CHANGE ORDER #2 TGSV ENTERPRISES (W-949)
Resolution R-752-26, File Number 261438, adopted September 1, 2026, ratifies Change Order No. 2 to Contract No. W-949 between Miami-Dade County and TGSV Enterprises Inc. for High Service Pump Station Room Electrical Upgrades at the John E. Preston Water Treatment Plant. The change order is a net-zero monetary reallocation of $2,754,126.76 and grants a 12-calendar-day non-compensable time extension, extending the Final Completion Date from September 28, 2025 to October 10, 2025. The project is completed. The work included upsizing motors and VFDs to 1,750 horsepower, switchgear manufacturer modifications, extended guarantees, and water infiltration corrective work. A phased approach defers remaining electrical installation to a future Phase II contract. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted (ratified) on September 1, 2026.
- Address:
- Not stated. The project is at the John E. Preston Water Treatment Plant, located in District 6, represented by Commissioner Natalie Milian Orbis.
- Applicant:
- Miami-Dade Water and Sewer Department (WASD); Contractor: TGSV Enterprises Inc.
CHANGE ORDER #2 TGSV ENTERPRISES (W-949)
Resolution R-752-26, File Number 261438, adopted 9/1/2026, ratifies Change Order No. 2 to Contract No. W-949 between Miami-Dade County and TGSV Enterprises Inc. for High Service Pump Station Room Electrical Upgrades at the John E. Preston Water Treatment Plant. Change Order No. 2 is a net-zero monetary reallocation of $2,754,126.76 and grants a 12-calendar-day non-compensable time extension, extending the Final Completion Date from September 28, 2025 to October 10, 2025. The project is complete. The reallocation funds manufacturer-required modifications to motors, variable frequency drives, switchgear, and related electrical components. Work includes medium voltage motors and VFDs ($1,554,818.10), switchgear manufacturer modifications ($1,112,470.26), reduced voltage soft starter extended guarantees ($86,838.40), and water infiltration corrective work ($139,305.37). The project is located in District 6, represented by Commissioner Natalie Milian Orbis. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- TGSV Enterprises Inc.
CHANGE ORDER #2 TGSV ENTERPRISES (W-949)
Resolution R-752-26, File Number 261438, adopted September 1, 2026, ratifies Change Order No. 2 to Contract No. W-949 between Miami-Dade County and TGSV Enterprises Inc. for High Service Pump Station Room Electrical Upgrades at the John E. Preston Water Treatment Plant. Change Order No. 2 is a net-zero monetary reallocation of $2,754,126.76 and grants a 12-calendar-day non-compensable time extension, revising the Final Completion Date from September 28, 2025 to October 10, 2025. The project is completed. The work includes upsizing motors and VFDs to 1,750 horsepower, switchgear manufacturer modifications, extended guarantees, and a water infiltration corrective work time extension. A phased approach defers remaining electrical installation to a future Phase II contract. The original contract award was $15,007,598.00, awarded April 24, 2023, ratified May 2, 2023 via Resolution R-417-23. Change Order No. 1 was ratified June 4, 2024 via Resolution R-495-24. The project is located in District 6, represented by Commissioner Natalie Milian Orbis. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- TGSV Enterprises Inc.
CHANGE ORDER #2 TGSV ENTERPRISES (W-949)
Resolution R-752-26, File Number 261438, adopted September 1, 2026, ratifies Change Order No. 2 to Contract No. W-949 between Miami-Dade County and TGSV Enterprises Inc. for High Service Pump Station Room Electrical Upgrades at the John E. Preston Water Treatment Plant. Change Order No. 2 is a net-zero monetary reallocation of $2,754,126.76 and grants a 12-calendar-day non-compensable time extension, extending the Final Completion Date from September 28, 2025 to October 10, 2025. The project is located in District 6, represented by Commissioner Natalie Milian Orbis. The original contract award was $15,007,598.00 with a Contingency Allowance of $1,329,135.00, awarded April 24, 2023, and ratified May 2, 2023 via Resolution R-417-23. Notice to Proceed was issued July 24, 2023. Change Order No. 1 was ratified June 4, 2024 via Resolution R-495-24. The work includes upsizing motors and VFDs to 1,750 horsepower, switchgear manufacturer modifications, and extended guarantees. A phased approach defers remaining electrical installation to a future Phase II contract. The project is completed. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- TGSV Enterprises Inc.
