTY SLIPS DT
- ATTACHMENT A - LETTER FROM CITY ATTORNEY TO COMMISSIONERS
- ATTACHMENT A - LETTER FROM CITY ATTORNEY TO COMMISSIONERS
- ATTACHMENT A - LETTER FROM CITY ATTORNEY TO COMMISSIONERS
- ATTACHMENT A - LETTER FROM CITY ATTORNEY TO COMMISSIONERS
- ATTACHMENT B - BID TAB PC 26-021 DT MARINA FIRST 50 WET
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Plumbing
- Electrical
- Utilities (Sub)
- Building & Industrial Supply
- ATTACHMENT B - BID TAB PC 26-021 DT MARINA FIRST 50 WET
- ATTACHMENT B - BID TAB PC 26-021 DT MARINA FIRST 50 WET
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- General Contractor
- Utilities (Sub)
- Building & Industrial Supply
- ATTACHMENT B - SUMMARY MEMO DATED MARCH 4, 2024 REGARDING
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- ATTACHMENT B - SUMMARY MEMO DATED MARCH 4, 2024 REGARDING
- ATTACHMENT B - SUMMARY MEMO DATED MARCH 4, 2024 REGARDING
- ATTACHMENT B - SUMMARY MEMO DATED MARCH 4, 2024 REGARDING
- ATTACHMENT C - 2026-08-03_THA_BID EVALUATION AND
- ATTACHMENT C - 2026-08-03_THA_BID EVALUATION AND
- ATTACHMENT C - 2026-08-03_THA_BID EVALUATION AND
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Windows, Doors & Glass
- Landscaping & Lawn Service
- ATTACHMENT C - PREPAYMENT OF RENT AGREEMENT BETWEEN JOE
- ATTACHMENT C - PREPAYMENT OF RENT AGREEMENT BETWEEN JOE
- ATTACHMENT C - PREPAYMENT OF RENT AGREEMENT BETWEEN JOE
- ATTACHMENT C - PREPAYMENT OF RENT AGREEMENT BETWEEN JOE
- ATTACHMENT D - MEMO ON ESTIMATE OF PROBABLE COST FOR FIRST
- ATTACHMENT D - MEMO ON ESTIMATE OF PROBABLE COST FOR FIRST
- ATTACHMENT D - MEMO ON ESTIMATE OF PROBABLE COST FOR FIRST
- ATTACHMENT E - - DEVELOPMENT ORDER FOR DOWNTOWN MARINA
- General Contractor
- Site Prep, Grading & Hardscape
- Construction (Other)
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Landscaping & Lawn Service
- Government Authority
- ATTACHMENT E - - DEVELOPMENT ORDER FOR DOWNTOWN MARINA
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Construction (Other)
- Utilities (Sub)
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- ATTACHMENT E - - DEVELOPMENT ORDER FOR DOWNTOWN MARINA
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- B. District defined. The Gateway Overlay (GO) district applies to non-residential land parcels of record within
- Real Estate Development
- General Contractor
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- B. District defined. The Gateway Overlay (GO) district applies to non-residential land parcels of record within
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- B. The following uses are allowed in HI zoning districts; all other uses are prohibited.
- B. The following uses are allowed in HI zoning districts; all other uses are prohibited.
