Skip to main content

Sé el Primero, Construye Relaciones Duraderas

Browse Miami-Dade County civic records

Every published record for Miami-Dade County, newest first. Filter by board, year, or industry to jump straight to the records you want, and page through to reach the full archive.

31,048 records

CEI SERVICES FOR THE DADELAND SOUTH INTERMODAL STATION

Resolution authorizing Supplemental Agreement No. 1 between BCC Engineering, LLC and Miami-Dade County for Construction, Engineering, and Inspection (CEI) services for the Dadeland South Intermodal Station project, increasing the contract amount from $3,551,593.10 to $5,467,817.92. The project is located at the Dadeland South Metrorail Station, 9150 Dadeland Boulevard, Miami, Florida 33156. The supplemental agreement is needed due to a 264-day extension and additional scope to the design-build contract, including bus charging infrastructure, reconfiguration of the BRT platform, escalator replacements, and modifications to station access and circulation elements. The design-build project is valued at approximately $77 million. The resolution was adopted on 9/1/2026. Public comment included Commissioner Cohen Higgins requesting clarification on the cost increase, Commissioner Lopez expressing concern about approving additional scopes without knowing costs, and Chairwoman Steinberg stating scope changes warrant closer scrutiny.

Board:
Board of County Commissioners
Date:
2026-09-01
Type:
Resolution
Decision:
Adopted
Address:
9150 Dadeland Boulevard, Miami, Florida 33156
Applicant:
BCC Engineering, LLC

CEI SERVICES FOR THE DADELAND SOUTH INTERMODAL STATION

Resolution adopted on 9/1/2026 authorizing Supplemental Agreement No. 1 with BCC Engineering, LLC for Construction, Engineering, and Inspection Services (CEI) for the Dadeland South Intermodal Station project, increasing the contract amount from $3,551,593.10 to $5,467,817.92. The project is located at the Dadeland South Metrorail Station, 9150 Dadeland Boulevard, Miami, Florida 33156. The supplemental agreement supports additional scope and a 264-day extension to the design-build contract, including integration of bus charging infrastructure, reconfiguration of the BRT platform, escalator replacements, and modifications to station access and circulation elements. Funding is from the People's Transportation Plan Bond Program. The Infrastructure, Innovation & Technology Committee forwarded it to the BCC with a favorable recommendation on 7/15/2026. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-09-01
Type:
Resolution
Decision:
Adopted
Address:
9150 Dadeland Boulevard, Miami, Florida 33156
Applicant:
BCC Engineering, LLC (acquired New Millennium Engineering, Inc.); Miami-Dade County Department of Transportation and Public Works (DTPW) as requester

CEI SERVICES FOR THE DADELAND SOUTH INTERMODAL STATION

Resolution authorizing Supplemental Agreement No. 1 with BCC Engineering, LLC for Construction, Engineering, and Inspection Services (CEI) for the Dadeland South Intermodal Station project, increasing the contract amount from $3,551,593.10 to $5,467,817.92. The project is located at the Dadeland South Metrorail Station, 9150 Dadeland Boulevard, Miami, Florida 33156. The supplemental agreement supports additional scope and a 264-day extension to the design-build contract, including integration of bus charging infrastructure, reconfiguration of the BRT platform, escalator replacements, and modifications to station access and circulation elements. The resolution was adopted on 9/1/2026. The Infrastructure, Innovation & Technology Committee forwarded it to the BCC with a favorable recommendation on 7/15/2026. The item was introduced on 7/14/2026. The funding source is the People's Transportation Plan Bond Program. The original PSA was approved on May 16, 2023 via Resolution No. R-462-23. The design-build contract was approved on July 18, 2023 via Resolution No. R-698-23. A supplemental agreement to the design-build contract was approved on November 4, 2025 via Resolution No. R-1068-25. The contingency allowance of $322,872.10 remains unchanged. The total fiscal impact is $1,916,224.82. The project is within Commission District 7, represented by Commissioner Raquel A. Regalado. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-09-01
Type:
Resolution
Decision:
Adopted
Address:
9150 Dadeland Boulevard, Miami, Florida 33156
Applicant:
BCC Engineering, LLC

CEI SERVICES FOR THE DADELAND SOUTH INTERMODAL STATION

Resolution adopted on 9/1/2026 authorizing Supplemental Agreement No. 1 with BCC Engineering, LLC for Construction, Engineering, and Inspection Services (CEI) for the Dadeland South Intermodal Station project, increasing the contract amount from $3,551,593.10 to $5,467,817.92. The project is located at the Dadeland South Metrorail Station, 9150 Dadeland Boulevard, Miami, Florida 33156. The amendment supports additional scope and a 264-day extension to the design-build contract, including integration of bus charging infrastructure, reconfiguration of the BRT platform, escalator replacements, and modifications to station access and circulation elements. Funding is from the People's Transportation Plan Bond Program. The Infrastructure, Innovation & Technology Committee forwarded it to the BCC with a favorable recommendation on 7/15/2026. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-09-01
Type:
Resolution
Decision:
Adopted
Address:
9150 Dadeland Boulevard, Miami, Florida 33156
Applicant:
BCC Engineering, LLC

