Skip to main content

Sé el Primero, Construye Relaciones Duraderas

Board of County Commissioners: julio de 2026

Miami-Dade County

A2Z CONSTRUCTION (D3)

Resolution approving the waiver of plat for A2Z Construction and Remodel LLC, D-25282, located in the Northeast 1/4 of Section 15, Township 53 South, Range 41 East, bounded on the north by NW 69 Terrace, on the east by NW 21 Avenue, on the south approximately 65 feet north of NW 69 Street, and on the west approximately 250 feet east of NW 21 Court. The property is a portion of Block 19 of 'Para Villa Heights' per Plat Book 3, Page 106. Zoning is RU-2. Proposed usage is one duplex on one parcel. The waiver of plat was adopted by the Board of County Commissioners on 7/21/2026. The Miami-Dade County Plat Committee recommended approval. The proposed development is required to connect to public water and public sanitary sewers. Developer's obligation includes drainage, curb & gutter, valley gutter, mobilization, clearing, embankment, maintenance of traffic, and contingency, bonded under bond number SB2026000024 in the amount of $18,453.00. Fiscal impact to the county is approximately $100.00 annually for maintenance of new roadway construction adjacent to the project. Located in Commission District 3, represented by Commissioner Keon Hardemon. Introduced 6/30/2026. Final action 7/21/2026. Agenda item number 5S. File number 261206. Reference R-601-26. Requester: Regulatory and Economic Resources. Staff contact: Lauren E. Alvarez. No public comment sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
Bounded on the north by NW 69 Terrace, on the east by NW 21 Avenue, on the south approximately 65 feet north of NW 69 Street, and on the west approximately 250 feet east of NW 21 Court
Applicant:
A2Z Construction and Remodel LLC

A2Z CONSTRUCTION (D3)

Resolution approving the waiver of plat for A2Z Construction and Remodel LLC, file number 261206, reference R-601-26, adopted on 7/21/2026. The property is located in the Northeast 1/4 of Section 15, Township 53 South, Range 41 East, Miami-Dade County, Florida, bounded on the north by NW 69 Terrace, on the east by NW 21 Avenue, on the south approximately 65 feet north of NW 69 Street, and on the west approximately 250 feet east of NW 21 Court. The project is a single parcel zoned RU-2, with proposed usage of one duplex. The applicant is A2Z Construction and Remodel LLC. The waiver of plat was approved by the Board of County Commissioners on 7/21/2026, with the Plat Committee recommending approval. The fiscal impact to the county is approximately $100.00 annually for maintenance of new roadway construction. The developer is required to connect to public water and public sanitary sewers. The developer's obligation includes drainage, curb & gutter, valley gutter, mobilization, clearing, embankment, maintenance of traffic, and contingency, bonded under bond number SB2026000024 in the amount of $18,453.00.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
Bounded on the north by NW 69 Terrace, on the east by NW 21 Avenue, on the south approximately 65 feet north of NW 69 Street, and on the west approximately 250 feet east of NW 21 Court
Applicant:
A2Z Construction and Remodel LLC

A2Z CONSTRUCTION (D3)

Miami-Dade County Commission approved a waiver of plat for A2Z Construction and Remodel LLC. The project involves the construction of one duplex on a single parcel. The property is located in the Northeast 1/4 of Section 15, Township 53 South, Range 41 East, with boundaries defined by NW 69 Terrace to the north, NW 21 Avenue to the east, approximately 65 feet north of NW 69 Street to the south, and approximately 250 feet east of NW 21 Court to the west. The existing zoning is RU-2. The developer has posted a bond of $18,453.00 for drainage, curb & gutter, valley gutter, mobilization, clearing, embankment, maintenance of traffic, and contingency. The Plat Committee recommended approval. The annual fiscal impact for roadway maintenance is estimated at $100.00.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Approved
Address:
Northeast 1/4 of Section 15, Township 53 South, Range 41 East; portion of Block 19, of 'Para Villa Heights', according to the plat thereof as recorded in Plat Book 3, at Page 106
Applicant:
A2Z CONSTRUCTION AND REMODEL LLC

A2Z CONSTRUCTION (D3)

Resolution approving the waiver of plat for A2Z Construction and Remodel LLC, located in the Northeast 1/4 of Section 15, Township 53 South, Range 41 East. The property is bounded by NW 69 Terrace to the north, NW 21 Avenue to the east, approximately 65 feet north of NW 69 Street to the south, and approximately 250 feet east of NW 21 Court to the west. The proposed usage is one duplex. The Miami-Dade County Plat Committee recommends approval. The developer's obligations for drainage, curb & gutter, and other site work are bonded for $18,453.00. The fiscal impact to the county for roadway maintenance is approximately $100.00 annually.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Approved
Address:
Northeast 1/4 of Section 15, Township 53 South, Range 41 East; portion of Block 19, of 'Para Villa Heights,' according to the plat thereof as recorded in Plat Book 3, at Page 106
Applicant:
A2Z CONSTRUCTION AND REMODEL LLC

A2Z CONSTRUCTION (D3)

Resolution approving the waiver of plat for A2Z Construction and Remodel LLC, D-25282, located in the Northeast 1/4 of Section 15, Township 53 South, Range 41 East, bounded on the north by NW 69 Terrace, on the east by NW 21 Avenue, on the south approximately 65 feet north of NW 69 Street and on the west approximately 250 feet east of NW 21 Court. The property is a portion of Block 19 of 'Para Villa Heights' per Plat Book 3, Page 106. Zoning is RU-2. Proposed usage is one duplex on one parcel. The waiver of plat was adopted on 7/21/2026. The applicant is A2Z Construction and Remodel LLC. The case file number is 261206, reference R-601-26. The Plat Committee recommended approval. The fiscal impact is approximately $100.00 annually for maintenance of new roadway construction. The developer has a bond under bond number SB2026000024 in the amount of $18,453.00 for drainage, curb & gutter, valley gutter, mobilization, clearing, embankment, maintenance of traffic, and contingency. The proposed development is required to connect to public water and public sanitary sewers. No public comment sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
Bounded on the north by NW 69 Terrace, on the east by NW 21 Avenue, on the south approximately 65 feet north of NW 69 Street and on the west approximately 250 feet east of NW 21 Court
Applicant:
A2Z Construction and Remodel LLC

A2Z CONSTRUCTION (D3)