- B. The following uses are allowed in LI zoning districts; all other uses are prohibited:
- B. The following uses are allowed in LI zoning districts; all other uses are prohibited:
- BACKUP - 260814_HRP TRUESDELL FACILITY_PROJECT BID AWARD REC
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- BACKUP - 260814_HRP TRUESDELL FACILITY_PROJECT BID AWARD REC
- BACKUP - 260814_HRP TRUESDELL FACILITY_PROJECT BID AWARD REC
- BACKUP - 455261-1_CR 385 FRANKFORD AVE_BAYCO_DRAFT
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Concrete & Masonry
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- BACKUP - 7A-A105-2017_SHORT FORM
- BACKUP - 7A-A105-2017_SHORT FORM
- BACKUP - 7A-A105-2017_SHORT FORM
- BACKUP - 7A-A105-2017_SHORT FORM
- BACKUP - BID RECOMMENDATION LETTER - PANAMA CITY PROJECT
- BACKUP - BID RECOMMENDATION LETTER - PANAMA CITY PROJECT
- BACKUP - BID RECOMMENDATION LETTER - PANAMA CITY PROJECT
- BACKUP - BID RECOMMENDATION LETTER - PANAMA CITY PROJECT
- BACKUP - BID TABULATION - PC PROJECT STORM GROUP I.PDF
- BACKUP - BID TABULATION - PC PROJECT STORM GROUP I.PDF
- BACKUP - BID TABULATION - PC PROJECT STORM GROUP I.PDF
- BACKUP - BID TABULATION - PC PROJECT STORM GROUP I.PDF
- BACKUP - RES. 20260825.2 GRANT FRANKFORD AVE. TRAIL
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Real Estate Development
- BACKUP - RES. 20260825.2 GRANT FRANKFORD AVE. TRAIL
- Site Prep, Grading & Hardscape
- Construction (Other)
- Landscaping & Lawn Service
- BACKUP - ROW DRAFT AGREEMENT.PDF
- BACKUP - ROW DRAFT AGREEMENT.PDF
- BACKUP - ROW DRAFT AGREEMENT.PDF
- BACKUP - ROW DRAFT AGREEMENT.PDF
- BACKUP - SITE PLAN-C-5_CP_17592380967790.PDF
- General Contractor
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- BACKUP - SITE PLAN-C-5_CP_17592380967790.PDF
- General Contractor
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- BACKUP - SITE PLAN-C-5_CP_17592380967790.PDF
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Plumbing
- Electrical
- Utilities (Sub)
- Building & Industrial Supply
- BACKUP - SITE PLAN-C-5_CP_17592380967790.PDF
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Concrete & Masonry
- General Contractor
- Building & Industrial Supply
- BACKUP - SUPPLEMENTAL TASK ORDER (MECHANICAL) - FRANK
- BACKUP - SUPPLEMENTAL TASK ORDER (MECHANICAL) - FRANK
- BACKUP - SUPPLEMENTAL TASK ORDER (MECHANICAL) - FRANK
- BACKUP - SUPPLEMENTAL TASK ORDER (MECHANICAL) - FRANK
- BACKUP - TRUESDELL_FACILITY_CERTIFIED_BID_TABULATION_FLA.PDF
- BACKUP - TRUESDELL_FACILITY_CERTIFIED_BID_TABULATION_FLA.PDF
- BACKUP - TRUESDELL_FACILITY_CERTIFIED_BID_TABULATION_FLA.PDF
- BACKUP - TRUESDELL_FACILITY_CERTIFIED_BID_TABULATION_FLA.PDF
- BAKER COURT CHANGE ORDER 3 - 08.17.2026.PDF
- BAKER COURT CHANGE ORDER 3 - 08.17.2026.PDF
- BAKER COURT CHANGE ORDER 3 - 08.17.2026.PDF
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- BAKER COURT CHANGE ORDER 3 - 08.17.2026.PDF
- BAKER COURT PROJECT MAP.PDF
- General Contractor
- Utilities (Sub)
- Building & Industrial Supply
- BAKER COURT PROJECT MAP.PDF
- General Contractor
- Utilities (Sub)
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- BAKER COURT PROJECT MAP.PDF
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Utilities (Sub)
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- BAKER COURT PROJECT MAP.PDF
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Concrete & Masonry
- General Contractor
- Building & Industrial Supply
- BUDGET AMENDMENT RESOLUTION 20260825.1.PDF
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- BUDGET AMENDMENT RESOLUTION 20260825.1.PDF
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- C. Additional requirements:
- C. Additional requirements:
- C. Design requirements. Refer to chapter 105 for design requirements in the GO.
- C. Design requirements. Refer to chapter 105 for design requirements in the GO.