CEI SERVICES FOR THE DADELAND SOUTH INTERMODAL STATION

Resolution authorizing Supplemental Agreement No. 1 with BCC Engineering, LLC for Construction, Engineering, and Inspection (CEI) services for the Dadeland South Intermodal Station project, increasing the contract amount from $3,551,593.10 to $5,467,817.92. The project is located at the Dadeland South Metrorail Station, 9150 Dadeland Boulevard, Miami, Florida 33156. The supplemental agreement supports additional scope and a 264-day extension to the design-build contract, including bus charging infrastructure, reconfiguration of the BRT platform, escalator replacements, and modifications to station access and circulation elements. The resolution was adopted on 9/1/2026. The Infrastructure, Innovation & Technology Committee forwarded it with a favorable recommendation on 7/15/2026. Public comment included Commissioner Cohen Higgins requesting clarification on the cost, Commissioner Lopez expressing concern about approving additional scopes without knowing costs, and Chairwoman Steinberg stating scope changes warrant closer scrutiny. The design-build project was valued at approximately $77 million. The original design-build contract was approved on July 18, 2023, with NV2A Group, LLC. The original CEI PSA was awarded on May 16, 2023, to New Millennium Engineering, Inc., subsequently acquired by BCC Engineering, LLC. A supplemental agreement to the design-build contract was approved on November 4, 2025.

Board:
Board of County Commissioners
Date:
2026-09-01
Type:
Resolution
Decision:
Adopted
Address:
9150 Dadeland Boulevard, Miami, Florida 33156
Applicant:
BCC Engineering, LLC

CEI SERVICES FOR THE DADELAND SOUTH INTERMODAL STATION

Resolution authorizing Supplemental Agreement No. 1 between BCC Engineering, LLC and Miami-Dade County for Construction, Engineering, and Inspection (CEI) services for the Dadeland South Intermodal Station project, increasing the contract amount from $3,551,593.10 to $5,467,817.92. The project is located at the Dadeland South Metrorail Station, 9150 Dadeland Boulevard, Miami, Florida 33156. The supplemental agreement supports additional scope and a 264-day extension to the design-build contract. The resolution was adopted on 9/1/2026. The Infrastructure, Innovation & Technology Committee forwarded it with a favorable recommendation on 7/15/2026. The design-build project is valued at approximately $77 million. The additional scope includes bus charging infrastructure, reconfiguration of the BRT platform, escalator replacements, and modifications to station access and circulation elements. The funding source is the People's Transportation Plan Bond Program. Public comment included Commissioner Cohen Higgins requesting clarification on the cost and expressing concern about the expansion of scope during transportation budget shortfalls; Commissioner Lopez expressing concern about approving additional scopes without knowing associated costs and questioning fairness to the competitive bidding process; Chairwoman Steinberg noting the late addition and lack of briefing opportunity, and stating scope changes warrant closer scrutiny; Commissioner Gonzalez inquiring about the original bid and why new requirements were not factored into the original scope.

Board:
Board of County Commissioners
Date:
2026-09-01
Type:
Resolution
Decision:
Adopted
Address:
9150 Dadeland Boulevard, Miami, Florida 33156
Applicant:
BCC Engineering, LLC

CEI SERVICES FOR THE DADELAND SOUTH INTERMODAL STATION

Resolution authorizing Supplemental Agreement No. 1 with BCC Engineering, LLC for Construction, Engineering, and Inspection Services for the Dadeland South Intermodal Station project, increasing the contract amount to $5,467,817.92. The project is located at the Dadeland South Metrorail Station, 9150 Dadeland Boulevard, Miami, Florida 33156. The supplemental agreement adds $1,916,224.82 to the original PSA amount of $3,551,593.10, funded by the People's Transportation Plan Bond Program. The additional scope includes integration of bus charging infrastructure, reconfiguration of the BRT platform, escalator replacements, and modifications to station access and circulation elements, plus a 264-day extension to the design-build contract. The resolution was adopted on 9/1/2026. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-09-01
Type:
Resolution
Decision:
Adopted
Address:
9150 Dadeland Boulevard, Miami, Florida 33156
Applicant:
BCC Engineering, LLC

CEI SERVICES FOR THE DADELAND SOUTH INTERMODAL STATION

The Miami-Dade Board of County Commissioners adopted Resolution R-748-26 (File Number 261323) on September 1, 2026, approving Supplemental Agreement No. 1 with BCC Engineering, LLC for Construction, Engineering, and Inspection (CEI) services for the Dadeland South Intermodal Station project. The agreement increases the maximum compensation from $3,551,593.10 to $5,467,817.92, an increase of $1,916,224.82, funded by the People's Transportation Plan Bond Program. The project is located at the Dadeland South Metrorail Station, 9150 Dadeland Boulevard, Miami, Florida 33156. The CEI services support a design-build project valued at approximately $77 million, with the agreement term matching the construction contract, which was extended by 264 days beyond its initial term of approximately 300 days. The additional scope includes electric vehicle charging infrastructure, work in the kiss-and-ride area and bus station, reconfiguration of the BRT platform, escalator replacements, and modifications to station access and circulation elements. The Infrastructure, Innovation & Technology Committee forwarded the item with a favorable recommendation on July 15, 2026. The original design-build contract was approved on July 18, 2023 with NV2A Group, LLC, and the original CEI PSA was awarded on May 16, 2023 to New Millennium Engineering, Inc., subsequently acquired by BCC Engineering, LLC. A supplemental agreement to the design-build contract was approved on November 4, 2025. Public comment included Commissioner Cohen Higgins requesting clarification on the total cost, term, and justification for the additional expenditure; Mr. Ferrer-Diaz explained the amount was for CEI services only, the term matched the construction contract, and the additional cost was due to 264 days of added work. Commissioner Cohen Higgins expressed concern about the expansion of scope during transportation budget shortfalls but supported the item. Commissioner Lopez expressed concern about approving additional scopes without knowing associated costs and questioned fairness to the competitive bidding process. Chairwoman Steinberg stated scope changes and change orders warranted closer scrutiny. Commissioner Gonzalez inquired about the original bid and when additional work became necessary.