Resolution approving the waiver of plat for A2Z Construction and Remodel LLC, D-25282, located in the Northeast 1/4 of Section 15, Township 53 South, Range 41 East, bounded on the north by NW 69 Terrace, on the east by NW 21 Avenue, on the south approximately 65 feet north of NW 69 Street and on the west approximately 250 feet east of NW 21 Court. The property is a portion of Block 19 of 'Para Villa Heights' per Plat Book 3, Page 106. Zoning is RU-2. Proposed usage is one duplex on one parcel. The waiver of plat was adopted on 7/21/2026. The applicant is A2Z Construction and Remodel LLC. The Miami-Dade County Plat Committee recommended approval. The fiscal impact is approximately $100.00 annually for maintenance of new roadway construction. The developer is obligated for drainage, curb & gutter, valley gutter, mobilization, clearing, embankment, maintenance of traffic, and contingency, bonded under bond number SB2026000024 in the amount of $18,453.00. As a condition of approval, the proposed development is required to connect to public water and public sanitary sewers.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
Bounded on the north by NW 69 Terrace, on the east by NW 21 Avenue, on the south approximately 65 feet north of NW 69 Street and on the west approximately 250 feet east of NW 21 Court
Applicant:
A2Z Construction and Remodel LLC

A2Z CONSTRUCTION (D3)

Resolution approving the waiver of plat for A2Z Construction and Remodel LLC, D-25282, located in the Northeast 1/4 of Section 15, Township 53 South, Range 41 East, bounded on the north by NW 69 Terrace, on the east by NW 21 Avenue, on the south approximately 65 feet north of NW 69 Street and on the west approximately 250 feet east of NW 21 Court. The property is a portion of Block 19 of 'Para Villa Heights' per Plat Book 3, Page 106. Zoning is RU-2. Proposed usage is one duplex on one parcel. The waiver of plat was adopted by the Board of County Commissioners on 7/21/2026. The applicant is A2Z Construction and Remodel LLC. The Miami-Dade County Plat Committee recommended approval. Conditions include connection to public water and public sanitary sewers. Developer's obligation includes drainage, curb & gutter, valley gutter, mobilization, clearing, embankment, maintenance of traffic, and contingency, bonded under bond number SB2026000024 in the amount of $18,453.00. Fiscal impact to the county is approximately $100.00 annually for maintenance of new roadway construction adjacent to the project.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
Bounded on the north by NW 69 Terrace, on the east by NW 21 Avenue, on the south approximately 65 feet north of NW 69 Street and on the west approximately 250 feet east of NW 21 Court
Applicant:
A2Z Construction and Remodel LLC

A2Z CONSTRUCTION (D3)

Miami-Dade County Commission adopted a resolution approving the waiver of plat for A2Z Construction and Remodel LLC. The project involves one duplex on a single parcel, located in the Northeast 1/4 of Section 15, Township 53 South, Range 41 East. The property is bounded by NW 69 Terrace to the north, NW 21 Avenue to the east, approximately 65 feet north of NW 69 Street to the south, and approximately 250 feet east of NW 21 Court to the west. The zoning is RU-2. The developer is obligated for drainage, curb & gutter, valley gutter, mobilization, clearing, embankment, maintenance of traffic, and contingency, bonded under SB2026000024 for $18,453.00. Annual fiscal impact for roadway maintenance is approximately $100.00. The waiver of plat was approved by the Board of County Commissioners.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
Northeast 1/4 of Section 15, Township 53 South, Range 41 East
Applicant:
A2Z CONSTRUCTION AND REMODEL LLC

A2Z CONSTRUCTION (D3)

Miami-Dade County Board of County Commissioners approved a waiver of plat for A2Z Construction and Remodel LLC. The project is located in the Northeast 1/4 of Section 15, Township 53 South, Range 41 East. The proposed usage is one duplex, with one parcel. The developer's obligations include drainage, curb & gutter, valley gutter, mobilization, clearing, embankment, maintenance of traffic, and contingency, bonded for $18,453.00. The project will have an approximate annual fiscal impact of $100.00 for roadway maintenance. The Plat Committee recommended approval.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Approved
Address:
Northeast 1/4 of Section 15, Township 53 South, Range 41 East; portion of Block 19, of 'Para Villa Heights', Plat Book 3, Page 106
Applicant:
A2Z CONSTRUCTION AND REMODEL LLC

A2Z CONSTRUCTION (D3)

Resolution approving the waiver of plat for A2Z Construction and Remodel LLC, D-25282, located in the Northeast 1/4 of Section 15, Township 53 South, Range 41 East, bounded on the north by NW 69 Terrace, on the east by NW 21 Avenue, on the south approximately 65 feet north of NW 69 Street and on the west approximately 250 feet east of NW 21 Court. The property is a portion of Block 19 of 'Para Villa Heights' per Plat Book 3, Page 106. Zoning is RU-2. Proposed usage is one duplex on one parcel. The waiver of plat was adopted on 7/21/2026. The applicant is A2Z Construction and Remodel LLC. The Miami-Dade County Plat Committee recommended approval. Fiscal impact to the county is approximately $100.00 annually for maintenance of new roadway construction. The developer is bonded under bond number SB2026000024 in the amount of $18,453.00 for drainage, curb & gutter, valley gutter, mobilization, clearing, embankment, maintenance of traffic, and contingency. As a condition of approval, the proposed development is required to connect to public water and public sanitary sewers. The item was introduced on 6/30/2026 and adopted on 7/21/2026. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
Bounded on the north by NW 69 Terrace, on the east by NW 21 Avenue, on the south approximately 65 feet north of NW 69 Street and on the west approximately 250 feet east of NW 21 Court
Applicant:
A2Z Construction and Remodel LLC

A2Z CONSTRUCTION (D3)

Resolution approving the waiver of plat for A2Z Construction and Remodel LLC. The project is located in the Northeast 1/4 of Section 15, Township 53 South, Range 41 East, bounded by NW 69 Terrace to the north, NW 21 Avenue to the east, approximately 65 feet north of NW 69 Street to the south, and approximately 250 feet east of NW 21 Court to the west. The proposed development is for one duplex, with zoning RU-2. The waiver of plat was approved by the Board of County Commissioners. Developer obligations include drainage, curb & gutter, valley gutter, mobilization, clearing, embankment, maintenance of traffic, and contingency, bonded under SB2026000024 for $18,453.00. Annual fiscal impact to the county for roadway maintenance is approximately $100.00.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Approved
Address:
Northeast 1/4 of Section 15, Township 53 South, Range 41 East; portion of Block 19, of 'Para Villa Heights', Plat Book 3, Page 106
Applicant:
A2Z CONSTRUCTION AND REMODEL LLC

A2Z CONSTRUCTION (D3)