- C101 - COVER SHEET.PDF
- C105 - OVERALL UTILITY PLAN.PDF
- C520 AGREEMENT_PROJECT STORM GROUP I_DRAFT 082526.PDF
- General Contractor
- Concrete & Masonry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Restoration & Waterproofing
- Roofing
- Site Prep, Grading & Hardscape
- Windows, Doors & Glass
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- Cleaning & Janitorial
- C520 AGREEMENT_PROJECT STORM GROUP I_DRAFT 082526.PDF
- General Contractor
- Concrete & Masonry
- Carpentry & Cabinetry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Site Prep, Grading & Hardscape
- Windows, Doors & Glass
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Cleaning & Janitorial
- C520 AGREEMENT_PROJECT STORM GROUP I_DRAFT 082526.PDF
- General Contractor
- Concrete & Masonry
- Carpentry & Cabinetry
- Roofing
- Painting & Flooring
- Restoration & Waterproofing
- Building & Industrial Supply
- C520 AGREEMENT_PROJECT STORM GROUP I_DRAFT 082526.PDF
- General Contractor
- Restoration & Waterproofing
- Roofing
- Painting & Flooring
- Concrete & Masonry
- Carpentry & Cabinetry
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- CONTINUING SERVICES CONTRACTS
- CONTINUING SERVICES CONTRACTS
- CONTINUING SERVICES CONTRACTS
- CONTINUING SERVICES CONTRACTS
- D. Prohibited uses:
- D. Prohibited uses:
- DOWNTOWN MARINA FIRST 50 WET SLIPS CONSTRUCTION.PDF
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Construction (Other)
- Utilities (Sub)
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- DOWNTOWN MARINA FIRST 50 WET SLIPS CONSTRUCTION.PDF
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Utilities (Sub)
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Landscaping & Lawn Service
- DOWNTOWN MARINA FIRST 50 WET SLIPS CONSTRUCTION.PDF
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Concrete & Masonry
- Construction (Other)
- General Contractor
- Plumbing
- Electrical
- Building & Industrial Supply
- Real Estate Development
- Marine Services & Boat Repair
- DOWNTOWN MARINA FIRST 50 WET SLIPS CONSTRUCTION.PDF
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Concrete & Masonry
- Construction (Other)
- E. Transit facilities:
- E. Transit facilities:
- EMAIL.PDF
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Utilities (Sub)
- EMAIL.PDF
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Government Authority
- EXCEPTION.PDF
- EXCEPTION.PDF
- EXCEPTION.PDF
- EXCEPTION.PDF
- F. Seasonal sales:
- F. Seasonal sales:
- FIFTY SLIPS DT MARINA_17AUG2026.PDF
- FIFTY SLIPS DT MARINA_17AUG2026.PDF
- FIFTY SLIPS DT MARINA_17AUG2026.PDF
- FORM.PDF
- Real Estate Development
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Engineering & Architecture
- Landscaping & Lawn Service
- FORM.PDF
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- FORM.PDF
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Plumbing
- Electrical
- HVAC & Climate Control
- Building & Industrial Supply
- Engineering & Architecture
- FORM.PDF
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- LEASE WITH JOE PCOZ AT DOWNTOWN MARINA.PDF
- LEASE WITH JOE PCOZ AT DOWNTOWN MARINA.PDF
- LEASE WITH JOE PCOZ AT DOWNTOWN MARINA.PDF
- LEASE WITH JOE PCOZ AT DOWNTOWN MARINA.PDF
- LETTER_FLA.PDF
- LETTER_FLA.PDF
- LETTER_FLA.PDF
- LETTER_FLA.PDF
- MAP - PROJECT LOCATION FIRST 50 WET SLIPS AT DOWNTOWN
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- General Contractor
- Construction (Other)
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- MAP - PROJECT LOCATION FIRST 50 WET SLIPS AT DOWNTOWN
- General Contractor
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- MARINA.PDF
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Construction (Other)
- Utilities (Sub)
- Building & Industrial Supply
- MARINA.PDF
- MARINA.PDF
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Building & Industrial Supply
- Real Estate Development
- MARINA.PDF
- MARINA.PDF
- MARINA.PDF
- MARINA.PDF
- MARINA.PDF
- MEMO_PRELIMINARY AMORTIZATION SCHEDULE_WITH MAYOR BRANCH
- MEMO_PRELIMINARY AMORTIZATION SCHEDULE_WITH MAYOR BRANCH
- MEMO_PROPOSED FY 27 BUDGET COVER LETTER_18AUG2026.PDF
- MEMO_PROPOSED FY 27 BUDGET COVER LETTER_18AUG2026.PDF
- NELSON BRIDGE REFURBISHMENT - 13 AUGUST 2026.PDF
- General Contractor
- Concrete & Masonry
- Painting & Flooring
- Restoration & Waterproofing
- Construction (Other)
- Building & Industrial Supply
- Engineering & Architecture
- Legal Services
- Waste Management
- NELSON BRIDGE REFURBISHMENT - 13 AUGUST 2026.PDF
- Concrete & Masonry
- Site Prep, Grading & Hardscape
- General Contractor
- Painting & Flooring
- Restoration & Waterproofing
- Roofing