Board:
Board of County Commissioners
Date:
2026-09-01
Type:
Resolution
Decision:
Adopted
Address:
9150 Dadeland Boulevard, Miami, Florida 33156
Applicant:
BCC Engineering, LLC

CEI SERVICES FOR THE DADELAND SOUTH INTERMODAL STATION

The Miami-Dade County Board of County Commissioners adopted Resolution R-748-26, approving Supplemental Agreement No. 1 with BCC Engineering, LLC for Construction, Engineering, and Inspection (CEI) services for the Dadeland South Intermodal Station project. The agreement increases the contract amount from $3,551,593.10 to $5,467,817.92, a $1,916,224.82 increase, to support a 264-day extension and additional scope for the design-build contract. The project is located at 9150 Dadeland Boulevard, Miami, Florida 33156. The design-build project is valued at approximately $77 million. The final action was on September 1, 2026. The Infrastructure, Innovation & Technology Committee forwarded the item with a favorable recommendation on July 15, 2026. The additional scope includes bus charging infrastructure, reconfiguration of the BRT platform, escalator replacements, and modifications to station access and circulation elements. The funding source is the People's Transportation Plan Bond Program. Public comment included Commissioner Cohen Higgins requesting clarification on the cost and scope, Commissioner Lopez expressing concern about approving additional scopes without knowing costs, and Chairwoman Steinberg stating that scope changes warrant closer scrutiny. Commissioner Cohen Higgins stated she would support the item based on the department's representation that the funding was necessary.

Board:
Board of County Commissioners
Date:
2026-09-01
Type:
Resolution
Decision:
Adopted
Address:
9150 Dadeland Boulevard, Miami, Florida 33156
Applicant:
BCC Engineering, LLC