CHANGE ORDER #2 TGSV ENTERPRISES (W-949)
Resolution R-752-26, File Number 261438, adopted 9/1/2026, ratifies Change Order No. 2 to Contract W-949 between Miami-Dade County and TGSV Enterprises Inc. for High Service Pump Station Room Electrical Upgrades at the John E. Preston Water Treatment Plant. Change Order No. 2 is a net-zero monetary reallocation of $2,754,126.76 and grants a 12-calendar-day non-compensable time extension, extending the Final Completion Date from September 28, 2025 to October 10, 2025. The Project has been completed. Work includes upsizing motors and VFDs to 1,750 horsepower, switchgear manufacturer modifications, extended guarantees, and water infiltration corrective work. A future Phase II contract will complete remaining electrical installation work.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Miami-Dade County Water & Sewer Department; TGSV Enterprises Inc. (Contractor)
CHANGE ORDER #2 TGSV ENTERPRISES (W-949)
Resolution R-752-26, adopted September 1, 2026, ratifies Change Order No. 2 to Contract No. W-949 between Miami-Dade County and TGSV Enterprises Inc. for High Service Pump Station Room Electrical Upgrades at the John E. Preston Water Treatment Plant. The change order is a net-zero monetary reallocation of $2,754,126.76 and grants a 12-calendar-day non-compensable time extension, revising the Final Completion Date from September 28, 2025 to October 10, 2025. The project is completed. The work includes upsizing motors and VFDs to 1,750 horsepower, switchgear manufacturer modifications, extended guarantees, and a water infiltration corrective work time extension. A future Phase II contract will complete remaining electrical installation work. No public comment or stakeholder sentiment is stated.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- John E. Preston Water Treatment Plant, District 6, Miami-Dade County
- Applicant:
- Miami-Dade Water and Sewer Department; Contractor: TGSV Enterprises Inc.
CHANGE ORDER #2 TGSV ENTERPRISES (W-949)
Resolution R-752-26, File Number 261438, adopted September 1, 2026, ratifies Change Order No. 2 to Contract No. W-949 between Miami-Dade County and TGSV Enterprises Inc. for High Service Pump Station Room Electrical Upgrades at the John E. Preston Water Treatment Plant. The change order is a net-zero monetary reallocation of $2,754,126.76 and grants a 12-calendar-day non-compensable time extension, revising the Final Completion Date from September 28, 2025 to October 10, 2025. The project is completed. The work included upsizing motors and VFDs to 1,750 horsepower, switchgear manufacturer modifications, and extended guarantees. A phased approach defers remaining electrical installation to a future Phase II contract. The project is located in District 6, represented by Commissioner Natalie Milian Orbis. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- TGSV Enterprises Inc.
CHANGE ORDER #2 TGSV ENTERPRISES (W-949)
Resolution R-752-26, File Number 261438, adopted September 1, 2026, ratifies Change Order No. 2 to Contract No. W-949 between Miami-Dade County and TGSV Enterprises Inc. for High Service Pump Station Room Electrical Upgrades at the John E. Preston Water Treatment Plant. The change order is a net-zero monetary reallocation of $2,754,126.76 and grants a 12-calendar-day non-compensable time extension, revising the Final Completion Date from September 28, 2025 to October 10, 2025. The project is completed. The work includes upsizing motors and VFDs from 1,500 to 1,750 horsepower, switchgear manufacturer modifications, and extended guarantees. The remaining electrical installation work will be completed under a future Phase II contract. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- TGSV Enterprises Inc.