Resolution approving the waiver of plat for A2Z Construction and Remodel LLC, D-25282, located in the Northeast 1/4 of Section 15, Township 53 South, Range 41 East, bounded on the north by NW 69 Terrace, on the east by NW 21 Avenue, on the south approximately 65 feet north of NW 69 Street and on the west approximately 250 feet east of NW 21 Court. The property is zoned RU-2, proposed usage is one duplex, and the number of parcels is one. The waiver of plat was adopted on 7/21/2026. The applicant is A2Z Construction and Remodel LLC. The fiscal impact to the county is approximately $100.00 annually for maintenance of new roadway construction adjacent to the project. The developer's obligation includes drainage, curb & gutter, valley gutter, mobilization, clearing, embankment, maintenance of traffic, and contingency, bonded under bond number SB2026000024 in the amount of $18,453.00. As a condition of approval, the proposed development is required to connect to public water and public sanitary sewers.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
Bounded on the north by NW 69 Terrace, on the east by NW 21 Avenue, on the south approximately 65 feet north of NW 69 Street and on the west approximately 250 feet east of NW 21 Court
Applicant:
A2Z Construction and Remodel LLC

A2Z CONSTRUCTION (D3)

Miami-Dade County Board of County Commissioners approved a waiver of plat for A2Z Construction and Remodel LLC. The project involves one duplex on a single parcel, located in the Northeast 1/4 of Section 15, Township 53 South, Range 41 East. The property is zoned RU-2. The approval requires connection to public water and sanitary sewers. Developer obligations include drainage, curb & gutter, valley gutter, mobilization, clearing, embankment, maintenance of traffic, and contingency, bonded for $18,453.00. The annual fiscal impact for roadway maintenance is approximately $100.00.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Approved
Address:
Northeast 1/4 of Section 15, Township 53 South, Range 41 East
Applicant:
A2Z CONSTRUCTION AND REMODEL LLC

A2Z CONSTRUCTION (D3)

Miami-Dade County Board of County Commissioners approved a waiver of plat for A2Z Construction and Remodel LLC. The project involves one duplex on a single parcel, located in the Northeast 1/4 of Section 15, Township 53 South, Range 41 East. The property is zoned RU-2. The approval requires connection to public water and sanitary sewers. Developer obligations include drainage, curb & gutter, valley gutter, mobilization, clearing, embankment, maintenance of traffic, and contingency, bonded for $18,453.00. The annual fiscal impact to the county for roadway maintenance is approximately $100.00.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Approved
Address:
Northeast 1/4 of Section 15, Township 53 South, Range 41 East
Applicant:
A2Z CONSTRUCTION AND REMODEL LLC

A2Z CONSTRUCTION (D3)

Miami-Dade County Commission approved a waiver of plat for A2Z Construction and Remodel LLC. The project involves the construction of one duplex on a single parcel. The property is located in the Northeast 1/4 of Section 15, Township 53 South, Range 41 East, bounded by NW 69 Terrace to the north, NW 21 Avenue to the east, approximately 65 feet north of NW 69 Street to the south, and approximately 250 feet east of NW 21 Court to the west. The existing zoning is RU-2. The developer is obligated for drainage, curb & gutter, valley gutter, mobilization, clearing, embankment, maintenance of traffic, and contingency, bonded under number SB2026000024 for $18,453.00. The Plat Committee recommended approval. The estimated annual fiscal impact for roadway maintenance is $100.00. Public comment is not stated.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Approved
Address:
Northeast 1/4 of Section 15, Township 53 South, Range 41 East
Applicant:
A2Z CONSTRUCTION AND REMODEL LLC

A2Z CONSTRUCTION (D3)

Resolution approving the waiver of plat for A2Z Construction and Remodel LLC, D-25282, located in the Northeast 1/4 of Section 15, Township 53 South, Range 41 East, bounded on the north by NW 69 Terrace, on the east by NW 21 Avenue, on the south approximately 65 feet north of NW 69 Street and on the west approximately 250 feet east of NW 21 Court. The property is a portion of Block 19 of 'Para Villa Heights' per Plat Book 3, Page 106. Zoning is RU-2. Proposed usage is one duplex on one parcel. The waiver of plat was adopted by the Board of County Commissioners on 7/21/2026. The applicant is A2Z Construction and Remodel LLC. The Miami-Dade County Plat Committee recommended approval. The fiscal impact to the county is approximately $100.00 annually for maintenance of new roadway construction. The developer's obligation includes drainage, curb & gutter, valley gutter, mobilization, clearing, embankment, maintenance of traffic, and contingency, bonded under bond number SB2026000024 in the amount of $18,453.00. As a condition of approval, the proposed development is required to connect to public water and public sanitary sewers.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
Bounded on the north by NW 69 Terrace, on the east by NW 21 Avenue, on the south approximately 65 feet north of NW 69 Street and on the west approximately 250 feet east of NW 21 Court
Applicant:
A2Z Construction and Remodel LLC

A2Z CONSTRUCTION (D3)

Miami-Dade County Board of County Commissioners approved a waiver of plat for A2Z Construction and Remodel LLC. The project involves one duplex on a single parcel, located in the Northeast 1/4 of Section 15, Township 53 South, Range 41 East. The property is zoned RU-2. The approval requires connection to public water and sanitary sewers. Developer obligations for drainage, curb & gutter, and other site work are bonded for $18,453.00. The annual fiscal impact to the county for roadway maintenance is approximately $100.00.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Approved
Address:
Northeast 1/4 of Section 15, Township 53 South, Range 41 East
Applicant:
A2Z CONSTRUCTION AND REMODEL LLC

A2Z CONSTRUCTION (D3)

Miami-Dade County Board of County Commissioners approved a waiver of plat for A2Z Construction and Remodel LLC. The project involves one duplex on a single parcel, located in the Northeast 1/4 of Section 15, Township 53 South, Range 41 East. The property is zoned RU-2. The approval requires connection to public water and sanitary sewers. Developer obligations for drainage, curb & gutter, and other site work are bonded for $18,453.00. The estimated annual fiscal impact for roadway maintenance is $100.00.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Approved
Address:
Northeast 1/4 of Section 15, Township 53 South, Range 41 East
Applicant:
A2Z CONSTRUCTION AND REMODEL LLC

A2Z CONSTRUCTION (D3)