CEI SERVICES FOR THE DADELAND SOUTH INTERMODAL STATION

Resolution authorizing Supplemental Agreement No. 1 with BCC Engineering, LLC for Construction, Engineering, and Inspection Services (CEI) for the Dadeland South Intermodal Station project. The agreement increases the contract amount from $3,551,593.10 to $5,467,817.92, an increase of $1,916,224.82. The project is located at the Dadeland South Metrorail Station, 9150 Dadeland Boulevard, Miami, Florida 33156. The design-build project is valued at approximately $77 million. The supplemental agreement supports additional scope and a 264-day extension to the design-build contract. The additional scope includes electric vehicle charging infrastructure, work in the kiss-and-ride area and bus station, reconfiguration of the BRT platform, escalator replacements, and modifications to station access and circulation elements. The resolution was adopted on 9/1/2026. The Infrastructure, Innovation & Technology Committee forwarded it to the BCC with a favorable recommendation on 7/15/2026. The item was introduced on 7/14/2026. The original design-build contract was approved on July 18, 2023 (Resolution No. R-698-23) with NV2A Group, LLC. The original PSA for CEI services was awarded on May 16, 2023 (Resolution No. R-462-23) to New Millennium Engineering, Inc., which was subsequently acquired by BCC Engineering, LLC. A supplemental agreement to the design-build contract was approved on November 4, 2025 (Resolution No. R-1068-25). The funding source is the People's Transportation Plan Bond Program. The project was added to the Five-Year Implementation Plan in February 2020. The agreement term matches the construction contract, which was extended by 264 days beyond its initial term of approximately 300 days, for a total of nearly two years. Payments average approximately $200,000 per month. The agreement is a time-and-materials contract with negotiated hours at contractually set rates. The contingency allowance of $322,872.10 remains unchanged. The project is within Commission District 7, represented by Commissioner Raquel A. Regalado. The CEI consultant is responsible for providing continuous oversight of construction activities, including contract administration, schedule and cost monitoring, inspection of civil, structural, electrical, and mechanical work, materials sampling and testing, quality assurance/quality control verification, coordination with stakeholders, and ensuring compliance with design criteria, safety requirements, and regulatory standards. The increased expenditure authority is required to support additional scope and a 264-day extension to the associated design-build contract, Contract No. CIP207-DTPW19-DB. The expanded scope includes integration of bus charging infrastructure, reconfiguration of the BRT platform, escalator replacements, and modifications to station access and circulation elements. The design-builder bid on a planning and scoping effort conducted several years earlier. Changes arose during design, both through modifications accepted by the County and through new permitting requirements for electric vehicle charging and fire suppression. The applicable National Fire Protection Association codes were still being written when the project was bid. The item also includes County-accepted design changes, including reconfiguring the bus pickup alignment from parallel to a seesaw design, escalator and elevator modifications, and added infrastructure for evacuation purposes. The evacuation requirements had not been included initially because the planning report had been vetted under the standards in effect at the time, which were subsequently modified before the project went to bid. The CEI cost had not accompanied the November 2025 supplemental agreement for the design-build contract. The Board authorized the additional design scope through a supplemental agreement approved on November 2, 2025. The original PSA was approved with a maximum compensation of $3,551,593.10. The total fiscal impact for this Supplemental Agreement is $1,916,224.82. The funding source is the Dadeland South Intermodal Station program, program number 2000001203, FY25-26 Adopted Budget & Multi-Year Capital Plan, Volume 2, Page 142, People's Transportation Plan Bond Program. Bassam Moubayed, CFM, Chief, Construction Division, DTPW, is responsible for the implementation and administration of this PSA. Due diligence was conducted, including verification of corporate status and checks of various databases and listings. No adverse findings were identified. The resolution authorizes the use of Charter County Transportation Surtax Funds for the Department of Transportation and Public Works included in the FY25-26 Adopted Capital Budget and FY25-29 Five-Year Implementation Plan of the People's Transportation Plan. The item was a late item and CITT was required. The resolution is R-748-26. The file number is 261323. The requester is Transportation and Public Works. The agenda date was 9/1/2026, agenda item number 8N9. The final action was on 9/1/2026. The Infrastructure, Innovation & Technology Committee meeting was on 7/15/2026, agenda item 3D. The Office of the Chairperson added the item on 8/31/2026. Roy Coley assigned the item on 7/14/2026. The County Attorney was assigned on 9/1/2026. Bruce Libhaber was assigned on 7/14/2026. The legislative history includes a report from the County Attorney dated 9/1/2026 stating 'DTPW - Late item - No sponsor - pending July cmte - County attorney Bruce Libhaber - no attachments - pgs 7'. The report from the Infrastructure, Innovation & Technology Committee on 7/15/2026 includes Commissioner Cohen Higgins requesting clarification on the item, given its late addition to the agenda, and asking whether the $5,467,817.92 total covered the provider's professional services alone or included construction costs, the term of the agreement, the aggregate value of the project, and the justification for the additional expenditure of approximately $1.9 million above the original $3.5 million allocation. Mr. Ferrer-Diaz explained that the amount was for CEI services only and did not include construction. He stated that the CEI team functioned as the County's on-site inspectors for the Dadeland South Intermodal Station project, reviewing construction specifications, materials, and testing; monitoring the contractor's schedule and budget; and conducting the first-pass review of invoicing and reimbursement requests, and that the County contracted out such services for projects of this magnitude. He advised that the agreement term matched the construction contract, which had been extended by 264 days beyond its initial term of approximately 300 days, for a total of nearly two years, and that payments averaged approximately $200,000 per month. He stated that the design-build project was valued at approximately $77 million and clarified that the agreement was a time-and-materials contract with negotiated hours at contractually set rates, rather than a percentage-based agreement, although CEI services generally fell within a range of about five percent of project cost. Mr. Ferrer-Diaz attributed the additional cost to the 264 days of work added to the construction project as a result of additional scope, including electric vehicle charging infrastructure and work in the kiss-and-ride area and bus station. He explained that the scope had been added based on operational needs related to the bus rapid transit (BRT) service and new requirements from permitting agencies, and that the Board had authorized the additional design scope through a supplemental agreement approved on November 2, 2025. He confirmed that the CEI cost had not accompanied that item and that the present supplemental corresponded to the work approved for the contractor at that time. Commissioner Cohen Higgins acknowledged the need for outside engineering expertise but expressed concern that the request stemmed from an expansion of scope at a time when the County faced transportation budget shortfalls. She stated that she would support the item based on the department's representation that the funding was necessary, and indicated she intended to closely examine the County's $2 billion transportation budget, including professional services agreements and whether percentage-based or time-and-materials calculations were appropriate. Chairwoman Steinberg noted she had also intended to raise questions on the item because of its late addition and the lack of an opportunity to be briefed. Commissioner Lopez expressed concern that the County frequently approved additional scopes of services without knowing the associated cost, as had occurred in November 2025, and questioned the fairness of that practice to the competitive bidding process. She stated that she would closely scrutinize such items during the budget cycle and was not prepared to approve items that had not been carefully planned from the outset. Commissioner Gonzalez commended Mr. Ferrer-Diaz for his preparedness and inquired about the original bid and scope of work and when the additional work became necessary. Mr. Ferrer-Diaz explained that the project originated from a planning and scoping effort conducted several years earlier, that the design-builder bid on that planning effort, and that changes arose during design, both through modifications accepted by the County and through new permitting requirements for electric vehicle charging and fire suppression. In response to Commissioner Gonzalez's question as to why those requirements had not been factored into the original scope given that the County issued the permits, he stated that the applicable National Fire Protection Association codes were still being written when the project was bid and that the more rigorous standards had affected several County projects. Asked whether the new standards accounted for the full increase, he noted that the item also included County-accepted design changes, including reconfiguring the bus pickup alignment from parallel to a seesaw design, escalator and elevator modifications, and added infrastructure for evacuation purposes. He explained that the evacuation requirements had not been included initially because the planning report had been vetted under the standards in effect at the time, which were subsequently modified before the project went to bid. Chairwoman Steinberg stated that scope changes and change orders warranted closer scrutiny, particularly where the changes originated with the County. Hearing no other questions or comments, the Committee proceeded to vote on the foregoing proposed resolution as presented.