CHANGE ORDER #2 TGSV ENTERPRISES (W-949)
Resolution ratifying Change Order No. 2 to Contract No. W-949 between Miami-Dade County and TGSV Enterprises Inc. for High Service Pump Station Room Electrical Upgrades at the John E. Preston Water Treatment Plant. Change Order No. 2 is a net-zero monetary reallocation of $2,754,126.76 and grants a 12-calendar-day non-compensable time extension, extending the Final Completion Date from September 28, 2025 to October 10, 2025. The project is completed. The document does not state a street address, acreage, or number of units/lots. The project is located in District 6, represented by Commissioner Natalie Milian Orbis. The original contract award was $15,007,598.00, awarded April 24, 2023, ratified May 2, 2023 via Resolution No. R-417-23. Change Order No. 1 was ratified June 4, 2024 via Resolution No. R-495-24. The reallocation funds manufacturer-required modifications to critical electrical equipment, including upsized motors and switchgear changes. Remaining electrical work will be completed under a new competitively procured Phase II contract. The document states no public comment or stakeholder sentiment.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- In Draft; pending BCC assignment; agenda date 9/1/2026; recommendation is to ratify Change Order No. 2
- Applicant:
- TGSV Enterprises Inc. (Contractor); Miami-Dade County (Owner); Miami-Dade Water and Sewer Department (Requester)
CHANGE ORDER #2 TGSV ENTERPRISES (W-949)
Resolution R-752-26, File Number 261438, adopted September 1, 2026, ratifies Change Order No. 2 to Contract No. W-949 between Miami-Dade County and TGSV Enterprises Inc. for High Service Pump Station Room Electrical Upgrades at the John E. Preston Water Treatment Plant. Change Order No. 2 is a net-zero monetary reallocation of $2,754,126.76 and grants a 12-calendar-day non-compensable time extension, revising the Final Completion Date from September 28, 2025 to October 10, 2025. The project is located in District 6, represented by Commissioner Natalie Milian Orbis. The original contract award was $15,007,598.00 with a Contingency Allowance of $1,329,135.00, awarded April 24, 2023, ratified May 2, 2023 via Resolution R-417-23, with Notice to Proceed issued July 24, 2023. Change Order No. 1 was ratified June 4, 2024 via Resolution R-495-24. The project included upsizing motors and VFDs to 1,750 horsepower, switchgear manufacturer modifications, and extended guarantees. The remaining electrical installation work will be completed under a new competitively procured Phase II contract. The project has been completed. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- TGSV Enterprises Inc.
CHANGE ORDER #2 TGSV ENTERPRISES (W-949)
Resolution R-752-26, File Number 261438, adopted September 1, 2026, ratifies Change Order No. 2 to Contract No. W-949 between Miami-Dade County and TGSV Enterprises Inc. for High Service Pump Station Room Electrical Upgrades at the John E. Preston Water Treatment Plant. The change order is a net-zero monetary reallocation of $2,754,126.76 and grants a 12-calendar-day non-compensable time extension, extending the Final Completion Date from September 28, 2025 to October 10, 2025. The project is located in District 6, represented by Commissioner Natalie Milian Orbis. The original contract award was $15,007,598.00, awarded April 24, 2023, with Notice to Proceed issued July 24, 2023. The project involved upgrading electrical and control systems, including upsizing motors and VFDs from 1,500 to 1,750 horsepower, switchgear modifications, and extended guarantees. The project has been completed, with remaining activity limited to procurement of equipment for a future Phase II contract. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted (ratified) on September 1, 2026
- Applicant:
- TGSV Enterprises Inc. (Contractor); Miami-Dade County (Owner); Miami-Dade Water and Sewer Department (WASD)
CHANGE ORDER #2 TGSV ENTERPRISES (W-949)
Resolution ratifying Change Order No. 2 to Contract No. W-949 between Miami-Dade County and TGSV Enterprises Inc. for High Service Pump Station Room Electrical Upgrades at the John E. Preston Water Treatment Plant. Change Order No. 2 is a net-zero monetary reallocation in the amount of $2,754,126.76 and grants a 12 calendar-day non-compensable time extension. The project is located in District 6. The total contract award was $15,007,598.00. The Final Completion Date is extended from September 28, 2025 to October 10, 2025. The project is completed. The document does not state a street address, parcel, or acreage. The document does not state any public comment or stakeholder sentiment.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- In Draft; pending BCC ratification
- Applicant:
- TGSV Enterprises Inc.