- Engineering & Architecture
- Building & Industrial Supply
- NELSON BRIDGE REFURBISHMENT - 13 AUGUST 2026.PDF
- General Contractor
- Concrete & Masonry
- Restoration & Waterproofing
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Engineering & Architecture
- Building & Industrial Supply
- NELSON BRIDGE REFURBISHMENT - 13 AUGUST 2026.PDF
- General Contractor
- Concrete & Masonry
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Utilities (Sub)
- ON FINANCE AGREEMENT WITH JOE PCOZ, LLC AND THE CITY.PDF
- ON FINANCE AGREEMENT WITH JOE PCOZ, LLC AND THE CITY.PDF
- ON FINANCE AGREEMENT WITH JOE PCOZ, LLC AND THE CITY.PDF
- ON FINANCE AGREEMENT WITH JOE PCOZ, LLC AND THE CITY.PDF
- ORD 3314 PC NORTH CDD AGENDA REQUEST FORM.PDF
- General Contractor
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Engineering & Architecture
- ORD 3314 PC NORTH CDD AGENDA REQUEST FORM.PDF
- General Contractor
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Real Estate Development
- Building & Industrial Supply
- ORD 3314 PC NORTH CDD AGENDA REQUEST FORM.PDF
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- ORD 3314 PC NORTH CDD AGENDA REQUEST FORM.PDF
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- Legal Services
- PANAMA CITY DOWNTOWN MARINA UTILITY IMPROVEMENTS PROJECT
- Utilities (Sub)
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- PC GRAMMAR SCHOOL DEVELOPER AGREEMENT AGENDA REQUEST
- Real Estate Development
- General Contractor
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Title & Settlement Services
- Engineering & Architecture
- PC GRAMMAR SCHOOL DEVELOPER AGREEMENT AGENDA REQUEST
- Real Estate Development
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Carpentry & Cabinetry
- Roofing
- Building & Industrial Supply
- Title & Settlement Services
- Engineering & Architecture
- PC GRAMMAR SCHOOL DEVELOPER AGREEMENT AGENDA REQUEST
- PC GRAMMAR SCHOOL DEVELOPER AGREEMENT AGENDA REQUEST
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- PCOZ, LLC AND THE CITY.PDF
- PCOZ, LLC AND THE CITY.PDF
- PCOZ, LLC AND THE CITY.PDF
- PCOZ, LLC AND THE CITY.PDF
- PROJECT.PDF
- PROJECT.PDF
- PROPOSED DOCUMENT.PDF
- PROPOSED DOCUMENT.PDF
- Government Authority
- RECOMMENDATION-PC26-021.PDF
- RECOMMENDATION-PC26-021.PDF
- RECOMMENDATION-PC26-021.PDF
- REQUEST FOR PROPOSALS
- REQUEST FOR PROPOSALS
- REQUEST FOR PROPOSALS
- REQUEST FOR PROPOSALS
- RFQ NO. 25-052_8.25 CHECKLIST 082526.PDF
- Engineering & Architecture
- General Contractor
- RFQ NO. 25-052_8.25 CHECKLIST 082526.PDF
- Engineering & Architecture
- RFQ NO. 25-052_8.25 CHECKLIST 082526.PDF
- Engineering & Architecture
- General Contractor
- RFQ NO. 25-052_8.25 CHECKLIST 082526.PDF
- Engineering & Architecture
- General Contractor
- SLIPS.PDF
- SLIPS.PDF
- SLIPS.PDF
- SLIPS_FINAL-25AUG2026.PDF
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- SLIPS_FINAL-25AUG2026.PDF
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- SLIPS_FINAL-25AUG2026.PDF
- SLIPS_FINAL-25AUG2026.PDF
- STORM GROUP I (1).PDF
- STORM GROUP I (1).PDF
- STORM GROUP I (1).PDF
- STORM GROUP I (1).PDF
- SUMMARY.PDF
- UPLAND IMPROVEMENTS PHASE 1.PDF
- UPLAND IMPROVEMENTS PHASE 1.PDF
- UPLAND IMPROVEMENTS PHASE 1.PDF
- a) Developer Agreement
- a) Developer Agreement
- a) Industrial Future Land Use Category
- a) Industrial Future Land Use Category
- a) Intent: This category is intended to provide opportunities for various industrial operations
- a) Intent: This category is intended to provide opportunities for various industrial operations
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Drywall & Insulation
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Waste Management
- a. Applying for a Development Order - Developer agrees to submit a site plan(s) with
- Real Estate Development
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Windows, Doors & Glass
- Building & Industrial Supply
- Appraisal & Inspection
- Engineering & Architecture
- a. Applying for a Development Order - Developer agrees to submit a site plan(s) with
- Site Prep, Grading & Hardscape
- General Contractor
- Engineering & Architecture
- Real Estate Development
- Building & Industrial Supply
- a. Developer agrees to pay the Hard Costs at Closing. At Closing, the City shall also
- Real Estate Development
- Legal Services
- Engineering & Architecture
- a. Developer agrees to pay the Hard Costs at Closing. At Closing, the City shall also
- Real Estate Development
- General Contractor
- Site Prep, Grading & Hardscape
- Legal Services
- Engineering & Architecture
- b) Impervious Surface Area: No more than 0.90 lot coverage.