Board:
Board of County Commissioners
Date:
2026-09-01
Type:
Resolution
Decision:
Adopted
Address:
9150 Dadeland Boulevard, Miami, Florida 33156
Applicant:
BCC Engineering, LLC

CEI SERVICES FOR THE DADELAND SOUTH INTERMODAL STATION

The Miami-Dade Board of County Commissioners adopted Resolution R-748-26, File Number 261323, authorizing Supplemental Agreement No. 1 with BCC Engineering, LLC for Construction, Engineering, and Inspection (CEI) services for the Dadeland South Intermodal Station project. The agreement increases the maximum compensation from $3,551,593.10 to $5,467,817.92, an increase of $1,916,224.82, funded by the People's Transportation Plan Bond Program. The project is located at the Dadeland South Metrorail Station, 9150 Dadeland Boulevard, Miami, Florida 33156. The design-build project is valued at approximately $77 million. The supplemental agreement supports additional scope and a 264-day extension to the design-build contract, including bus charging infrastructure, reconfiguration of the BRT platform, escalator replacements, and modifications to station access and circulation elements. The item was introduced on 7/14/2026, forwarded with a favorable recommendation by the Infrastructure, Innovation & Technology Committee on 7/15/2026, and adopted on 9/1/2026. Public comment included Commissioner Cohen Higgins requesting clarification on the cost and scope, Commissioner Lopez expressing concern about approving additional scopes without knowing associated costs and the fairness to competitive bidding, and Chairwoman Steinberg stating that scope changes and change orders warranted closer scrutiny. Commissioner Cohen Higgins stated she would support the item based on the department's representation that the funding was necessary. Commissioner Lopez stated she was not prepared to approve items that had not been carefully planned from the outset.

Board:
Board of County Commissioners
Date:
2026-09-01
Type:
Resolution
Decision:
Adopted
Address:
9150 Dadeland Boulevard, Miami, Florida 33156
Applicant:
BCC Engineering, LLC

CEI SERVICES FOR THE DADELAND SOUTH INTERMODAL STATION

The Miami-Dade County Board of County Commissioners adopted Resolution R-748-26, approving Supplemental Agreement No. 1 with BCC Engineering, LLC for Construction, Engineering, and Inspection (CEI) services for the Dadeland South Intermodal Station project. The agreement increases the contract amount from $3,551,593.10 to $5,467,817.92, a $1,916,224.82 increase, funded by the People's Transportation Plan Bond Program. The project is located at the Dadeland South Metrorail Station, 9150 Dadeland Boulevard, Miami, Florida 33156. The CEI services support a design-build project valued at approximately $77 million. The supplemental agreement is needed due to a 264-day extension to the design-build contract, which includes additional scope such as bus charging infrastructure, BRT platform reconfiguration, escalator replacements, and station access modifications. The Infrastructure, Innovation & Technology Committee forwarded the item with a favorable recommendation on 7/15/2026, and the final action was adoption on 9/1/2026. Public comment included Commissioner Cohen Higgins requesting clarification on costs and expressing concern about budget shortfalls, Commissioner Lopez expressing concern about approving additional scopes without knowing costs and its fairness to competitive bidding, and Chairwoman Steinberg stating scope changes and change orders warranted closer scrutiny.

Board:
Board of County Commissioners
Date:
2026-09-01
Type:
Resolution
Decision:
Adopted
Address:
9150 Dadeland Boulevard, Miami, Florida 33156
Applicant:
BCC Engineering, LLC

CEI SERVICES FOR THE DADELAND SOUTH INTERMODAL STATION

Resolution authorizing Supplemental Agreement No. 1 with BCC Engineering, LLC for Construction, Engineering, and Inspection (CEI) services for the Dadeland South Intermodal Station project, increasing the contract amount from $3,551,593.10 to $5,467,817.92. The project is located at the Dadeland South Metrorail Station, 9150 Dadeland Boulevard, Miami, Florida 33156. The design-build project is valued at approximately $77 million. The supplemental agreement supports additional scope and a 264-day extension to the design-build contract. The resolution was adopted on 9/1/2026. The Infrastructure, Innovation & Technology Committee forwarded it with a favorable recommendation on 7/15/2026. Public comment included concerns from Commissioner Cohen Higgins about the late addition, the cost increase, and the transportation budget; Commissioner Lopez expressed concern about approving additional scopes without knowing associated costs and the fairness to competitive bidding; Chairwoman Steinberg noted the late addition and lack of briefing; Commissioner Gonzalez asked about the original bid and scope. Staff explained the cost was for CEI services only, the term matched the extended construction contract, and the additional scope included electric vehicle charging infrastructure, work in the kiss-and-ride area and bus station, reconfiguring the bus pickup alignment, escalator and elevator modifications, and added infrastructure for evacuation purposes.

