F. SAW CUT CONTROL JOINTS IN CONCRETE SLAB RECOMMENDED AT 12'-0" O.C. MAX PER DETAIL 1
Board of Adjustments Regular Meeting · 2026-04-21 · agenda_item
This item concerns a recommendation for saw cut control joints in concrete slabs, to be placed at a maximum of 12 feet apart. These cuts are to be made where indicated on the foundation plan. The concrete slab will have welded wire mesh placed in the upper third of the slab, with reinforcing details shown on the foundation plan. This item is currently under review. The project would involve site preparation, concrete work, and potentially reinforcing steel installation. Future phases could include framing, mechanical, and finish trades. Local contractors, concrete suppliers, and reinforcing steel providers could find opportunities as this project moves forward. Early engagement is advised before final plans and permits are set.
- spacing
- 12 feet
Industries that could win this work
- Concrete & Masonry
- General Contractor
- Building & Industrial Supply
Follow this across meetings
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.
Crea tu cuenta