- b) Impervious Surface Area: No more than 0.90 lot coverage.
- b) Location Map
- b) Location Map
- b) Sec. 104-66. - Gateway Overlay (GO)
- b) Sec. 104-66. - Gateway Overlay (GO)
- b. Site Plan Review - City agrees to conduct the site plan review by the Technical
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- b. Site Plan Review - City agrees to conduct the site plan review by the Technical
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Carpentry & Cabinetry
- Drywall & Insulation
- General Contractor
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- b. The City shall not waive any new or additional hard costs incurred by the City
- b. The City shall not waive any new or additional hard costs incurred by the City
- b. Time. Time is of the essence in this Agreement.
- b. Time. Time is of the essence in this Agreement.
- c) Density: None.
- c) Density: None.
- c) Proposed Conceptual Schematics of Future Project
- General Contractor
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- c) Proposed Conceptual Schematics of Future Project
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Landscaping & Lawn Service
- c) Sec. 104-39. - Light Industrial (LI) zoning district.
- c) Sec. 104-39. - Light Industrial (LI) zoning district.
- c. Developer agrees to pay the Waived Fines if Developer fails to perform the requisite
- c. Developer agrees to pay the Waived Fines if Developer fails to perform the requisite
- c. Development Order Approval - City agrees to approve the proposed development
- c. Development Order Approval - City agrees to approve the proposed development
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- c. Remedies. All rights and remedies conferred upon the parties in this Agreement
- c. Remedies. All rights and remedies conferred upon the parties in this Agreement
- d) Intensity: The floor area ratio shall not exceed 0.70.
- d) Intensity: The floor area ratio shall not exceed 0.70.
- d) Promissory Note
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Restoration & Waterproofing
- Roofing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- d) Promissory Note
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- Title & Settlement Services
- d) Sec. 104-40. - Heavy Industrial (HI) zoning district
- d) Sec. 104-40. - Heavy Industrial (HI) zoning district
- d. Obtain Building Permit - Developer agrees to apply for a building permit(s)
- d. Obtain Building Permit - Developer agrees to apply for a building permit(s)
- d. Subordination. The City agrees to subordinate this Agreement and the Promissory
- d. Subordination. The City agrees to subordinate this Agreement and the Promissory
- e) Adopted Map Series (Aerial, Future Land Use, Zoning, Gateway Overlay and
- Engineering & Architecture
- Legal Services
- Real Estate Development
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- e) Adopted Map Series (Aerial, Future Land Use, Zoning, Gateway Overlay and
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Drywall & Insulation
- Carpentry & Cabinetry
- Windows, Doors & Glass
- General Contractor
- Building & Industrial Supply
- Real Estate Development
- Legal Services
- e) Allowable Uses: Manufacturing; distribution; warehousing; rail, air, and water ports; and
- e) Allowable Uses: Manufacturing; distribution; warehousing; rail, air, and water ports; and
- e. Attorneys’ Fees. In the event of any litigation hereunder, each party shall be
- e. Attorneys’ Fees. In the event of any litigation hereunder, each party shall be
- f) Development Restrictions: Industrial performance standards that pertain to noise, smoke,
- Engineering & Architecture
- Business Consulting
- Site Prep, Grading & Hardscape
- f) Development Restrictions: Industrial performance standards that pertain to noise, smoke,
- Legal Services
- Engineering & Architecture
- f. Assignment. Developer may assign to its affiliate all of its rights under this
- f. Assignment. Developer may assign to its affiliate all of its rights under this
- g. Severability. In the event any provision of this Agreement shall be held invalid or
- g. Severability. In the event any provision of this Agreement shall be held invalid or
- h. Modification. No modification, amendment, or alteration in the terms or conditions
- h. Modification. No modification, amendment, or alteration in the terms or conditions