Board:
Board of County Commissioners
Date:
2026-09-01
Type:
Resolution
Decision:
Adopted
Address:
9150 Dadeland Boulevard, Miami, Florida 33156
Applicant:
BCC Engineering, LLC

CEI SERVICES FOR THE DADELAND SOUTH INTERMODAL STATION

The Miami-Dade County Board of County Commissioners adopted Resolution R-748-26 (File Number 261323) on September 1, 2026, authorizing Supplemental Agreement No. 1 with BCC Engineering, LLC for Construction, Engineering, and Inspection (CEI) services for the Dadeland South Intermodal Station project. The agreement increases the contract amount from $3,551,593.10 to $5,467,817.92, an increase of $1,916,224.82, funded by the People's Transportation Plan Bond Program. The project is located at the Dadeland South Metrorail Station, 9150 Dadeland Boulevard, Miami, Florida 33156, within Commission District 7. The design-build project is valued at approximately $77 million. The supplemental agreement supports a 264-day extension to the design-build contract (Contract No. CIP207-DTPW19-DB) approved by the Board on November 4, 2025 via Resolution No. R-1068-25. The expanded scope includes bus charging infrastructure, reconfiguration of the BRT platform, escalator replacements, and modifications to station access and circulation elements. The original PSA for CEI services was awarded on May 16, 2023 (Resolution No. R-462-23) to New Millennium Engineering, Inc., which was subsequently acquired by BCC Engineering, LLC. The design-build contract was approved on July 18, 2023 (Resolution No. R-698-23) with NV2A Group, LLC. The Infrastructure, Innovation & Technology Committee forwarded the item to the Board with a favorable recommendation on July 15, 2026. The item was introduced on July 14, 2026. The final action was on September 1, 2026. The CEI services include contract administration, schedule and cost monitoring, inspection of civil, structural, electrical, and mechanical work, materials sampling and testing, quality assurance/quality control verification, coordination with stakeholders, and ensuring compliance with design criteria, safety requirements, and regulatory standards. The agreement is a time-and-materials contract with negotiated hours at contractually set rates. Payments average approximately $200,000 per month. The agreement term matches the construction contract, which was extended by 264 days beyond its initial term of approximately 300 days, for a total of nearly two years. The contingency allowance of $322,872.10 remains unchanged. The program name and number is Dadeland South Intermodal Station / 2000001203. The monitor is Bassam Moubayed, CFM, Chief, Construction Division, DTPW. The requester is Transportation and Public Works. The item was a late item and CITT required. The resolution authorizes the use of Charter County Transportation Surtax Funds for the Department of Transportation and Public Works included in the FY25-26 Adopted Capital Budget and FY25-29 Five-Year Implementation Plan of the People's Transportation Plan. The project was added to the Five-Year Implementation Plan in February 2020. The additional cost is attributed to the 264 days of work added to the construction project as a result of additional scope, including electric vehicle charging infrastructure and work in the kiss-and-ride area and bus station. The scope was added based on operational needs related to the bus rapid transit (BRT) service and new requirements from permitting agencies. The Board authorized the additional design scope through a supplemental agreement approved on November 2, 2025. The applicable National Fire Protection Association codes were still being written when the project was bid, and the more rigorous standards affected several County projects. The item also includes County-accepted design changes, including reconfiguring the bus pickup alignment from parallel to a seesaw design, escalator and elevator modifications, and added infrastructure for evacuation purposes. The evacuation requirements had not been included initially because the planning report had been vetted under the standards in effect at the time, which were subsequently modified before the project went to bid. Due diligence was conducted, including verification of corporate status and checks of various databases and listings, with no adverse findings identified.

Board:
Board of County Commissioners
Date:
2026-09-01
Type:
Resolution
Decision:
Adopted
Address:
9150 Dadeland Boulevard, Miami, Florida 33156
Applicant:
BCC Engineering, LLC