Resolution approving the waiver of plat for A2Z Construction and Remodel LLC, D-25282, located in the Northeast 1/4 of Section 15, Township 53 South, Range 41 East, bounded on the north by NW 69 Terrace, on the east by NW 21 Avenue, on the south approximately 65 feet north of NW 69 Street and on the west approximately 250 feet east of NW 21 Court. The property is a portion of Block 19 of 'Para Villa Heights' per Plat Book 3, Page 106. Zoning is RU-2. Proposed usage is one duplex on one parcel. The waiver of plat was adopted by the Board of County Commissioners on 7/21/2026. The applicant is A2Z Construction and Remodel LLC. The Miami-Dade County Plat Committee recommended approval. The fiscal impact to the county is approximately $100.00 annually for maintenance of new roadway construction adjacent to the project. The developer's obligation includes drainage, curb & gutter, valley gutter, mobilization, clearing, embankment, maintenance of traffic, and contingency, bonded under bond number SB2026000024 in the amount of $18,453.00. As a condition of approval, the proposed development is required to connect to public water and public sanitary sewers.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
Bounded on the north by NW 69 Terrace, on the east by NW 21 Avenue, on the south approximately 65 feet north of NW 69 Street and on the west approximately 250 feet east of NW 21 Court
Applicant:
A2Z Construction and Remodel LLC

A2Z CONSTRUCTION (D3)

Resolution approving the waiver of plat for A2Z Construction and Remodel LLC, D-25282, located in the Northeast 1/4 of Section 15, Township 53 South, Range 41 East, bounded on the north by NW 69 Terrace, on the east by NW 21 Avenue, on the south approximately 65 feet north of NW 69 Street and on the west approximately 250 feet east of NW 21 Court. The property is a portion of Block 19 of 'Para Villa Heights' per Plat Book 3, Page 106. Zoning is RU-2. Proposed usage is one duplex. Number of parcels: one. The waiver of plat was adopted by the Board of County Commissioners on 7/21/2026. The Plat Committee recommended approval. The fiscal impact to the county is approximately $100.00 annually for maintenance of new roadway construction. The developer is required to connect to public water and public sanitary sewers. Developer's obligation includes drainage, curb & gutter, valley gutter, mobilization, clearing, embankment, maintenance of traffic, and contingency, bonded under bond number SB2026000024 in the amount of $18,453.00. No public comment or stakeholder sentiment is stated.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
Bounded on the north by NW 69 Terrace, on the east by NW 21 Avenue, on the south approximately 65 feet north of NW 69 Street and on the west approximately 250 feet east of NW 21 Court
Applicant:
A2Z Construction and Remodel LLC

A2Z CONSTRUCTION (D3)

Miami-Dade County Board of County Commissioners approved a waiver of plat for A2Z Construction and Remodel LLC. The project involves one duplex on a single parcel. The property is located in the Northeast 1/4 of Section 15, Township 53 South, Range 41 East, bounded by NW 69 Terrace to the north, NW 21 Avenue to the east, NW 69 Street to the south, and NW 21 Court to the west. The developer is responsible for drainage, curb & gutter, valley gutter, mobilization, clearing, embankment, maintenance of traffic, and contingency, bonded under SB2026000024 for $18,453.00. Annual maintenance costs for adjacent roadway construction are estimated at $100.00. Public comment is not stated.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Approved
Address:
Northeast 1/4 of Section 15, Township 53 South, Range 41 East; Portion of Block 19, of 'Para Villa Heights', Plat Book 3, Page 106
Applicant:
A2Z CONSTRUCTION AND REMODEL LLC

A2Z CONSTRUCTION (D3)

Resolution approving the waiver of plat for A2Z Construction and Remodel LLC, D-25282, located in the Northeast 1/4 of Section 15, Township 53 South, Range 41 East, bounded on the north by NW 69 Terrace, on the east by NW 21 Avenue, on the south approximately 65 feet north of NW 69 Street and on the west approximately 250 feet east of NW 21 Court. The property is a portion of Block 19 of 'Para Villa Heights' per Plat Book 3, Page 106. Zoning is RU-2. Proposed usage is one duplex on one parcel. The waiver of plat was adopted on 7/21/2026. The applicant is A2Z Construction and Remodel LLC. The case file number is 261206, reference R-601-26. The plat committee recommended approval. Fiscal impact to the county is approximately $100.00 annually for maintenance of new roadway construction. The developer's obligation includes drainage, curb & gutter, valley gutter, mobilization, clearing, embankment, maintenance of traffic, and contingency, bonded under bond number SB2026000024 in the amount of $18,453.00. A condition of approval requires connection to public water and public sanitary sewers.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
Bounded on the north by NW 69 Terrace, on the east by NW 21 Avenue, on the south approximately 65 feet north of NW 69 Street and on the west approximately 250 feet east of NW 21 Court
Applicant:
A2Z Construction and Remodel LLC

A2Z CONSTRUCTION (D3)

Resolution approving the waiver of plat for A2Z Construction and Remodel LLC, D-25282, located in the Northeast 1/4 of Section 15, Township 53 South, Range 41 East, bounded on the north by NW 69 Terrace, on the east by NW 21 Avenue, on the south approximately 65 feet north of NW 69 Street and on the west approximately 250 feet east of NW 21 Court. The property is a portion of Block 19 of 'Para Villa Heights' per Plat Book 3, Page 106. Zoning is RU-2. Proposed usage is one duplex on one parcel. The waiver of plat was adopted on 7/21/2026. The applicant is A2Z Construction and Remodel LLC. The Miami-Dade County Plat Committee recommended approval. The fiscal impact to the county is approximately $100.00 annually for maintenance of new roadway construction. The developer is bonded under bond number SB2026000024 in the amount of $18,453.00 for drainage, curb & gutter, valley gutter, mobilization, clearing, embankment, maintenance of traffic, and contingency. As a condition of approval, the proposed development is required to connect to public water and public sanitary sewers.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
Bounded on the north by NW 69 Terrace, on the east by NW 21 Avenue, on the south approximately 65 feet north of NW 69 Street and on the west approximately 250 feet east of NW 21 Court
Applicant:
A2Z Construction and Remodel LLC

A2Z CONSTRUCTION (D3)

Resolution approving the waiver of plat for A2Z Construction and Remodel LLC, D-25282, located in the Northeast 1/4 of Section 15, Township 53 South, Range 41 East, bounded on the north by NW 69 Terrace, on the east by NW 21 Avenue, on the south approximately 65 feet north of NW 69 Street and on the west approximately 250 feet east of NW 21 Court. The property is a portion of Block 19 of 'Para Villa Heights' per Plat Book 3, Page 106. Zoning is RU-2. Proposed usage is one duplex. Number of parcels: one. The waiver of plat was adopted by the Board of County Commissioners on 7/21/2026. The Plat Committee recommended approval. Fiscal impact to the county is approximately $100.00 annually for maintenance of new roadway construction. Developer's obligation includes drainage, curb & gutter, valley gutter, mobilization, clearing, embankment, maintenance of traffic, and contingency, bonded under bond number SB2026000024 in the amount of $18,453.00. As a condition of approval, the proposed development is required to connect to public water and public sanitary sewers.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
Bounded on the north by NW 69 Terrace, on the east by NW 21 Avenue, on the south approximately 65 feet north of NW 69 Street and on the west approximately 250 feet east of NW 21 Court
Applicant:
A2Z Construction and Remodel LLC