- i. Governing Law. This Agreement shall be governed by and construed according to
- i. Governing Law. This Agreement shall be governed by and construed according to
- i. No less than 25 feet from any property line at the perimeter of the zoning category
- i. No less than 25 feet from any property line at the perimeter of the zoning category
- i. No less than 25 feet from any property line at the perimeter of the zoning category
- i. No less than 25 feet from any property line at the perimeter of the zoning category
- i. Sale and use of mobile/manufactured homes;
- i. Sale and use of mobile/manufactured homes;
- ii. Flea markets; bazaars, yard sales, or similar sales;
- ii. Flea markets; bazaars, yard sales, or similar sales;
- ii. Industrial uses adjacent to lands designated as Industrial on the Future Land Use Map
- ii. Industrial uses adjacent to lands designated as Industrial on the Future Land Use Map
- ii. Industrial uses adjacent to lands designated as Industrial on the Future Land Use Map
- ii. Industrial uses adjacent to lands designated as Industrial on the Future Land Use Map
- iii. Any business commonly known as "check cashing," or any business which, as a material part of its
- iii. Any business commonly known as "check cashing," or any business which, as a material part of its
- iv. Dating services, escort services, valet services;
- iv. Dating services, escort services, valet services;
- ix. Any business which, as a material part of its services, provides loans secured by vehicle titles
- ix. Any business which, as a material part of its services, provides loans secured by vehicle titles
- j. Entire Agreement. This Agreement constitutes the entire agreement between the
- General Contractor
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Building & Industrial Supply
- j. Entire Agreement. This Agreement constitutes the entire agreement between the
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Business Consulting
- Government Authority
- v. Pawnshops, as defined by F.S. § 539.001(2);
- v. Pawnshops, as defined by F.S. § 539.001(2);
- vi. Bail bond agencies, as defined by F.S. § 648.25(1);
- vi. Bail bond agencies, as defined by F.S. § 648.25(1);
- vii. Palm readers, fortune tellers, tarot card readers, psychics, and similar businesses;
- vii. Palm readers, fortune tellers, tarot card readers, psychics, and similar businesses;
- viii. Bottle clubs;
- viii. Bottle clubs;
- x. Impound yards; automobile wrecking; recycling yards; and similar uses;
- x. Impound yards; automobile wrecking; recycling yards; and similar uses;
- xi. Recreational vehicle (RV) sales, storage, repair (except for projects approved by the city
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Painting & Flooring
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- Government Authority
- xi. Recreational vehicle (RV) sales, storage, repair (except for projects approved by the city
- xii. Stand-alone car wash facilities (excluding the express and conveyorized, automated tunnel car
- xii. Stand-alone car wash facilities (excluding the express and conveyorized, automated tunnel car
- xiii. Mobile home parks;
- xiii. Mobile home parks;
- xiv. Heavy equipment sales, service, and storage;
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Waste Management
- xiv. Heavy equipment sales, service, and storage;
- xix. Manufacturing of chemical products;
- xix. Manufacturing of chemical products;
- xv. Self-service storage facilities;
- xv. Self-service storage facilities;
- xvi. Dispatch office and vehicle fleet parking, storage and maintenance;
- xvi. Dispatch office and vehicle fleet parking, storage and maintenance;
- xvii. Labor pools;
- xvii. Labor pools;
- xviii. Adult entertainment; sexually orientated businesses (section 7-83);
- xviii. Adult entertainment; sexually orientated businesses (section 7-83);
- xx. Contractor storage or salvage yard;
- xx. Contractor storage or salvage yard;
- xxi. Towing service;
- xxi. Towing service;
- xxii. Window tinting;
- xxii. Window tinting;
- xxiii. Gas stations;
- xxiii. Gas stations;
- xxiv. Vape shops;
- xxiv. Vape shops;
- xxv. Pharmacies and dispensaries.
- xxv. Pharmacies and dispensaries.
Follow this across meetings
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, gratis por 7 días. Sin tarjeta de crédito.
Comienza tu prueba gratis