CEI SERVICES FOR THE DADELAND SOUTH INTERMODAL STATION

The Miami-Dade County Board of County Commissioners adopted Resolution R-748-26 (File Number 261323) on September 1, 2026, authorizing Supplemental Agreement No. 1 with BCC Engineering, LLC for Construction, Engineering, and Inspection (CEI) services for the Dadeland South Intermodal Station project. The agreement increases the maximum compensation from $3,551,593.10 to $5,467,817.92, a fiscal impact of $1,916,224.82, funded by the People's Transportation Plan Bond Program. The project is located at the Dadeland South Metrorail Station, 9150 Dadeland Boulevard, Miami, Florida 33156, within Commission District 7. The design-build project is valued at approximately $77 million. The supplemental agreement supports a 264-day extension to the design-build contract (Contract No. CIP207-DTPW19-DB) approved by the Board on November 4, 2025 via Resolution No. R-1068-25. The expanded scope includes integration of bus charging infrastructure, reconfiguration of the BRT platform, escalator replacements, and modifications to station access and circulation elements. The Infrastructure, Innovation & Technology Committee forwarded the item to the BCC with a favorable recommendation on July 15, 2026. The original design-build contract was approved on July 18, 2023 with NV2A Group, LLC (Resolution No. R-698-23), and the original CEI PSA was awarded on May 16, 2023 to New Millennium Engineering, Inc. (Resolution No. R-462-23), which was subsequently acquired by BCC Engineering, LLC. The agreement term matches the construction contract, which was extended by 264 days beyond its initial term of approximately 300 days, for a total of nearly two years, with payments averaging approximately $200,000 per month. The CEI services are a time-and-materials contract with negotiated hours at contractually set rates, not a percentage-based agreement, although CEI services generally fall within a range of about five percent of project cost. The additional cost is attributed to the 264 days of work added to the construction project as a result of additional scope, including electric vehicle charging infrastructure, work in the kiss-and-ride area and bus station, reconfiguring the bus pickup alignment from parallel to a seesaw design, escalator and elevator modifications, and added infrastructure for evacuation purposes. The additional scope was based on operational needs related to bus rapid transit (BRT) service and new requirements from permitting agencies, including National Fire Protection Association codes that were still being written when the project was bid. The Board authorized the additional design scope through a supplemental agreement approved on November 2, 2025. The contingency allowance of $322,872.10 remains unchanged. The item was a late addition to the agenda and required CITT review. Public comment sentiment included Commissioner Cohen Higgins requesting clarification on whether the total covered professional services alone or included construction costs, the term of the agreement, the aggregate value of the project, and the justification for the additional expenditure; she acknowledged the need for outside engineering expertise but expressed concern about the expansion of scope at a time of transportation budget shortfalls, and stated she would support the item based on the department's representation that the funding was necessary. Chairwoman Steinberg noted she had intended to raise questions due to the late addition and lack of opportunity to be briefed. Commissioner Lopez expressed concern that the County frequently approved additional scopes of services without knowing the associated cost, questioned the fairness to the competitive bidding process, and stated she was not prepared to approve items that had not been carefully planned from the outset. Commissioner Gonzalez commended Mr. Ferrer-Diaz for his preparedness and inquired about the original bid and scope of work. Chairwoman Steinberg stated that scope changes and change orders warranted closer scrutiny, particularly where the changes originated with the County.

Board:
Board of County Commissioners
Date:
2026-09-01
Type:
Resolution
Decision:
Adopted
Address:
9150 Dadeland Boulevard, Miami, Florida 33156
Applicant:
BCC Engineering, LLC

CEI SERVICES FOR THE DADELAND SOUTH INTERMODAL STATION

The Miami-Dade County Board of County Commissioners adopted Resolution R-748-26 (File Number 261323) on September 1, 2026, authorizing Supplemental Agreement No. 1 with BCC Engineering, LLC for Construction, Engineering, and Inspection (CEI) services for the Dadeland South Intermodal Station project. The agreement increases the contract amount from $3,551,593.10 to a total not to exceed $5,467,817.92, a fiscal impact of $1,916,224.82, funded by the People's Transportation Plan Bond Program. The project is located at the Dadeland South Metrorail Station, 9150 Dadeland Boulevard, Miami, Florida 33156, within Commission District 7. The CEI services are for the design-build project valued at approximately $77 million. The supplemental agreement is needed due to a 264-day extension to the design-build contract (Contract No. CIP207-DTPW19-DB) and additional scope including bus charging infrastructure, reconfiguration of the BRT platform, escalator replacements, and modifications to station access and circulation elements. The Infrastructure, Innovation & Technology Committee forwarded the item with a favorable recommendation on July 15, 2026. The item was introduced on July 14, 2026. The original CEI PSA was awarded on May 16, 2023 (Resolution No. R-462-23) to New Millennium Engineering, Inc., subsequently acquired by BCC Engineering, LLC. The design-build contract was approved on July 18, 2023 (Resolution No. R-698-23) with NV2A Group, LLC. A supplemental agreement to the design-build contract was approved on November 4, 2025 (Resolution No. R-1068-25). The agreement term matches the construction contract, which was extended by 264 days beyond its initial term of approximately 300 days, for a total of nearly two years. Payments average approximately $200,000 per month. The agreement is a time-and-materials contract with negotiated hours at contractually set rates. The additional cost is attributed to the 264 days of work added to the construction project as a result of additional scope, including electric vehicle charging infrastructure, work in the kiss-and-ride area and bus station, reconfiguring the bus pickup alignment from parallel to a seesaw design, escalator and elevator modifications, and added infrastructure for evacuation purposes. The additional scope was based on operational needs related to bus rapid transit (BRT) service and new requirements from permitting agencies, including National Fire Protection Association codes that were still being written when the project was bid. The contingency allowance of $322,872.10 remains unchanged. The CEI consultant is responsible for continuous oversight of construction activities, including contract administration, schedule and cost monitoring, inspection of civil, structural, electrical, and mechanical work, materials sampling and testing, quality assurance/quality control verification, coordination with stakeholders, and ensuring compliance with design criteria, safety requirements, and regulatory standards. Due diligence was conducted with no adverse findings. Bassam Moubayed, CFM, Chief, Construction Division, DTPW, is responsible for implementation and administration. The item was a late item and CITT required. The project was added to the Five-Year Implementation Plan in February 2020.