A2Z CONSTRUCTION (D3)

Miami-Dade County Board of County Commissioners approved a waiver of plat for A2Z Construction and Remodel LLC. The project involves one duplex on a single parcel, located in the Northeast 1/4 of Section 15, Township 53 South, Range 41 East. The property is zoned RU-2. The approval requires connection to public water and sanitary sewers. Developer obligations for drainage, curb & gutter, and other site work are bonded for $18,453.00. The annual fiscal impact for roadway maintenance is approximately $100.00.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Approved
Address:
Northeast 1/4 of Section 15, Township 53 South, Range 41 East
Applicant:
A2Z CONSTRUCTION AND REMODEL LLC

A2Z CONSTRUCTION (D3)

Resolution approving the waiver of plat for A2Z Construction and Remodel LLC, located in the Northeast 1/4 of Section 15, Township 53 South, Range 41 East, bounded on the north by NW 69 Terrace, on the east by NW 21 Avenue, on the south approximately 65 feet north of NW 69 Street and on the west approximately 250 feet east of NW 21 Court. The property is a portion of Block 19 of 'Para Villa Heights' per Plat Book 3, Page 106. The proposed usage is one duplex on one parcel, zoned RU-2. The waiver of plat was adopted by the Board of County Commissioners on 7/21/2026. The applicant is A2Z Construction and Remodel LLC. The case file number is 261206, reference R-601-26. The developer's obligation includes drainage, curb & gutter, valley gutter, mobilization, clearing, embankment, maintenance of traffic, and contingency, bonded under bond number SB2026000024 in the amount of $18,453.00. Fiscal impact to the county is approximately $100.00 annually for maintenance of new roadway construction. As a condition of approval, the proposed development is required to connect to public water and public sanitary sewers.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
Bounded on the north by NW 69 Terrace, on the east by NW 21 Avenue, on the south approximately 65 feet north of NW 69 Street and on the west approximately 250 feet east of NW 21 Court
Applicant:
A2Z Construction and Remodel LLC

A2Z CONSTRUCTION (D3)

Resolution approving the waiver of plat for A2Z Construction and Remodel LLC. The project is located in the Northeast 1/4 of Section 15, Township 53 South, Range 41 East, bounded by NW 69 Terrace to the north, NW 21 Avenue to the east, approximately 65 feet north of NW 69 Street to the south, and approximately 250 feet east of NW 21 Court to the west. The proposed usage is one duplex on one parcel, with existing zoning of RU-2. The waiver of plat was approved, with conditions including connection to public water and sanitary sewers. Developer obligations for drainage, curb & gutter, and other site work are bonded for $18,453.00. The estimated annual fiscal impact to the county for roadway maintenance is $100.00.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Approved
Address:
Northeast 1/4 of Section 15, Township 53 South, Range 41 East; portion of Block 19, of 'Para Villa Heights', according to the plat thereof as recorded in Plat Book 3, at Page 106
Applicant:
A2Z CONSTRUCTION AND REMODEL LLC

A2Z CONSTRUCTION (D3)

The Board of County Commissioners adopted Resolution R-601-26 approving the waiver of plat for A2Z Construction and Remodel LLC, file number 261206, for a property located in the Northeast 1/4 of Section 15, Township 53 South, Range 41 East, bounded on the north by NW 69 Terrace, on the east by NW 21 Avenue, on the south approximately 65 feet north of NW 69 Street, and on the west approximately 250 feet east of NW 21 Court. The property is zoned RU-2, and the proposed usage is one duplex on one parcel. The waiver of plat was approved on July 21, 2026. The applicant is A2Z Construction and Remodel LLC. The fiscal impact to the county is approximately $100.00 annually for maintenance of new roadway construction adjacent to the project. The developer's obligation includes drainage, curb & gutter, valley gutter, mobilization, clearing, embankment, maintenance of traffic, and contingency, bonded under bond number SB2026000024 in the amount of $18,453.00. As a condition of approval, the proposed development is required to connect to public water and public sanitary sewers. The Miami-Dade County Plat Committee recommends approval. The item is located in Commission District 3, represented by Commissioner Keon Hardemon. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
Bounded on the north by NW 69 Terrace, on the east by NW 21 Avenue, on the south approximately 65 feet north of NW 69 Street, and on the west approximately 250 feet east of NW 21 Court
Applicant:
A2Z Construction and Remodel LLC

A2Z CONSTRUCTION (D3)

Miami-Dade County Board of County Commissioners approved a waiver of plat for A2Z Construction and Remodel LLC. The project involves one duplex on a single parcel located in the Northeast 1/4 of Section 15, Township 53 South, Range 41 East. The property is bounded by NW 69 Terrace to the north, NW 21 Avenue to the east, approximately 65 feet north of NW 69 Street to the south, and approximately 250 feet east of NW 21 Court to the west. The existing zoning is RU-2. The developer is obligated for drainage, curb & gutter, valley gutter, mobilization, clearing, embankment, maintenance of traffic, and contingency, bonded under SB2026000024 for $18,453.00. The project is required to connect to public water and sanitary sewers. The Plat Committee recommended approval. There was no public comment stated.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Approved
Address:
Northeast 1/4 of Section 15, Township 53 South, Range 41 East; Portion of Block 19, of 'Para Villa Heights', according to the plat thereof as recorded in Plat Book 3, at Page 106
Applicant:
A2Z CONSTRUCTION AND REMODEL LLC

A2Z CONSTRUCTION (D3)

Resolution approving the waiver of plat for A2Z Construction and Remodel LLC, D-25282, located in the Northeast 1/4 of Section 15, Township 53 South, Range 41 East, bounded on the north by NW 69 Terrace, on the east by NW 21 Avenue, on the south approximately 65 feet north of NW 69 Street, and on the west approximately 250 feet east of NW 21 Court. The property is a portion of Block 19 of 'Para Villa Heights' per Plat Book 3, Page 106. Zoning is RU-2. Proposed usage is one duplex on one parcel. The waiver of plat was adopted on 7/21/2026. The applicant is A2Z Construction and Remodel LLC. The Miami-Dade County Plat Committee recommended approval. The fiscal impact to the county is approximately $100.00 annually for maintenance of new roadway construction. The developer is bonded under bond number SB2026000024 in the amount of $18,453.00 for drainage, curb & gutter, valley gutter, mobilization, clearing, embankment, maintenance of traffic, and contingency. As a condition of approval, the proposed development is required to connect to public water and public sanitary sewers. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
Bounded on the north by NW 69 Terrace, on the east by NW 21 Avenue, on the south approximately 65 feet north of NW 69 Street, and on the west approximately 250 feet east of NW 21 Court
Applicant:
A2Z Construction and Remodel LLC

