June 8, 2026 Planning Board Meeting Agenda minutes 2026-06-08
Planning Board · 2026-06-08 · minutes
The document is the minutes of the City of Panama City Planning Board meeting held on June 8, 2026. It covers two quasi-judicial requests: a small-scale land use amendment and rezoning for a 0.305-acre parcel at 2015 W 23rd Ct, and a vacation of right-of-way for a 0.13-acre alleyway east of 519 E 6th St. The Board recommended denial for the rezoning and approval for the vacation. No public participation was recorded for either item.
Agenda items
- 1. 4:00 p.m. Chair Neubauer called the Planning Board meeting to order.
- 1. All uses allowable in the GC-1 zoning district.
- 1. Confine ground and building lighting to the property and without causing direct light to protrude
- Lighting & Low-Voltage Systems
- Government Authority
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. Not degrade the established level of services in the Comprehensive Plan or the minimum concurrency
- 1. The impervious surface ratio (ISR) shall be no greater than 0.90 of the total parcel area.
- 1. The requested vacation is consistent with the traffic circulation element of the city comprehensive plan.
- 1. The requested vacation is consistent with the traffic circulation element of the city comprehensive plan.
- 10. Other similar uses.
- 2. In harmony with the general intent of the Comprehensive Plan. (Goals listed as applicable.)
- 2. Screen garbage receptacles, trash containers, and dumpsters from public view, using opaque
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- 2. Shopping centers.
- 2. The floor area ratio (FAR) shall not exceed 3.0.
- 2. The right-of-way does not provide the sole access to any property and if the alternative access is not
- 2. The right-of-way does not provide the sole access to any property and if the alternative access is not limited
- 3. Announcements – Disclosures (as applicable): Board Member Cherry disclosed that she made site visits for
- 3. No maximum height.
- 3. Not exceed traffic limitations, create a fire hazard, or a hazard to the public health, welfare and safety.
- 3. Provide off-street parking as specified in chapter 108.
- 3. The vacation would not jeopardize the current or future location of any utility.
- 3. The vacation would not jeopardize the current or future location of any utility.
- 3. Vehicle dealers and repair shops.
- 4. Big box retailers.
- 4. Compatible with adjacent land uses and districts, and not create a potential nuisance.
- Legal Services
- Engineering & Architecture
- 4. Conform to the landscaping and buffering requirements as specified in chapter 107.
- 4. Minimum setbacks shall be:
- 4. The proposed vacation is not detrimental to the public interest.
- 4. The vacation is not detrimental to the public interest.
- 5. General Commercial Land Use Category
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- 5. Minimum setbacks for development that are adjacent to zoning districts which allow residential
- 5. Not include any residential development.
- Site Prep, Grading & Hardscape
- General Contractor
- Real Estate Development
- Engineering & Architecture
- 5. Printing, publishing or other similar establishments.
- 5. Quasi-judicial Proceedings: Chair Neubauer described the procedures for public hearings as shown on the
- 5. The proposed vacation does not eliminate a public accessway to the water, unless comparable or better
- Legal Services
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- Real Estate Development
- 5. The proposed vacation does not eliminate a public accessway to the water, unless comparable or better
- Site Prep, Grading & Hardscape
- General Contractor
- Utilities (Sub)
- Engineering & Architecture
- Real Estate Development
- Building & Industrial Supply
- 6. Business park.
- 6. Requests:
- General Contractor
- Real Estate Development
- Engineering & Architecture
- Building & Industrial Supply
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Landscaping & Lawn Service
- 7. Non-Action Item(s)
- 7. Wholesaling, warehousing, and indoor storage of goods or materials.
- 8. Public utilities with exception to solid waste facilities and landfills.
- 9. Cannabis dispensing facilities.
- A. The following bulk regulations shall apply to property zoned as GC-2:
- B. The following uses are allowed in GC-2 zoning districts; all other uses are prohibited:
- C. Additional requirements:
- D. Vacations of rights-of-way. Applications to vacate a right-of-way may be approved upon a finding that all
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- S. Burke, City Attorney.
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Painting & Flooring
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- General Contractor
- Real Estate Development
- Engineering & Architecture
- Building & Industrial Supply
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Roofing
- Drywall & Insulation
- Landscaping & Lawn Service
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- General Contractor
- Engineering & Architecture
- Real Estate Development
- Building & Industrial Supply
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Roofing
- Drywall & Insulation
- Windows, Doors & Glass
- i. 15 feet from the front parcel line.
- i. 15 feet from the front parcel line.
- ii. 20 feet from the rear parcel line.
- ii. 25 feet from the rear parcel line.
- iii. 12 feet from the side parcel lines.
- iii. 5 feet from the side parcel lines
Follow this across meetings
Board
Planning BoardApplicants and firms
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, gratis por 7 días. Sin tarjeta de crédito.
Comienza tu prueba gratis