Board:
Board of County Commissioners
Date:
2026-09-01
Type:
Resolution
Decision:
Adopted
Address:
9150 Dadeland Boulevard, Miami, Florida 33156
Applicant:
BCC Engineering, LLC

CEI SERVICES FOR THE DADELAND SOUTH INTERMODAL STATION

The Miami-Dade County Board of County Commissioners adopted Resolution R-748-26 (File Number 261323) on September 1, 2026, authorizing Supplemental Agreement No. 1 with BCC Engineering, LLC for Construction, Engineering, and Inspection (CEI) services for the Dadeland South Intermodal Station project. The agreement increases the contract amount from $3,551,593.10 to $5,467,817.92, an increase of $1,916,224.82, funded by the People's Transportation Plan Bond Program. The project is located at the Dadeland South Metrorail Station, 9150 Dadeland Boulevard, Miami, Florida 33156. The design-build project is valued at approximately $77 million. The supplemental agreement supports additional scope and a 264-day extension to the design-build contract, including bus charging infrastructure, reconfiguration of the BRT platform, escalator replacements, and modifications to station access and circulation elements. The Infrastructure, Innovation & Technology Committee forwarded the item with a favorable recommendation on July 15, 2026. During the committee meeting, Commissioner Cohen Higgins requested clarification on the cost and scope, and expressed concern about the expansion of scope during transportation budget shortfalls. Commissioner Lopez expressed concern about approving additional scopes without knowing associated costs and questioned fairness to the competitive bidding process. Chairwoman Steinberg stated that scope changes and change orders warranted closer scrutiny. Commissioner Gonzalez commended Mr. Ferrer-Diaz for his preparedness. The final action was adoption on September 1, 2026.

Board:
Board of County Commissioners
Date:
2026-09-01
Type:
Resolution
Decision:
Adopted
Address:
9150 Dadeland Boulevard, Miami, Florida 33156
Applicant:
BCC Engineering, LLC

CEI SERVICES FOR THE DADELAND SOUTH INTERMODAL STATION

The Miami-Dade Board of County Commissioners adopted Resolution R-748-26, approving Supplemental Agreement No. 1 with BCC Engineering, LLC for Construction, Engineering, and Inspection (CEI) services for the Dadeland South Intermodal Station project. The agreement increases the contract amount from $3,551,593.10 to $5,467,817.92, a $1,916,224.82 increase, and extends the term by 264 days. The project is located at the Dadeland South Metrorail Station, 9150 Dadeland Boulevard, Miami, Florida 33156. The design-build project is valued at approximately $77 million. The additional scope includes bus charging infrastructure, reconfiguration of the BRT platform, escalator replacements, and modifications to station access and circulation elements. The Infrastructure, Innovation & Technology Committee forwarded the item with a favorable recommendation on 7/15/2026, and the Board adopted it on 9/1/2026. Public comment included Commissioner Cohen Higgins requesting clarification on the cost and scope, Commissioner Lopez expressing concern about approving additional scopes without knowing associated costs, and Chairwoman Steinberg stating that scope changes and change orders warrant closer scrutiny.

Board:
Board of County Commissioners
Date:
2026-09-01
Type:
Resolution
Decision:
Adopted
Address:
9150 Dadeland Boulevard, Miami, Florida 33156
Applicant:
BCC Engineering, LLC

CEI SERVICES FOR THE DADELAND SOUTH INTERMODAL STATION

Resolution authorizing Supplemental Agreement No. 1 with BCC Engineering, LLC for Construction, Engineering, and Inspection Services (CEI) for the Dadeland South Intermodal Station project, increasing the contract amount from $3,551,593.10 to $5,467,817.92 (an increase of $1,916,224.82) and extending the CEI scope by 264 days to match the design-build contract extension. The project is located at the Dadeland South Metrorail Station, 9150 Dadeland Boulevard, Miami, Florida 33156, within Commission District 7. The supplemental agreement adds scope including bus charging infrastructure integration, BRT platform reconfiguration, escalator replacements, and station access/circulation modifications. Funding is from the People's Transportation Plan Bond Program. The item was forwarded to the Board of County Commissioners with a favorable recommendation by the Infrastructure, Innovation & Technology Committee on 7/15/2026, and is scheduled for Board consideration on 9/1/2026. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-09-01
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation (by Infrastructure, Innovation & Technology Committee on 7/15/2026); pending BCC approval on 9/1/2026
Address:
9150 Dadeland Boulevard, Miami, Florida 33156
Applicant:
BCC Engineering, LLC (acquired from New Millennium Engineering, Inc.)

CEI SERVICES FOR THE DADELAND SOUTH INTERMODAL STATION

Resolution R-748-26, adopted 9/1/2026, authorizes Supplemental Agreement No. 1 with BCC Engineering, LLC for Construction, Engineering, and Inspection Services (CEI) for the Dadeland South Intermodal Station project. The agreement increases the contract amount from $3,551,593.10 to $5,467,817.92, funded by the People's Transportation Plan Bond Program. The project is located at 9150 Dadeland Boulevard, Miami, Florida 33156. The supplemental agreement supports a 264-day extension and expanded scope including bus charging infrastructure, BRT platform reconfiguration, escalator replacements, and station access modifications. The Infrastructure, Innovation & Technology Committee forwarded it with a favorable recommendation on 7/15/2026. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-09-01
Type:
Resolution
Decision:
Adopted
Address:
9150 Dadeland Boulevard, Miami, Florida 33156
Applicant:
BCC Engineering, LLC

Mira los negocios reales detrás de estos números

Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.

Crea tu cuenta