A2Z CONSTRUCTION (D3)

Miami-Dade County Board of County Commissioners approved a waiver of plat for A2Z Construction and Remodel LLC. The project involves one duplex on a single parcel, located in the Northeast 1/4 of Section 15, Township 53 South, Range 41 East. The property is zoned RU-2. The approval requires connection to public water and sanitary sewers. Developer obligations for drainage, curb & gutter, and other site work are bonded for $18,453.00. The annual fiscal impact to the county for roadway maintenance is approximately $100.00.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Approved
Address:
Northeast 1/4 of Section 15, Township 53 South, Range 41 East
Applicant:
A2Z CONSTRUCTION AND REMODEL LLC

A2Z CONSTRUCTION (D3)

Resolution approving the waiver of plat for A2Z Construction and Remodel LLC, D-25282, located in the Northeast 1/4 of Section 15, Township 53 South, Range 41 East, bounded on the north by NW 69 Terrace, on the east by NW 21 Avenue, on the south approximately 65 feet north of NW 69 Street and on the west approximately 250 feet east of NW 21 Court. The property is a portion of Block 19 of 'Para Villa Heights' per Plat Book 3, Page 106. Zoning is RU-2. Proposed usage is one duplex on one parcel. The waiver of plat was approved by the Board of County Commissioners on 7/21/2026. The applicant is A2Z Construction and Remodel LLC. The fiscal impact to the county is approximately $100.00 annually for maintenance of new roadway construction. The developer's obligation includes drainage, curb & gutter, valley gutter, mobilization, clearing, embankment, maintenance of traffic, and contingency, bonded under bond number SB2026000024 in the amount of $18,453.00. As a condition of approval, the proposed development is required to connect to public water and public sanitary sewers.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
Bounded on the north by NW 69 Terrace, on the east by NW 21 Avenue, on the south approximately 65 feet north of NW 69 Street and on the west approximately 250 feet east of NW 21 Court
Applicant:
A2Z Construction and Remodel LLC

A2Z CONSTRUCTION (D3)

Resolution approving the waiver of plat for A2Z Construction and Remodel LLC. The project is located in the Northeast 1/4 of Section 15, Township 53 South, Range 41 East, bounded by NW 69 Terrace to the north, NW 21 Avenue to the east, approximately 65 feet north of NW 69 Street to the south, and approximately 250 feet east of NW 21 Court to the west. The proposed usage is one duplex, with one parcel. The waiver of plat was approved by the Board of County Commissioners. The developer's obligations, including drainage, curb & gutter, and mobilization, are bonded under SB2026000024 for $18,453.00. The fiscal impact to the county for roadway maintenance is approximately $100.00 annually.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Approved
Address:
Northeast 1/4 of Section 15, Township 53 South, Range 41 East; Portion of Block 19, of 'Para Villa Heights', Plat Book 3, Page 106
Applicant:
A2Z CONSTRUCTION AND REMODEL LLC

AECOM - OWNERS REP.

Miami-Dade County Board of County Commissioners adopted a resolution waiving competitive bidding to approve an agreement with AECOM Technical Services, Inc. for Limited Owner’s Representative Advisory Services for the New Integrated Command and Communications Center (IC3) at the Lightspeed Facility. The agreement is for $2,024,106.00 and aims to ensure continuity of specialized advisory services during the construction phase, leveraging AECOM's prior role in developing the project's Design Criteria Guidelines. This waiver of competitive bidding is justified by the need for experienced, project-specific insight to support quality assurance, reduce risk, and promote efficient decision-making during active construction, especially given the advanced stage and complexity of the IC3 project. The IC3 is a mission-critical public safety investment consolidating emergency response coordination and continuity of government functions.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
11500 NW 25 Street, Sweetwater, Florida
Applicant:
AECOM Technical Services, Inc.

AECOM - OWNERS REP.

Miami-Dade County Board of County Commissioners adopted a resolution waiving competitive bidding to approve an agreement with AECOM Technical Services, Inc. for Limited Owner’s Representative Advisory Services for the New Integrated Command and Communications Center (IC3) at the Lightspeed Facility. The agreement is for $2,024,106.00 and aims to provide continuity of specialized advisory services during the construction phase, leveraging AECOM's prior role in developing the project's Design Criteria Guidelines. This decision supports quality assurance, risk reduction, and efficient decision-making for this mission-critical public safety investment. No public comment was stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
11500 NW 25 Street, Sweetwater, Florida
Applicant:
AECOM Technical Services, Inc.

AECOM - OWNERS REP.

Miami-Dade County Board of County Commissioners adopted Resolution R-617-26 (Legislative Item File Number 261118) on July 21, 2026, waiving competitive bidding and authorizing the County Mayor to execute an agreement with AECOM Technical Services, Inc. for limited Owner's Representative advisory services in the amount of $2,024,106.00 for the New Integrated Command and Communications Center (IC3) at the Lightspeed Facility, located at 11500 NW 25 Street, Sweetwater, Florida, Project No. DB20-ISD-01, Contract No. I190038. The agreement is for construction-phase advisory and observational support, including field observation and review of work products for consistency with the Design Criteria Guidelines. The scope does not include architectural or engineering professional services. The project is in Commission District 12, represented by Commissioner Juan Carlos Bermudez, but the scope is countywide. Funding is from future financing proceeds, Program 2000001658. The resolution was introduced on June 18, 2026, and forwarded to the Board with a favorable recommendation by the Intergovernmental and Economic Impact Committee on July 15, 2026. The final action was adoption on July 21, 2026. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
11500 NW 25 Street, Sweetwater, Florida
Applicant:
AECOM Technical Services, Inc.

AECOM - OWNERS REP.