CHANGE ORDER #2 TGSV ENTERPRISES (W-949)
The document is a legislative item for a resolution ratifying Change Order No. 2 to Contract No. W-949 between Miami-Dade County and TGSV Enterprises Inc. for High Service Pump Station Room Electrical Upgrades at the John E. Preston Water Treatment Plant. The change order is a net-zero monetary reallocation of $2,754,126.76 and grants a 12-calendar-day non-compensable time extension, extending the Final Completion Date from September 28, 2025 to October 10, 2025. The project is located in District 6. The total Contract award was $15,007,598.00. The change order funds modifications to motors, variable frequency drives, switchgear, and related electrical components. The project has been completed. The resolution is in draft status and is scheduled for the Board of County Commissioners agenda on September 1, 2026, as item 8O5. The document does not state any public comment or stakeholder sentiment.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- In Draft; pending Board of County Commissioners assignment; scheduled for agenda on September 1, 2026
- Applicant:
- TGSV Enterprises Inc.
CHANGE ORDER #2 TGSV ENTERPRISES (W-949)
Resolution R-752-26 (File Number 261438) ratifies Change Order No. 2 to Contract No. W-949 between Miami-Dade County and TGSV Enterprises Inc. for High Service Pump Station Room Electrical Upgrades at the John E. Preston Water Treatment Plant. The change order is a net-zero monetary reallocation of $2,754,126.76 and grants a 12-calendar-day non-compensable time extension, extending the Final Completion Date from September 28, 2025 to October 10, 2025. The project is completed. The change order funds modifications to motors, VFDs, switchgear, and related components, and includes a phased approach with a future Phase II contract. Adopted on 9/1/2026.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- TGSV Enterprises Inc.
CODESIGNATION - CELIA CRUZ WAY
The document is a resolution adopted by the Miami-Dade County Board of County Commissioners approving the Florida Legislature's codesignation of a portion of S.R. 932/NW 103rd Street/49th Street within the City of Hialeah as 'Celia Cruz Way'. The resolution was adopted on 9/1/2026. No construction or development project is described.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- S.R. 932/NW 103rd Street/49th Street within the City of Hialeah
CODESIGNATION - CELIA CRUZ WAY
Resolution approving the Florida Legislature's codesignation of a portion of S.R. 932/NW 103rd Street/49th Street within the City of Hialeah as 'Celia Cruz Way'. Adopted by the Board of County Commissioners on 9/1/2026. File Number 261430, Resolution R-698-26. Introduced 8/14/2026. No applicant or developer is stated; the requester is listed as NONE. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- S.R. 932/NW 103rd Street/49th Street within the City of Hialeah
- Applicant:
- not stated; requester listed as NONE
CODESIGNATION - CELIA CRUZ WAY
Resolution approving the Florida Legislature's codesignation of a portion of S.R. 932/NW 103rd Street/49th Street within the City of Hialeah as 'Celia Cruz Way'. The resolution was adopted on 9/1/2026. The document does not state a project size, zoning change, applicant, or business opportunity. Public comment sentiment is not stated.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- S.R. 932/NW 103rd Street/49th Street within the City of Hialeah
CODESIGNATION - CELIA CRUZ WAY
The Board of County Commissioners adopted Resolution R-698-26 approving the Florida Legislature's codesignation of a portion of S.R. 932/NW 103rd Street/49th Street within the City of Hialeah as 'Celia Cruz Way'. The resolution was introduced on 8/14/2026 and adopted on 9/1/2026. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- S.R. 932/NW 103rd Street/49th Street within the City of Hialeah
CODESIGNATION - CELIA CRUZ WAY
Resolution approving the Florida Legislature's codesignation of a portion of S.R. 932/NW 103rd Street/49th Street within the City of Hialeah as 'Celia Cruz Way'. The resolution was adopted on 9/1/2026. The document does not state a project size, zoning change, or applicant. The case file number is 261430, reference R-698-26. The document does not state any public comment or stakeholder sentiment.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- S.R. 932/NW 103rd Street/49th Street within the City of Hialeah
CODESIGNATION - CELIA CRUZ WAY
Resolution approving the Florida Legislature's codesignation of a portion of S.R. 932/NW 103rd Street/49th Street within the City of Hialeah as 'Celia Cruz Way'. Adopted by the Board of County Commissioners on 9/1/2026. File number 261430, reference R-698-26. Introduced 8/14/2026. No applicant or developer is stated; the resolution is a legislative matter. No public comment or stakeholder sentiment is stated.
- Board:
- Board of County Commissioners
- Date:
- 2026-09-01
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- S.R. 932/NW 103rd Street/49th Street within the City of Hialeah