Miami-Dade County Board of County Commissioners adopted Resolution R-617-26 (Legislative Item File Number 261118) on July 21, 2026, waiving competitive bidding and authorizing the County Mayor to execute an agreement with AECOM Technical Services, Inc. for limited Owner's Representative advisory services in the amount of $2,024,106.00 for the New Integrated Command and Communications Center (IC3) at the Lightspeed Facility, located at 11500 NW 25 Street, Sweetwater, Florida, Project No. DB20-ISD-01, Contract No. I190038. The agreement covers construction-phase advisory and observational support, including field observation and review of work products for consistency with the Design Criteria Guidelines; it does not include architectural or engineering professional services. The project is in Commission District 12, represented by Commissioner Juan Carlos Bermudez, but the scope is countywide. Funding is from future financing proceeds, Program 2000001658. The Intergovernmental and Economic Impact Committee forwarded the item to the BCC with a favorable recommendation on July 15, 2026, and the BCC adopted it on July 21, 2026. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
11500 NW 25 Street, Sweetwater, Florida
Applicant:
AECOM Technical Services, Inc.

AECOM - OWNERS REP.

Miami-Dade County Board of County Commissioners adopted a resolution waiving competitive bidding to approve an agreement with AECOM Technical Services, Inc. for Limited Owner’s Representative Advisory Services for the New Integrated Command and Communications Center (IC3) at the Lightspeed Facility. The agreement is for $2,024,106.00 and aims to ensure continuity of oversight during the construction phase, leveraging AECOM's prior role in developing the project's Design Criteria Guidelines. The IC3 is a mission-critical public safety investment consolidating emergency response coordination and continuity of government functions.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
11500 NW 25 Street, Sweetwater, Florida
Applicant:
AECOM Technical Services, Inc.

AECOM - OWNERS REP.

Miami-Dade County Board of County Commissioners adopted Resolution R-617-26 (Legislative Item File Number 261118) on 7/21/2026, waiving competitive bidding and authorizing the County Mayor to execute an agreement with AECOM Technical Services, Inc. for limited Owner's Representative advisory services in the amount of $2,024,106.00 for the New Integrated Command and Communications Center (IC3) at the Lightspeed Facility, located at 11500 NW 25 Street, Sweetwater, Florida, Project No. DB20-ISD-01, Contract No. I190038. The resolution was forwarded to the Board with a favorable recommendation by the Intergovernmental and Economic Impact Committee on 7/15/2026 and 7/20/2026. The agreement is for construction-phase advisory and observational support, not including architectural or engineering professional services. The project is in Commission District 12, but the scope is countywide. Funding is from future financing proceeds, Program 2000001658. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
11500 NW 25 Street, Sweetwater, Florida
Applicant:
AECOM Technical Services, Inc.

AECOM - OWNERS REP.

Miami-Dade County Board of County Commissioners adopted a resolution waiving competitive bidding to approve an agreement with AECOM Technical Services, Inc. for Limited Owner’s Representative Advisory Services for the New Integrated Command and Communications Center (IC3) at the Lightspeed Facility. The agreement is for $2,024,106.00 and aims to provide continuity of specialized advisory services during the construction phase, leveraging AECOM's prior role in developing the project's Design Criteria Guidelines. This waiver is justified by the need for experienced, project-specific insight to ensure quality assurance, reduce risk, and promote efficient decision-making during active construction, especially given the project's advanced stage and complexity. The IC3 is a mission-critical public safety investment consolidating emergency response coordination and continuity of government functions.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
11500 NW 25 Street, Sweetwater, Florida
Applicant:
AECOM Technical Services, Inc.

AECOM - OWNERS REP.

Miami-Dade County Board of County Commissioners approved waiving competitive bidding to authorize an agreement with AECOM Technical Services, Inc. for Limited Owner's Representative Advisory Services for the New Integrated Command and Communications Center (IC3) at the Lightspeed Facility. The agreement is for $2,024,106.00 and aims to ensure continuity of specialized advisory services during the construction phase, leveraging AECOM's prior role in developing the project's Design Criteria Guidelines. The IC3 is a mission-critical public safety investment consolidating emergency response coordination and continuity of government functions. The decision was forwarded with a favorable recommendation from the Intergovernmental and Economic Impact Committee.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Approved
Address:
11500 NW 25 Street, Sweetwater, Florida
Applicant:
AECOM Technical Services, Inc.

AECOM - OWNERS REP.

The Miami-Dade County Board of County Commissioners adopted Resolution R-617-26, waiving competitive bidding and authorizing an agreement with AECOM Technical Services, Inc. for limited Owner's Representative advisory services in the amount of $2,024,106.00 for the New Integrated Command and Communications Center (IC3) at the Lightspeed Facility, located at 11500 NW 25 Street, Sweetwater, Florida. The project number is DB20-ISD-01 and the contract number is I190038. The resolution was introduced on 6/18/2026 and adopted on 7/21/2026. The agreement is for construction-phase advisory and observational support, not including architectural or engineering professional services. The project is in Commission District 12, represented by Commissioner Juan Carlos Bermudez, but the scope is countywide. The fiscal impact is funded with future financing proceeds, Program 2000001658. Eddy Etienne, PIOD Program Management Manager, will monitor the project. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
11500 NW 25 Street, Sweetwater, Florida
Applicant:
AECOM Technical Services, Inc.

AECOM - OWNERS REP.

Miami-Dade County Board of County Commissioners adopted Resolution R-617-26 (File Number 261118) on July 21, 2026, waiving competitive bidding and authorizing an agreement with AECOM Technical Services, Inc. for limited Owner's Representative advisory services in the amount of $2,024,106.00 for the New Integrated Command and Communications Center (IC3) at the Lightspeed Facility, located at 11500 NW 25 Street, Sweetwater, Florida, Project No. DB20-ISD-01, Contract No. I190038. The services are construction-phase advisory and observational support, not including architectural or engineering professional services. The project is in Commission District 12, represented by Commissioner Juan Carlos Bermudez, but the scope is countywide. The agreement is funded with future financing proceeds, Program 2000001658. The Intergovernmental and Economic Impact Committee forwarded the item to the BCC with a favorable recommendation on July 15, 2026. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
11500 NW 25 Street, Sweetwater, Florida
Applicant:
AECOM Technical Services, Inc.

AECOM - OWNERS REP.

Miami-Dade County Board of County Commissioners adopted a resolution waiving competitive bidding to approve an agreement with AECOM Technical Services, Inc. for Limited Owner’s Representative Advisory Services for the New Integrated Command and Communications Center (IC3) at the Lightspeed Facility. The agreement is for $2,024,106.00 and aims to ensure continuity of specialized advisory services during the construction phase, leveraging AECOM's prior role in developing the project's Design Criteria Guidelines. This waiver of competitive bidding was approved by a two-thirds vote. The IC3 project is a mission-critical public safety investment intended to serve as a centralized hub for emergency response coordination and continuity of government.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
11500 NW 25 Street, Sweetwater, Florida
Applicant:
AECOM Technical Services, Inc.

AECOM - OWNERS REP.

The document is a legislative item for the Miami-Dade Board of County Commissioners, File Number 261118, Resolution R-617-26, which was Adopted on 7/21/2026. It approves a resolution waiving competitive bidding and authorizing an agreement for Limited Owner's Representative Advisory Services with AECOM Technical Services, Inc. for the New Integrated Command and Communications Center (IC3) at the Lightspeed Facility. The project is located at 11500 NW 25 Street, Sweetwater, Florida. The total value of the agreement is $2,024,106.00. The project is in Commission District 12, represented by Commissioner Juan Carlos Bermudez. The scope of services includes construction-phase advisory and observational support, field observation, and review of work products for consistency with the Design Criteria Guidelines. The scope does not include architectural or engineering professional services. The fiscal impact is $2,024,106, funded with future financing proceeds, Program 2000001658 – Integrated Command and Communications Center. The item was introduced on 6/18/2026, and the final action was on 7/21/2026. The document does not state the project size in acreage, square footage, or number of units. The document does not state a zoning or use change. The applicant/developer/owner name is not explicitly stated, but the agreement is with AECOM Technical Services, Inc. The document does not state any public comment or stakeholder sentiment.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
11500 NW 25 Street, Sweetwater, Florida
Applicant:
AECOM Technical Services, Inc.

AECOM - OWNERS REP.

Miami-Dade County Board of County Commissioners approved waiving competitive bidding to authorize an agreement with AECOM Technical Services, Inc. for Limited Owner's Representative Advisory Services for the New Integrated Command and Communications Center (IC3) at the Lightspeed Facility. The agreement is for $2,024,106.00 and aims to provide specialized advisory services during the construction phase, ensuring consistency with design criteria and operational objectives. AECOM previously served as the Design Criteria Professional for the project. The IC3 project is a mission-critical public safety investment consolidating emergency response coordination and continuity of government functions.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Approved
Address:
11500 NW 25 Street, Sweetwater, Florida
Applicant:
AECOM Technical Services, Inc.

AECOM - OWNERS REP.

Miami-Dade County Board of County Commissioners adopted Resolution R-617-26 (Legislative Item File Number 261118) on July 21, 2026, waiving competitive bidding and authorizing the County Mayor to execute an agreement with AECOM Technical Services, Inc. for limited Owner's Representative advisory services in the amount of $2,024,106.00 for the New Integrated Command and Communications Center (IC3) at the Lightspeed Facility, located at 11500 NW 25 Street, Sweetwater, Florida, Project No. DB20-ISD-01, Contract No. I190038. The services are for construction-phase advisory and observational support, not architectural or engineering professional services. The project is in Commission District 12, represented by Commissioner Juan Carlos Bermudez, but the scope is countywide. The agreement is funded with future financing proceeds, Program 2000001658. The Intergovernmental and Economic Impact Committee forwarded the item to the BCC with a favorable recommendation on July 15, 2026, and the BCC adopted it on July 21, 2026. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
11500 NW 25 Street, Sweetwater, Florida
Applicant:
AECOM Technical Services, Inc.

AECOM - OWNERS REP.

Miami-Dade County Board of County Commissioners adopted Resolution R-617-26 (Legislative Item File Number 261118) on July 21, 2026, waiving competitive bidding and authorizing the County Mayor to execute an agreement with AECOM Technical Services, Inc. for limited Owner's Representative advisory services in the amount of $2,024,106.00 for the New Integrated Command and Communications Center (IC3) at the Lightspeed Facility, located at 11500 NW 25 Street, Sweetwater, Florida, Project No. DB20-ISD-01, Contract No. I190038. The resolution was introduced on June 18, 2026, and forwarded to the Board with a favorable recommendation by the Intergovernmental and Economic Impact Committee on July 15, 2026. The agreement covers construction-phase advisory and observational support, including field observation and review of work products for consistency with the Design Criteria Guidelines, but does not include architectural or engineering professional services. AECOM previously served as the Design Criteria Professional for the project since 2022 under Contract No. EDP-ID-190038 and EDP-ID-190038-R1. The project is in Commission District 12, represented by Commissioner Juan Carlos Bermudez, but the scope is countywide. The fiscal impact is funded with future financing proceeds, Program 2000001658. Eddy Etienne, PIOD Program Management Manager, will monitor the project. No Small Business Enterprise-Services (SBE-S) measure is applicable. Public comment or stakeholder sentiment is not stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
11500 NW 25 Street, Sweetwater, Florida
Applicant:
AECOM Technical Services, Inc.

AECOM - OWNERS REP.

Miami-Dade County Board of County Commissioners adopted Resolution R-617-26 (Legislative Item File Number 261118) on July 21, 2026, waiving competitive bidding and authorizing an agreement with AECOM Technical Services, Inc. for limited Owner's Representative advisory services in the amount of $2,024,106.00 for the New Integrated Command and Communications Center (IC3) at the Lightspeed Facility, located at 11500 NW 25 Street, Sweetwater, Florida, Project No. DB20-ISD-01, Contract No. I190038. The resolution was introduced on June 18, 2026, and forwarded to the Board with a favorable recommendation by the Intergovernmental and Economic Impact Committee on July 15, 2026. The agreement is for construction-phase advisory and observational support, not including architectural or engineering professional services. The project is in Commission District 12, but the scope is countywide. Funding is from future financing proceeds, Program 2000001658. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
11500 NW 25 Street, Sweetwater, Florida
Applicant:
AECOM Technical Services, Inc.

AECOM - OWNERS REP.

Miami-Dade County Board of County Commissioners adopted Resolution R-617-26 (Legislative Item File Number 261118) on July 21, 2026, waiving competitive bidding and authorizing the County Mayor to execute an agreement with AECOM Technical Services, Inc. for limited Owner's Representative advisory services in the amount of $2,024,106.00 for the New Integrated Command and Communications Center (IC3) at the Lightspeed Facility, located at 11500 NW 25 Street, Sweetwater, Florida, Project No. DB20-ISD-01, Contract No. I190038. The agreement covers construction-phase advisory and observational support, not architectural or engineering services. The project is in Commission District 12, represented by Commissioner Juan Carlos Bermudez, but the scope is countywide. Funding is from future financing proceeds, Program 2000001658. The Intergovernmental and Economic Impact Committee forwarded the item to the Board with a favorable recommendation on July 15, 2026. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
11500 NW 25 Street, Sweetwater, Florida
Applicant:
AECOM Technical Services, Inc.

Mira los negocios reales detrás de estos números

Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.

Crea tu cuenta